               APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT APPROVAL
               Author                  Senior Development Engineer, Daniel Epps
                                       Development Assessment



                    APPLICATION DETAILS

                    Application No.                  OPW24/0125.01

                    Development Approval             Operational Works - Drainage Works, Earthworks, Roadworks,
                                                     Stormwater, Clearing Vegetation under planning scheme

                    Applicant                        Woolloms Constructions

                    Request Received On              29 April 2025

                    Report Reviewed By               Mark Lewis – 29 July 2025

                    Decision Due Date                28 May 2025


                    PROPERTY DETAILS

                    Property Address                 100 Cooyar St Noosa Heads Qld 4567

                    RP Description                   Lot 9 RP 225312

                    Land Area                        25000.000 m²

                    Existing Use of Land             Commercial (Aged Care)


                    STATUTORY DETAILS

                    SEQRP Designation                Urban Footprint

                    Zone                             Community Facilities (3 – Residential Care Facility)

                    Precinct                         Not applicable

                    Local Area Plan                  Noosa Heads

                    Overlays                         Acid Sulfate Soils, Biodiversity, Waterways and Wetlands,
                                                     Bushfire Hazard, Landslide Hazard and Koala Habitat Area

                    Assessment Type                  Minor Change to Development Approval



               1.      PROPOSAL
               The applicant seeks approval for a change to an existing development approval for Operational
               Works - Drainage Works, Earthworks, Roadworks, Stormwater, Clearing Vegetation under
               planning scheme.


                                                                                                        Page 1 of 11

Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025
Full text of the other 10 pages

Page 2

               The proposed change application is required due to construction constraints encountered during
               works. The change could not be accepted as a ‘construction change’ due to the extent and nature
               of the change.
               The locality and proposal plan are included below.




                                                       Figure 1 – Locality




                                                      Figure 2 – Site Plan

                                                                                                 Page 2 of 11

Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025

Page 3

               2.     BACKGROUND
               A development approval for Operational Works - Drainage Works, Earthworks, Roadworks,
               Stormwater, Clearing Vegetation under planning scheme was approved on 10 January 2025.
               3.     ASSESSMENT
               The purpose of the change is to address a number of design changes brought about by constraints
               encountered during construction.
               The principal contractor informed Council that the quality of the material in the works area was not
               suitable to satisfy the requirements of the higher order approval, particularly the pavement design
               and ‘turf finish’. The material was observed as being permanently saturated and inaccessible by
               foot and machine. It appears that the works area is located at the top of the natural subsurface
               water table which causes the ‘extent of saturation’ and ‘area of inaccessibility’ to fluctuate
               during/after inclement weather – critically this area does not ‘reduce’ or ‘improve’ during periods of
               dry weather.
               Accordingly, to satisfy the requirements of the higher order and to achieve all other design
               requirements, the following design changes were proposed:
               •    a revised pavement design incorporating a cellular geocell rock mattress to improve the
                    subgrade strength and ensure subsurface flows were not obstructed;
               •    a reduction of the turfed areas adjacent to the Giraween boundary, substituted with d50
                    200mm rock armouring with a geofabric wrap;
               •    the addition of 3 x rock swales to provide drainage relief to the fire access trail;
               •    a further reduction of the turfed area adjacent to the Giraween boundary, substituted with a
                    6m wide coir blanket planted with Lomandras;
               •    a sleeper retaining wall and fall prevention fence on the OzCare side of proposed crossing
                    1.
               The design alterations generally satisfies:
               •    the bushfire risk requirements as confirmed by the supervising bushfire consultant;
               •    the requirements imposed by the Infrastructure Agreement and higher order approval; and
               •    the requirements of the future asset owner – Council’s Natural Areas Coordinator.
               Engineering believes the works are necessary to ensure all the interests of all relevant parties are
               met (including conditions and the Infrastructure Agreement).
               3.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:
               •      State Planning Policy;
               •      South East Queensland Regional Plan;
               •      Planning Regulation 2017; and
               •      Noosa Plan 2020 (25 September 2020).
               3.2. Statutory Process
               The applicant has requested to make a minor change to a development approval under s78 of the
               Planning Act 2016. An application for a minor change to a development approval can only be made
               in circumstances where a change would constitute a ‘minor change’.
               The proposed change to the development approval requested by the applicant is determined to
               constitute a minor change on the grounds that:
               •      the development would not result in substantially different development
               •      the change does not include prohibited development;


