Council archive · source document
7. Hydraulic Plans · MCU13/0098
Attached to the e-mail Operational Works Application to MCU13 0098 42 Hofmann Drive Noosaville.
Plans and drawings: the text below has words only, no drawings.
Oo 7. 8. SEDIMENT & EROSION CONTROL NOTES Erosion and sediment control devices shall be installed and maintained in 9. The underground drainage system shall be used to convey runoff throughout accordance with these drawings unless an alternative proposal is approved in construction. All drainage pits shall be constructed prior to placement of writing by the superintendent. Additional erosion and sediment controls shall sub-base material and shall contain a suitable cut-out to capture run-off from also be installed as necessary during construction. base of boxing during construction. All erosion and sedimentation control devices shall be installed prior to 10. The underground drainage system including all pits, pipes and GPT shall be stripping topsoil or commencing earthworks anywhere else on site unless cleaned of sediment prior to on maintenance. Unless otherwise approved by otherwise approved by the superintendent. An inspection hold point is the Superintendent all temporary erosion and sediment control measures required at this point prior to the works proceeding. shall be removed at the completion of construction. Where erosion and sediment control devices cannot be installed due to 11. However such removal shall not proceed until the site is stabilised to the earthworks or other work operations, they shall be installed at the earliest Superintendent's satisfaction. possible date. 12. All construction vehicles shall be cleaned of mud and/or loose dirt prior to Permanent coverage of disturbed areas with topsoil and turf, hydromulch or leaving the site. mulch (and jute matting if required) is to be undertaken at the earliest 13. No release, or flow is permitted from the site, throughout the earthworks and practical time. Turf shall be laid behind kerb and channel for full verge width. construction period, to any waterway, or stormwater drain or drainage line leading to a waterway or area of native vegetation, unless the level of total In order to prevent erosion from concentrated flow paths, the contractor shall suspended solids does not exceed a concentration of 50 milligrams per litre. follow the following site protection principles: - Install turf in permanent open drain; 14 An effective water quality self-monitoring program, including at least one representative measurement of the total suspended solids quality of any flow - Install geofabric in temporary open drains where shown on drawing; or release from the site on each day runoff to water occurs, must be - Install sand bags, rock check dams or mulch bunds at 20m centres in all implemented continuously throughout the life of the works which are the concentrated flow paths including cut-off drains along kerb and channel, subject of this approval. Where the findings of the required performance along sediment fences, mulch or earth bunds except where drains are lined self-monitoring program indicate that the 50mg/L TSS compliance limit is being with turf or geofabric. or is likely to be exceeded, remedial action must be taken without delay to All disturbed areas shall be covered with 100mm of topsoil prior to turfing, ensure ongoing compliance. seeding, hydromulching or mulching. All batters 1 on 4 and steeper shall be tined to a depth of 200mm in 15. Sufficient stockpiles of mulch and/or other similar required erosion and sediment control materials and stores must be maintained on site at all times accordance with Main Roads specifications prior to topsoiling and mulching to enable ongoing erosion control, as well as site contingencies e.g. imminent (75mm thick). Batters steeper than 1 on 2 shall also have heavy duty jute wet weather, to be dealt with, until commencement of on maintenance. matting installed over the mulch. all other disturbed areas shall be covered with hydromulch. LEGEND Existing storm water Storm Water Drainage Agi Drain Floor Waste FWG gully GP1 Gully Pit —o—_1—_ Sediment Fence -s_—oe Boundary