7. Hydraulic Plans · MCU13/0098

Attached to the e-mail Operational Works Application to MCU13 0098 42 Hofmann Drive Noosaville.

of 6

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

Oo

7.

8.

SEDIMENT & EROSION CONTROL NOTES

 

Erosion and sediment control devices shall be installed and maintained in 9. The underground drainage system shall be used to convey runoff throughout
accordance with these drawings unless an alternative proposal is approved in construction. All drainage pits shall be constructed prior to placement of
writing by the superintendent. Additional erosion and sediment controls shall sub-base material and shall contain a suitable cut-out to capture run-off from
also be installed as necessary during construction. base of boxing during construction.

All erosion and sedimentation control devices shall be installed prior to 10. The underground drainage system including all pits, pipes and GPT shall be
stripping topsoil or commencing earthworks anywhere else on site unless cleaned of sediment prior to on maintenance. Unless otherwise approved by
otherwise approved by the superintendent. An inspection hold point is the Superintendent all temporary erosion and sediment control measures
required at this point prior to the works proceeding. shall be removed at the completion of construction.

Where erosion and sediment control devices cannot be installed due to 11. However such removal shall not proceed until the site is stabilised to the
earthworks or other work operations, they shall be installed at the earliest Superintendent's satisfaction.

possible date. 12. All construction vehicles shall be cleaned of mud and/or loose dirt prior to
Permanent coverage of disturbed areas with topsoil and turf, hydromulch or leaving the site.

mulch (and jute matting if required) is to be undertaken at the earliest 13. No release, or flow is permitted from the site, throughout the earthworks and

practical time.

Turf shall be laid behind kerb and channel for full verge width.

construction period, to any waterway, or stormwater drain or drainage line
leading to a waterway or area of native vegetation, unless the level of total

In order to prevent erosion from concentrated flow paths, the contractor shall suspended solids does not exceed a concentration of 50 milligrams per litre.

follow the following site protection principles:
- Install turf in permanent open drain;

14 An effective water quality self-monitoring program, including at least one
representative measurement of the total suspended solids quality of any flow

- Install geofabric in temporary open drains where shown on drawing; or release from the site on each day runoff to water occurs, must be

- Install sand bags, rock check dams or mulch bunds at 20m centres in all implemented continuously throughout the life of the works which are the
concentrated flow paths including cut-off drains along kerb and channel, subject of this approval. Where the findings of the required performance

along sediment fences, mulch or earth bunds except where drains are lined self-monitoring program indicate that the 50mg/L TSS compliance limit is being
with turf or geofabric. or is likely to be exceeded, remedial action must be taken without delay to

All disturbed areas shall be covered with 100mm of topsoil prior to turfing, ensure ongoing compliance.

seeding, hydromulching or mulching.
All batters 1 on 4 and steeper shall be tined to a depth of 200mm in

15. Sufficient stockpiles of mulch and/or other similar required erosion and
sediment control materials and stores must be maintained on site at all times

accordance with Main Roads specifications prior to topsoiling and mulching to enable ongoing erosion control, as well as site contingencies e.g. imminent
(75mm thick). Batters steeper than 1 on 2 shall also have heavy duty jute wet weather, to be dealt with, until commencement of on maintenance.
matting installed over the mulch. all other disturbed areas shall be covered

with hydromulch.

LEGEND
Existing storm water

Storm Water Drainage

Agi Drain
Floor Waste
FWG gully
GP1 Gully Pit

—o—_1—_ Sediment Fence

-s_—oe Boundary

C.0.8.

Een
FFL
GP
GMH
IC

IL
K&C
MH
PO
RPB
RPD
RWO
RWH
SL
Sq
SWD
TG(t)
TGC
u/g
u/s

u.n.o.

Diameter

Cleanout to surface
Eccentric Enlarger
Finished floor level

Gully pit

Gully Man Hole
Inspection Chamber
Invert Level

Kerb & Channel
Manhole

Planter outlet

Real Property Boundary
Real Property description
Rain water outlet

Rain water head

Surface Level

Square

Storm water drain
Trench grate transverse bar
Trench grate longitudinal bar
Underground

Under slab

Unless noted otherwise

 

 

 

 

 

 

 

 