                                                                                                       Page 3 of 11

Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025

Page 4

               •      the change would not require the application to be referred to an additional referral agency
                      or cause a referral agency to have regard to new matters prescribed by regulation;
               •      where the original application was code assessable, the change would not cause the
                      application to become impact assessable.
               3.3. Statutory Instruments – Planning Scheme
               The original application was lodged and assessed under the Noosa Plan 2020 (25 September
               2020) which remains in effect at the time of assessment of this minor change. Pursuant to s81 of
               the Planning Act 2017, Council must consider the planning scheme in effect when the original
               development application was lodged, however Council may give weight to Noosa Plan 2020 as the
               planning scheme in effect at the time of the minor change application being lodged.
               The following codes from Noosa Plan 2020 are applicable to this development:
               •      Works Codes – Driveways and Parking, Water Quality and Drainage, Earthworks,
                      Landscaping,
               •      Overlay Code – Acid Sulfate Soils, Bushfire Hazard
               Existing Condition 1
               APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.      Rev.   Plan/Document Name                           Date

                         C101          D      Project Notes – Sheet 1                      15 August 2024
                                              Prepared by STP Consultants

                         C102          D      Project Notes – Sheet 2                      15 August 2024
                                              Prepared by STP Consultants

                         C103          E      Demolition Plan & Tree Removal Plan          15 August 2024
                                              Prepared by STP Consultants

                         C104          G      General Arrangement Plan                     5 November 2024
                                              Prepared by STP Consultants

                         C105          B      Site Sections – Sheet 1                      15 August 2024
                                              Prepared by STP Consultants

                         C106          C      Site Sections – Sheet 2                      5 August 2024
                                              Prepared by STP Consultants

                         C201          E      Earthworks Stripping Plan                    15 August 2024
                                              Prepared by STP Consultants

                         C202          F      Earthworks Management Plan                   5 November 2024
                                              Prepared by STP Consultants

                         C301          F      Finished Levels Plan – Sheet 1               5 November 2024
                                              Prepared by STP Consultants

                                                                                                    Page 4 of 11

Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025

Page 5

                         C302          C   Concrete Jointing Plan                      22 July 2024
                                           Prepared by STP Consultants

                         C303          B   Access Track Setout Plan                    4 July 2024
                                           Prepared by STP Consultants

                         C304          B   Access Track Longitudinal Section           4 July 2024
                                           Prepared by STP Consultants

                         C305          B   Access Track Cross Sections – Sheet 1       4 July 2024
                                           Prepared by STP Consultants

                         C306          B   Access Track Cross Sections – Sheet 2       4 July 2024
                                           Prepared by STP Consultants

                         C308          B   Proposed Passing Lane & End of Fire Track 22 July 2024
                                           Layout Plan
                                           Prepared by STP Consultants

                         C309          B   Finished Levels Plan – Sheet 2              15 August 2024
                                           Prepared by STP Consultants

                         C310          B   Finished Levels Plan – Sheet 3              15 August 2024
                                           Prepared by STP Consultants

                         C311          B   Finished Levels Plan – Sheet 4              15 August 2024
                                           Prepared by STP Consultants

                         C312          B   Finished Levels Plan – Sheet 5              15 August 2024
                                           Prepared by STP Consultants

                         C313          B   Finished Levels Plan – Sheet 6              15 August 2024
                                           Prepared by STP Consultants

                         C315          C   Finished Levels Plan – Sheet 8              5 November 2024
                                           Prepared by STP Consultants

                         C401          C   Stormwater Management Plan                  29 October 2024
                                           Prepared by STP Consultants

                         C403          A   Absorption Trenches Layout & Details Plan   29 October 2024
                                           Prepared by STP Consultants

                      The following plans require amendment.