C.0.8. Een FFL GP GMH IC IL K&C MH PO RPB RPD RWO RWH SL Sq SWD TG(t) TGC u/g u/s u.n.o. Diameter Cleanout to surface Eccentric Enlarger Finished floor level Gully pit Gully Man Hole Inspection Chamber Invert Level Kerb & Channel Manhole Planter outlet Real Property Boundary Real Property description Rain water outlet Rain water head Surface Level Square Storm water drain Trench grate transverse bar Trench grate longitudinal bar Underground Under slab Unless noted otherwise TASK ISSUES EROSION & SEDIMENT CONTROL STORMWATER QUALITY PERFORMANCE MINIMIZE SOIL EROSION SITE DURING AVOID DETRIMENTAL IMPACT ON THE WATER QUALITY AND AQUATIC ENVIRONMENT OF DOWNSTREAM WATER CONSTRUCTION AND REHABILITATION STAGES BODIES AS A RESULT OF DISCHARGE OF CONTAMINATED STORMWATER RUNOFF FROM CONSTRUCTION WORKS AND AT ALL TIMES PREVENT THE TRANSPORT AND COMPLY WITH THE ENVIRONMENTAL ACT ON ENVIRONMENTAL PROTECTION POLICY FOR WATER. OF SEDIMENT FROM THE SITE. MANAGEMENT e INSTALL THE CONTROL DEVICES AND * COMPLY WITH THE ENVIRONMENTAL PROTECTION ACT AND ENVIRONMENTAL PROTECTION POLICY (WATER) STRATEGY FOLLOW THE STABILIZATION PROCEDURES e ALL CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING SITE STRIPPING. DESCRIBED ON PLANS. * CONSTRUCTION MATERIALS AND STOCKPILES STORED ON SITE SHALL BE PLACE IN PREPARED LOCATIONS, e LIMIT THE EXTENT OF STRIPPING TO THE AND PROTECTED AS SHOWN. STAGE AREA PRESENTLY UNDER * FUELS AND OILS SHALL BE SAFELY STORED TO AVOID INUNDATION. ANY SPILLAGES WITHIN THESE CONSTRUCTION. COMPOUNDS SHALL BE IMMEDIATELY ATTENDED TO SO AS TO LIMIT THE POTENTIAL FOR IMPACT * ALL MUD AND SILT DEPOSITED ON THE OFF-SITE. ADJACENT ROADWAY SHALL BE REMOVED *« PROVIDE CONTROL MEASURES TO PREVENT SOIL EROSION , SCOURING, SEDIMENT TRANSPORT AND BY SWEEPING. DEPOSITION. THESE MEASURE ARE IDENTIFIED IN THE SOIL & EROSION CONTROL PLAN BUT MAY BE ¢ PROTECT STORMWATER DRAINAGE INLETS EXTENDED AS REQUIRED AND MAY INCLUDE: AS SHOWN BELOW UNTIL THE SITE HAS — TEMPORARY RETARDATION BASIN BEEN STABALIZED. — TEMPORARY SILT FENCE * WASH FROM EXPOSED AGGREGATE — DIVERSION OF UPSTREAM CATCHMENT AROUND DISTURBED AREAS CONCRETING SHALL BE WHOLLY e IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES SHALL BE MULCHED CONTAINED ON SITE. CEMENT RESIDUE OR STABILIZED WITH TURF IF EARTHWORKS ARE EXPECTED TO EXTEND FOR THAT TWO WEEKS. SHALL BE ALLOWED TO DRY THEN * PERMANENT CONTROL MEASURES WILL BE IN PLACE UPON COMPLETION OF CONSTRUCTION, HOWEVER REMOVED FROM SITE. MAINTENANCE WILL BE REQUIRED OF SOME TEMPORARY FACILITIES UNTIL FULL SITE REHABILITATION HAS BEEN ACHIEVED. MONITORING THE PRINCIPAL CONTRACTOR SHALL AT ALL THE PRINCIPAL CONTRACTOR SHALL ENSURE NO SUSPENDED SOLIDS OR CONTAMINANTS ARE VISIBLE IN TIMES ENSURE THAT CONTROL DEVICES ARE SURFACE RUNOFF LEAVING THE SITE. CORRECTLY INSTALLED AND ADEQUATELY MAINTAINED, IN PARTICULAR PRIOR TO FORECAST PERIODS OF RAIN OR STORMS. CORRECTIVE * EMPTY AND REPAIR TRAPS REGULARLY. ACTIONS e REPAIR OR REPLACE DAMAGED CONTROL e REPAIR OR EXTEND CONTROL DEVICES TO OPERATE ADEQUATELY. DEVICES. e INSTALL ADDITIONAL SEDIMENTS TRAPS TO RETARD SURFACE RUNOFF ACROSS THE WORKS AREA. *e PLACE ADDITIONAL CONTROL DEVICES WHERE EXISTING INSTALLATIONS ARE INADEQUATE. REPORTING WEEKLY REPORTS BY THE PRINCIPAL CONTRACTOR TO THE CONSULTANT DETAILING WEEKLY REPORTS BY THE CONTRACTOR TO THE CONSULTANT OUTLINING THE EFFECTIVENESS OF CONTROL MAINTENANCE PROGRAM, ADDITIONAL WORKS MEASURES AND DETAILS OF ANY CORRECTIVE ACTIONS TAKEN AND THE PERFORMANCE OF CONTROL MEASURES. SEDIMENT & EROSION MANAGMENT PLAN SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN: ° e OBJECTIVE: To minimise erosion on site and ensure sediment is not washed down to the receiving waterways due to construction e activities e LEGISLATION: Prior to the commencment of any construction activities the following measures shall be incorporated: Provide education of site personnel Set up action plans as a precaution in case of disturbances occuring especially after an unexpected strong rainfall event Provide regular inspection and maintenance of all structures including the temporary structures. Environment Protection