RECOMMENDATIONS FOR ESTABLISHMENT & OPERATION:
PHASE OF ESTABLISHMENT:
The first 2 Years after construction are crucial for the performance of the VBFS.
“Ensure the right plant selection (refer "Healthy Waterways" for plant selection)
*“*During dry periods provide sufficient watering
“Perform regular weed removal
****Replace not established plants where required
OPERATIONAL PHASE:
e Perform routine inspections of the raingarden (VBFS) to identify any areas of obvious increased sediment deposition, scouring from
storm flows,
RECOMMENDATION:
| erosion of the batters from lateral inflows and clogging
Perform routine inspections of the inflow systems in particular the grated drain and clean the grated drain regular from debris and litter
Perform routine inspections of the surface of the raingarden and clean from litter and gross pollutants
Remove sediment build ups in the raingarden
Repair any damage from vehicle traffic
Provide regular irrigation/watering during extended dry periods
Remove any invasive weeds at any time
Remove plants that have died and replace them
Perform regular pruning as to Landscape Architects schedule to encourage growth and healthy establishment of plants
Perform vegetation pest minotoring and control as to Landscape Architects schedule
THE RAINGARDEN IS PROPOSED TO BE A STORMWATER TREATMENT DEVICE AS OPPOSED TO A NORMAL GARDEN
BED. WE RECOMMEND TO SET UP A SIGN EXPLAINING THE PURPOSE OF THE RAINGARDEN.
WIDTH AS SPECIFIED IN PLAN
VEGETATED BIO RETENTION SYSTEM LENGTH AS SPECIFIED IN PLAN
Use for mulching: LUCERN, WOODCHIP OR EQUIVALENT.
WIDTH AS SPECIFIED IN PLAN
FILTER LAYER:
Clay
Silt
Very Fine Sand
Fine Sand
Med./Coarse Sand 60-70%
Coarse Sand
2-4% (<0.002mm)
4-8% (0.002-0.05mm)
5-10%(0.05-0.15mm)
10-25% (0.15-0.25mm)
(0.25-1.0mm)
7-10%(1.0-2.0mm)
TRANSITION LAYER:
Provide PVC perforated pipe with
diameter as specified in plan.
Minimum 2 off.
MAINTENANCE PLAN
VEGETATED BIO FILTER STRIP SOIL
Provide base grade at 0.5
'% (1:200)
Coarse Sand___ 100% __0.5-2mm
DRAINAGE LAYER:
oO CO Fine Gravel 100% 2-5 mm
Connect subsoil
drainage to stormwater
infrastructure as
specified in plan.
SPECIFICATION
(NOT TO SCALE)
NOTES:
1. Provide selected plants as to specification of
"Healthy Waterways” http://www.healthywaterways.org/
2. Provide "FOREBAY’ made of rocks and pebbles. For
scour protection. Refer detailed design for area.
WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FOR SOUTH EAST
QUEENSLAND (Chapter 5, Item 5.6).
The maintenance of the bioretention basin elements involve:
e — Routine inspection of the bioretention basin profile to identify any areas of obvious increased sediment
NOTES:
1.
2.
3.
Use LUCERN OR EQUIVALENT for mulching
Do not use organic Soils or soil fractions
for filter layer.
Provide a suitable irragation system required
for the establishment of the plants and for
use in extended dry periods. Irragation
system shall be supplied from the
harvesting tanks.
Do not use any geotextile or related
products between filter and transition or
between transition and drainage layers.
. Geotextiles may be used in addition to the
impermeable concrete & block surrounds.
. Provide flush out points for subsurface
drainage.
deposition, scouring from storm flows, rill erosion of the batters from lateral inflows, damage to the profile
from vehicles and clogging of the bioretention basin (evident of "boggy
e — Routine inspection of inflows systems, overflow pits and under-drains to identify and clean any areas of
scour, litter build
up and blockages.
appropriate fill (to match onsite soils) and revegetating.
the plant schedule.
e Vegetation pest monitoring and control.
Refer "Water by design" by HEALTHY WATERWAYS.
ilter media surface).
Removal of sediment where it is smothering the bioretention basin vegetation.
e Where a sediment forebay is adopted, removal of accumulated sediment.
Repairing any damage to the profile resulting from scour, rill erosions or vehicle damage by replacement of
Pruning to remove dead or diseased vegetation material and to stimulate growth.
Tilling of the bioretention basin surface, or removal of the surface layer, if there is evidence of clogging.
Regular watering/irrigation of vegetation until plants are established and actively growing.
Removal and management of invasive weeds (herbicides should not be used).