                         Plan No.          Rev.   Plan/Document Name                         Date

                         C307              B      Proposed Crossings Layout & Details Plan   4 July 2024
                                                  Prepared by STP Consultants

                                                                                               Page 5 of 11

Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025

Page 6

                         Amendments           The minimum depth of the proposed rock armor scour protection is
                                              not satisfactory.
                                              Provide an amended Proposed Crossings Layout & Details Plan
                                              prior to the prestart meeting that includes:
                                                    a.    200mm d50 rock armor scour protection to a minimum
                                                          depth of 300mm.

                         C314                 B      Finished Levels Plan – Sheet 7                  15     August
                                                                                                     2024
                                                     Prepared by STP Consultants

                         C402                 B      Stormwater Longitudinal Sections                15     August
                                                                                                     2024
                                                     Prepared by STP Consultants

                         Amendments           During the 1% AEP event, stormwater overflow from Catchment 2/A
                                              will be controlled, collected and discharged within the subject site
                                              towards the fire access trail via Outlet 1/A.
                                              The design proposes to concentrate flow without returning flow back
                                              to the natural flow regime, creating the potential risk of scour about
                                              the outlet and to downstream properties (fire access trail, Giraween).
                                              Provide an amended Finished Levels Plan – Sheet 7 and Stormwater
                                              Longitudinal Sections prior to the prestart meeting that includes:
                                                    a.    an amended outlet (1/A) that returns the concentrated
                                                          flow back to the natural flow regime (i.e., sheet flow).
                                                          Council considers an acceptable solution to include a
                                                          rock energy dissipator.

               Applicant’s Request
               The applicant has requested the list of Approved Plans be amended to reflect the latest drawing
               revision.
               Assessment of Request
               The request is considered necessary to ensure that the Approved Plans reflect the works on site.
               Although not specifically requested by the applicant, the plans requiring amendment should be
               deleted to avoid confusion.
               Recommendation
               It is recommended existing Condition 1 be amended to read as follows:
               APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.      Rev.   Plan/Document Name                              Date

                         C101          1      Project Notes – Sheet 1                         22 January 2025
                                              Prepared by STP Consultants

                         C102          1      Project Notes – Sheet 2                         22 January 2025
                                              Prepared by STP Consultants


                                                                                                       Page 6 of 11

Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025

Page 7

                         C103          1   Demolition Plan & Tree Removal Plan        22 January 2025
                                           Prepared by STP Consultants

                         C104          1   General Arrangement Plan                   22 January 2025
                                           Prepared by STP Consultants

                         C105          1   Site Sections – Sheet 1                    22 January 2025
                                           Prepared by STP Consultants

                         C106          1   Site Sections – Sheet 2                    22 January 2025
                                           Prepared by STP Consultants

                         C201          1   Earthworks Stripping Plan                  22 January 2025
                                           Prepared by STP Consultants

                         C202          1   Earthworks Management Plan                 22 January 2025
                                           Prepared by STP Consultants

                         C301          1   Finished Levels Plan – Sheet 1             22 January 2025
                                           Prepared by STP Consultants

                         C302          1   Concrete Jointing Plan                     22 January 2025
                                           Prepared by STP Consultants

                         C303          5   Access Track Setout Plan                   16 July 2025
                                           Prepared by STP Consultants

                         C304          1   Access Track Longitudinal Section          22 January 2025
                                           Prepared by STP Consultants

                         C305          1   Access Track Cross Sections – Sheet 1      22 January 2025
                                           Prepared by STP Consultants

                         C306          1   Access Track Cross Sections – Sheet 2      22 January 2025
                                           Prepared by STP Consultants

                         C307          5   Proposed Crossings Layout and Details Plan 16 July 2025
                                           Prepared by STP Consultants

                         C308          5   Proposed Passing Lane & End of Fire Track 16 July 2025
                                           Layout Plan
                                           Prepared by STP Consultants

                         C309          1   Finished Levels Plan – Sheet 2             22 January 2025
                                           Prepared by STP Consultants

                         C310          1   Finished Levels Plan – Sheet 3             22 January 2025
                                           Prepared by STP Consultants


                                                                                              Page 7 of 11

Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025

Page 8

                         C311          1   Finished Levels Plan – Sheet 4               22 January 2025
                                           Prepared by STP Consultants

                         C312          1   Finished Levels Plan – Sheet 5               22 January 2025
                                           Prepared by STP Consultants