TASK ISSUES EROSION & SEDIMENT CONTROL STORMWATER QUALITY
PERFORMANCE MINIMIZE SOIL EROSION SITE DURING AVOID DETRIMENTAL IMPACT ON THE WATER QUALITY AND AQUATIC ENVIRONMENT OF DOWNSTREAM WATER
CONSTRUCTION AND REHABILITATION STAGES BODIES AS A RESULT OF DISCHARGE OF CONTAMINATED STORMWATER RUNOFF FROM CONSTRUCTION WORKS
AND AT ALL TIMES PREVENT THE TRANSPORT AND COMPLY WITH THE ENVIRONMENTAL ACT ON ENVIRONMENTAL PROTECTION POLICY FOR WATER.
OF SEDIMENT FROM THE SITE.
MANAGEMENT e INSTALL THE CONTROL DEVICES AND * COMPLY WITH THE ENVIRONMENTAL PROTECTION ACT AND ENVIRONMENTAL PROTECTION POLICY (WATER)
STRATEGY FOLLOW THE STABILIZATION PROCEDURES e ALL CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING SITE STRIPPING.
DESCRIBED ON PLANS. * CONSTRUCTION MATERIALS AND STOCKPILES STORED ON SITE SHALL BE PLACE IN PREPARED LOCATIONS,
e LIMIT THE EXTENT OF STRIPPING TO THE AND PROTECTED AS SHOWN.
STAGE AREA PRESENTLY UNDER * FUELS AND OILS SHALL BE SAFELY STORED TO AVOID INUNDATION. ANY SPILLAGES WITHIN THESE
CONSTRUCTION. COMPOUNDS SHALL BE IMMEDIATELY ATTENDED TO SO AS TO LIMIT THE POTENTIAL FOR IMPACT
* ALL MUD AND SILT DEPOSITED ON THE OFF-SITE.
ADJACENT ROADWAY SHALL BE REMOVED *« PROVIDE CONTROL MEASURES TO PREVENT SOIL EROSION , SCOURING, SEDIMENT TRANSPORT AND
BY SWEEPING. DEPOSITION. THESE MEASURE ARE IDENTIFIED IN THE SOIL & EROSION CONTROL PLAN BUT MAY BE
¢ PROTECT STORMWATER DRAINAGE INLETS EXTENDED AS REQUIRED AND MAY INCLUDE:
AS SHOWN BELOW UNTIL THE SITE HAS — TEMPORARY RETARDATION BASIN
BEEN STABALIZED. — TEMPORARY SILT FENCE
* WASH FROM EXPOSED AGGREGATE — DIVERSION OF UPSTREAM CATCHMENT AROUND DISTURBED AREAS
CONCRETING SHALL BE WHOLLY e IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES SHALL BE MULCHED
CONTAINED ON SITE. CEMENT RESIDUE OR STABILIZED WITH TURF IF EARTHWORKS ARE EXPECTED TO EXTEND FOR THAT TWO WEEKS.
SHALL BE ALLOWED TO DRY THEN * PERMANENT CONTROL MEASURES WILL BE IN PLACE UPON COMPLETION OF CONSTRUCTION, HOWEVER
REMOVED FROM SITE. MAINTENANCE WILL BE REQUIRED OF SOME TEMPORARY FACILITIES UNTIL FULL SITE REHABILITATION HAS
BEEN ACHIEVED.
MONITORING THE PRINCIPAL CONTRACTOR SHALL AT ALL THE PRINCIPAL CONTRACTOR SHALL ENSURE NO SUSPENDED SOLIDS OR CONTAMINANTS ARE VISIBLE IN
TIMES ENSURE THAT CONTROL DEVICES ARE SURFACE RUNOFF LEAVING THE SITE.
CORRECTLY INSTALLED AND ADEQUATELY
MAINTAINED, IN PARTICULAR PRIOR TO
FORECAST PERIODS OF RAIN OR STORMS.
CORRECTIVE * EMPTY AND REPAIR TRAPS REGULARLY.
ACTIONS e REPAIR OR REPLACE DAMAGED CONTROL e REPAIR OR EXTEND CONTROL DEVICES TO OPERATE ADEQUATELY.
DEVICES. e INSTALL ADDITIONAL SEDIMENTS TRAPS TO RETARD SURFACE RUNOFF ACROSS THE WORKS AREA.
*e PLACE ADDITIONAL CONTROL DEVICES
WHERE EXISTING INSTALLATIONS ARE
INADEQUATE.
REPORTING WEEKLY REPORTS BY THE PRINCIPAL
CONTRACTOR TO THE CONSULTANT DETAILING WEEKLY REPORTS BY THE CONTRACTOR TO THE CONSULTANT OUTLINING THE EFFECTIVENESS OF CONTROL
MAINTENANCE PROGRAM, ADDITIONAL WORKS MEASURES AND DETAILS OF ANY CORRECTIVE ACTIONS TAKEN
AND THE PERFORMANCE OF CONTROL
MEASURES.

 

 

 

SEDIMENT & EROSION MANAGMENT PLAN

 

 

 

 

 

SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN: °

e OBJECTIVE:
To minimise erosion on site and ensure sediment is not washed down to the receiving waterways due to construction e
activities

 

e LEGISLATION:

Prior to the commencment of any construction activities the following measures
shall be incorporated:

Provide education of site personnel

Set up action plans as a precaution in case of disturbances occuring

especially after an unexpected strong rainfall event

Provide regular inspection and maintenance of all structures including the

temporary structures.

