Operational Works Delegated Report OPW25 0054 · OPW25/0054

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

10.

11.

12.

13.

Submission of Amended Plans Required

The conditions of this Decision Notice require resubmission of plans to Council with
amendments. Please address the amended plan/s to Council's Development Assessment
Branch with the Reference No. DBBW25/0051, OPW25/0054, RAP25/0026. To avoid delays
and assessment issues with the Operational Works application, it is recommended the plan/s
be resubmitted prior to lodgement of any Operational Works application. However, should
the plans not be submitted, the applicant is advised that a Preliminary Approval may be
issued in lieu of a Development Permit.

Building and Construction Industry (Portable Long Service Leave) Levy

The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.

Private Infrastructure

All private infrastructure for the development must be designed to meet the planning scheme
requirements unless otherwise agreed by the relevant authority

Road Reserve Permit

This development permit provides the applicant with written authority to undertake the
development in accordance with the conditions. Any additional activities that are undertaken
inside Council’s road reserve for the purpose of acting on this development permit may
require a Road Reserve Permit. These additional activities may include, but are not limited
to, hoarding, pedestrian diversions, laneway closures, etc. To apply for a Road Reserve
Permit, or for more information, Contact Council’s Road Reserve Officer at

[email protected] Act 2014 — Fire Ant Control

Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
individuals and businesses are responsible for ensuring that they follow the movement
controls for specific organic materials to help prevent the spread of fire ants within South
East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
ant biosecurity zone may need a biosecurity instrument permit. More information is available
on https://Awww.fireants.org.au/treat/business-andindustry/movement-controls

General Advisory Notes

As this driveway is a private structure, the owner bears full responsibly for the standard of its
construction, maintenance and any liabilities associated with its construction. It is
recommended that professional advice be sought for the construction of the driveway to
ensure that the driveway is constructed in accordance with standard drawings RS-049, RS-
050 and RS-056 (a copy is attached).

Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.

Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.

Prestart, On and Off Maintenance Inspections Request

Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
business days notice of preferred inspection time.

If Council officers are required to undertake additional inspections of the same works, a
reinspection fee will be applicable in accordance with Council’s Fees and Charges register
applicable at the time.

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Delegated Report OPW25 0054.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.