Act 1994 Environmental Protection Water Policy 1997 The Integrated Planning Act 1997 « RESPONSIBILITY: The responsibility for all measures regarding the sediment and erosion control during construction shall be with the CONTRACTOR. The contractor shall appoint one staff member, ideally the foreman to be responsible for: *“the location of drain paths such as swales and trenched, cut off swales, catch drains and perimeter banks. All of these measures shall ensure the runoff is directed to the sedimentation basin during construction. “**the waste and wash down of materials and goods in particular concrete and cement shall be separated, set to dry and disposed of “installation and maintenance of the sediment control fences all around the perimeter as shown in plan ***control of fences, sandbags and bales as well as the sedimentation basin after each rainfall event “**control of the entry/exit path and the mini ition of sediment transfer to the street in particular control of concrete and earthmoving vehicles ‘supervise other members of staff and lead by example ‘ensure enough litter collection devices are provided for the collection of daily litter such as cans, bottles, paper, butts and also building material cut offs. ‘ensure all stockpiles for both incoming and outgoing goods in particular soils and sands are clearly marked and not blocking drain paths and kept neat and clean. ‘control the flow path of stormwater at all times during construction and use swales, sandbags, bales and other measures to ensure the runoff is directed to the sedimentation basin at all times. « ACTIONS: In case of major rainfall events the following action plan shall be followed and responsibly looked after by the CONTRACTOR: CUT—OFF DRAIN ALONG CONTOUR — LONG TERM *““DON'T WAIT UNITL IT IS TOO LATE! STOCKPILES ONLY (GRADE AT 1 be on site during the rainfall period and monitor the drain paths. Redirect where required. “check the fences after every rainfall and replace the fences where required. Check and replace all barriers, bales, sandbags and temporary swales, cut off drains and trenches where required. clean out sedimentation material as soon as the moisture content allows it. check the receiving pit and improve the barriers if required. "REMEMBER: EACH RAINFALL IS THE EVENT TO ACTIVELY WATCH AND CONTROL THE RUNOFF! IN 100 max. TO FREE OUTLET.) STABILIZE ALL EARTHWORKS AREAS WITH TURF. FOR ASSESSMENT, TENDERING AND CONSTRUCTION. DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED [Amd Description Date NOTES FOR STOCKPILING: PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL PROVIDE A PLAN FOR STOCKPILING, MATERIALS STORAGE AND WASTE MANAGEMENT. THIS PLAN MAY BE A HAND DRAWN SKETCH BUT SHALL BE VISIBLEY PLACED IN THE SITE OFFICE. ADVICE: . LOCATE STOCK PILES ON LEVEL GROUND AWAY FROM AREAS SUBJECT TO CONCENTRATED OVERLAND FLOW. . CONSTRUCT A PERMENENT BANK OR CATCH DRAIN Issue Notes Date ABOVE STOCK PILE TO PROTECT IT FROM UPHILL For Development Approval RUNOFF. “ai —11- . CONSTRUCT A SEDIMENT FENCE BELOW THE For Building Approval x par ti=15 STOCKPILE TO TRAP SEDIMENTS BEING WASHED For Tender OFF THE PILE. ; . PROVIDE ACCESS TO STOCKPILE FROM SIDE SO AS For Construction TO AVOID RUNOFF PASSING THROUGH. As Constructed PLASTIC SHEET WHEN RAIN OR HIGH WINDS ARE EXPECTED. Hydraulic A | contact: Reinhold Koenning MigAust RPEQ No 7023 | PO Box 181 Moffat Beach, QLD, 4551 email: [email protected] SEDIMENT FENCE AS SPECIFIED ALONG CONTUR PH: (07) 5491 4333 FX: (07) 5491 4233 (EXTEND 3m min. EACH SIDE OF STOCKPILE. CLIENT : MARKRIS FOODS STOCKPILES ARCHITECT : 1. PLACE STOCKPILES 5m min. UPSTREAM OF EXISTING VEGETATION, CONCENTRATED WATER FLOW, ROADS, AND HAZARD AREAS. \ SOUL SPACE J 2. CONSTRUCT ALONG THE CONTOUR AS LOW, FLAT, ELONGATED fo , \\ PROJECT: MOUNDS (2m max. HEIGHT.) c taoseviteN DRIVE INDUSTRIAL DEVELOPMENT DRAWING TITLE: OPERATIONAL WORKS ESC NOTES Design RH, Checked] Ch | Date 04-11-13 | Dwg, No. AMD, (SCALE | N/A ON At UN.o.| 6 of 6 2790-6 J RPD:— LOT 3 / FMR LOT 2 SP 222982
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
7. Hydraulic Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.