 

 

Environment Protection Act 1994
Environmental Protection Water Policy 1997
The Integrated Planning Act 1997

« RESPONSIBILITY:
The responsibility for all measures regarding the sediment and erosion control during construction shall be with the
CONTRACTOR. The contractor shall appoint one staff member, ideally the foreman to be responsible for:

*“the location of drain paths such as swales and trenched, cut off swales, catch drains and perimeter banks. All of
these measures shall ensure the runoff is directed to the sedimentation basin during construction.

“**the waste and wash down of materials and goods in particular concrete and cement shall be separated, set to dry
and disposed of

“installation and maintenance of the sediment control fences all around the perimeter as shown in plan

***control of fences, sandbags and bales as well as the sedimentation basin after each rainfall event

“**control of the entry/exit path and the mini ition of sediment transfer to the street in particular control of concrete

and earthmoving vehicles

‘supervise other members of staff and lead by example

‘ensure enough litter collection devices are provided for the collection of daily litter such as cans, bottles, paper,

butts and also building material cut offs.

‘ensure all stockpiles for both incoming and outgoing goods in particular soils and sands are clearly marked and not

blocking drain paths and kept neat and clean.

‘control the flow path of stormwater at all times during construction and use swales, sandbags, bales and other

measures to ensure the runoff is directed to the sedimentation basin at all times.

 

« ACTIONS:
In case of major rainfall events the following action plan shall be followed and responsibly looked after by the
CONTRACTOR:
CUT—OFF DRAIN ALONG CONTOUR — LONG TERM
*““DON'T WAIT UNITL IT IS TOO LATE! STOCKPILES ONLY (GRADE AT 1

be on site during the rainfall period and monitor the drain paths. Redirect where required.
“check the fences after every rainfall and replace the fences where required. Check and replace all barriers,
bales, sandbags and temporary swales, cut off drains and trenches where required.
clean out sedimentation material as soon as the moisture content allows it.
check the receiving pit and improve the barriers if required.
"REMEMBER: EACH RAINFALL IS THE EVENT TO ACTIVELY WATCH AND CONTROL THE RUNOFF!

 

 

 

 

 

IN 100 max. TO FREE

OUTLET.) STABILIZE ALL EARTHWORKS AREAS WITH TURF.

 

 

 

 

FOR ASSESSMENT, TENDERING AND CONSTRUCTION.

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[Amd Description Date
NOTES FOR STOCKPILING:
PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL PROVIDE A
PLAN FOR STOCKPILING, MATERIALS STORAGE AND WASTE
MANAGEMENT. THIS PLAN MAY BE A HAND DRAWN SKETCH BUT
SHALL BE VISIBLEY PLACED IN THE SITE OFFICE.
ADVICE:
. LOCATE STOCK PILES ON LEVEL GROUND AWAY
FROM AREAS SUBJECT TO CONCENTRATED
OVERLAND FLOW.
. CONSTRUCT A PERMENENT BANK OR CATCH DRAIN Issue Notes Date
ABOVE STOCK PILE TO PROTECT IT FROM UPHILL For Development Approval
RUNOFF. “ai —11-
. CONSTRUCT A SEDIMENT FENCE BELOW THE For Building Approval x par ti=15
STOCKPILE TO TRAP SEDIMENTS BEING WASHED For Tender
OFF THE PILE. ;
. PROVIDE ACCESS TO STOCKPILE FROM SIDE SO AS For Construction
TO AVOID RUNOFF PASSING THROUGH. As Constructed
PLASTIC SHEET WHEN RAIN OR
HIGH WINDS ARE EXPECTED.
Hydraulic
A | contact: Reinhold Koenning MigAust RPEQ No 7023
| PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
SEDIMENT FENCE AS SPECIFIED ALONG CONTUR PH: (07) 5491 4333 FX: (07) 5491 4233
(EXTEND 3m min. EACH SIDE OF STOCKPILE. CLIENT :
MARKRIS FOODS
STOCKPILES
ARCHITECT :
1. PLACE STOCKPILES 5m min. UPSTREAM OF EXISTING VEGETATION,
CONCENTRATED WATER FLOW, ROADS, AND HAZARD AREAS. \ SOUL SPACE J
2. CONSTRUCT ALONG THE CONTOUR AS LOW, FLAT, ELONGATED fo , \\
PROJECT:
MOUNDS (2m max. HEIGHT.) c taoseviteN DRIVE
INDUSTRIAL DEVELOPMENT
DRAWING TITLE:
OPERATIONAL WORKS
ESC NOTES
Design RH, Checked] Ch | Date 04-11-13 | Dwg, No. AMD,
(SCALE | N/A ON At UN.o.| 6 of 6 2790-6 J
RPD:— LOT 3 / FMR LOT 2 SP 222982

 

 

 

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

7. Hydraulic Plans.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.