Removal of plants that have died and replacement with plants of equivilant size and species as detailed in
HARVESTING
&
RETENTION
TANK
DRIVEWAY
562m 2 5
ee
DRIVEWAY
S
BIO RETENTION SYSTEM BRS3/1
382m? 5
ee
BIO RETENTION SYSTEM B
BIO RETENTION SYSTEM BRS 3/3
TREATMENT TRAIN
BIORETENTION FILTER & RAINGARDEN MAINTENANCE CHECKLIST
BODY . :
CORPORATE NAME: DATE:
RESPONSIBILITY CENTRE . .
MANAGEMENT NAME: DATE:
OWNER NAME: DATE:
PROVIDE NAME AND DETAILS OF
MONTHLY CONSULTANT IF APPOINTED:
INSPECTION QUARTER
FREQUENCY 6—MONTHLY
DROUGHT
AFTER EVENT
INSPECTION ITEMS Yes _|No ACTION REQUIRED
Overall appearance healthy?
Overall appearance clean?
Gross litter _on surface?
Sediment accumulation at inlet?
Sediment accumulation on pebble surface?
Sediment accumulation at pipe outlets?
Sediment accumulation in bypass chamber?
Erosion at forebay?
Erosion at overflow?
Any other erosion?
Damage of support structure?
Any other traffic damage present?
Damage to grates and lids?
Visual plant health ok?
Weeds apparent? Weeding required?
Watering required?
Irrigation functional?
Replanting required?
Mowing/slashing/pruning required?
Surface clogging ible?
Excess ponding evident?
Flushing required?
Point of discharge inspected (pit/headwall/swale/creek)?
OTHER
OBSERVATIONS
SIGNATURE & DATE:
NOTE: A4 COPIES OF THE FORM CAN BE OBTAINED BY CONSTRUCTION HYDRAULIC
Heater
>60°C
HWS
SPECIFICATIONS
TANK SPECIFICATION
TANK SIZE: 10,000 LITRE
DESCRIPTION: PRECAST
PUMP SPECIFICATION
MANUFACTURER: TBC
MODEL: TBC
SWITCHOVER DEVICE SPECIFICAITON
MANUFACTURER: TBC
MODEL: TBC
RAINWATER FILTRATION SPECIFICATION
MANUFACTURER: TBC
MODEL: TBC
HOT WATER SYSTEM SPECIFICATION
MANUFACTURER: TBC
MODEL: TBC
SIZE:
Shr
Roof water
- = ee “| VO<NO |
pp DCV |
v Vv |
NO NO
v |
we NC |
Cd NRV s(t —
OQ 2] | Harvesting |
HC/IRRIGATION SI} | Zone
@ 3 |
¥ Vv Vv
mark "RAIN WATER” NRV GV [sludge zone |
Stormwater RPB
System
LEGEND
1 SOLENOID SWITCHOVER DEVICE
2 |RAIN HEAD IF APPLICABLE
3 HARVESTING TANK
4 REMOTE WATER LEVEL INDICATOR
5 |PRESSURE LIMITING VALVE, 500 kPA MAX.
6 WATER METER
7 | TEMPERING VALVE MAX 50°C
8 FILTRATION DEVICE
9 RAINWATER PUMP
NO |NORMALLY OPEN
NC |NORMALLY CLOSED
Vv BALL VALVE
GV | GATE VALVE
NRV|NON-RETURN VALVE
DCV| DOUBLE CHECK VALVE
RAINWATER HARVESTING SCHEMATIC
AND WATER SUPPLY SPECIFICATIONS
800
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
500
15
3/2
from carpark
to raingarden
A raingarden is a garden bed which
uses native plants and free drainage
soils to treat the pollutants formed in
stormwater that runs off the driveway
and carpark. Raingardens help to
protect our waterways.
50
to
creek
or?
RECEIVING WATERWAYS
E
UCATIONAL SIGNAGE
LAYOUT
15
[Amd Description Date
Issue Notes Date
For Development Approval
For Building Approval x l04—11-13
For Tender
For Construction
As Constructed
E Hydraulic
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333
FX: (07) 5491 4233
contact: Reinhold Koenning MiEAust RPEQ No 7023
NOOSAVILLE
INDUSTRIAL DEVELOPMENT
CLIENT :
MARKRIS FOODS
ARCHITECT :
L SOUL SPACE J
(Prosect: 42 HOFFMAN DRIVE Y
DRAWING TITLE:
OPERATIONAL WORKS
STORMWATER
QUALITY AND
MAINTENANCE
Design] RH. checked] hb [pate |04—11—13 | Dwg. No. AMD.
\. scale : N/A on ar uno.| 4 of 6 | 2790-4 J
RPD:— LOT 3 / FMR LOT 2 SP 222982
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
7. Hydraulic Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.