                         C313          1   Finished Levels Plan – Sheet 6               22 January 2025
                                           Prepared by STP Consultants

                         C314          1   Finished Levels Plan – Sheet 7               22 January 2025
                                           Prepared by STP Consultants

                         C315          1   Finished Levels Plan – Sheet 8               22 January 2025
                                           Prepared by STP Consultants

                         C401          1   Stormwater Management Plan                   22 January 2025
                                           Prepared by STP Consultants

                         C402          1   Stormwater Longitudinal Sections             22 January 2025
                                           Prepared by STP Consultants

                         C403          1   Absorption Trenches Layout & Details Plan    22 January 2025
                                           Prepared by STP Consultants

                         C702          2   Miscellaneous Details Sheet 2                11 July 2025
                                           Prepared by STP Consultants

                         C703          2   Miscellaneous Details Sheet 3                11 July 2025
                                           Prepared by STP Consultants

                      The following plans require amendment.

                         Plan No.          Rev.    Plan/Document Name                         Date

                         C307              B       Proposed Crossings Layout & Details Plan   4 July 2024
                                                   Prepared by STP Consultants

                         Amendments        The minimum depth of the proposed rock armor scour protection is
                                           not satisfactory.
                                           Provide an amended Proposed Crossings Layout & Details Plan
                                           prior to the prestart meeting that includes:
                                                  b.   200mm d50 rock armor scour protection to a minimum
                                                       depth of 300mm.

                         C314              B       Finished Levels Plan – Sheet 7             15       August
                                                                                              2024
                                                   Prepared by STP Consultants

                         C402              B       Stormwater Longitudinal Sections           15       August
                                                                                              2024
                                                   Prepared by STP Consultants

                                                                                                Page 8 of 11

Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025

Page 9

                         Amendments         During the 1% AEP event, stormwater overflow from Catchment 2/A
                                            will be controlled, collected and discharged within the subject site
                                            towards the fire access trail via Outlet 1/A.
                                            The design proposes to concentrate flow without returning flow back
                                            to the natural flow regime, creating the potential risk of scour about
                                            the outlet and to downstream properties (fire access trail, Giraween).
                                            Provide an amended Finished Levels Plan – Sheet 7 and Stormwater
                                            Longitudinal Sections prior to the prestart meeting that includes:
                                                  c.    an amended outlet (1/A) that returns the concentrated
                                                        flow back to the natural flow regime (i.e., sheet flow).
                                                        Council considers an acceptable solution to include a
                                                        rock energy dissipator.


               Existing Condition 7
               7.     Submit amended plans to Council as described in the List of plans requiring amendments.
                      The plans must be submitted and approved prior to the pre-start meeting and be issued “FOR
                      CONSTRUCTION”.
               Applicant’s Request
               The applicant has not requested the removal of Condition 7.
               Assessment of Request
               Engineering suggests Condition 7 is removed as no plan amendments are required as part of this
               change approval.
               Recommendation
               It is recommended existing Condition 7 be deleted.


               4.     CONSULTATION
               4.1. Referral Agencies
               Not applicable
               4.2. Internal Council Referrals
               The application was forwarded to the following internal Council officers for review and/or comment:
               •      Senior Environment Officer – Development Assessment
               •      Environmental Operations Coordinator – Environment & Sustainable Development
               5.     CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 83(9) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No. OPW24/0125.01 to make a minor change to an existing approval
               for Operational Works - Drainage Works, Earthworks, Roadworks, Stormwater, Clearing
               Vegetation under planning scheme situated at 100 Cooyar St Noosa Heads Qld 4567 and
               described as Lot 9 RP 225312, Council on 29 July 2025 decided to:
               A.     Approve the change.

                                                                                                     Page 9 of 11

Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025

Page 10

               B.     Amend conditions 1 and 7 to read as follows:
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.      Rev.   Plan/Document Name                          Date

                         C101          1      Project Notes – Sheet 1                     22 January 2025
                                              Prepared by STP Consultants

                         C102          1      Project Notes – Sheet 2                     22 January 2025
                                              Prepared by STP Consultants

                         C103          1      Demolition Plan & Tree Removal Plan         22 January 2025
                                              Prepared by STP Consultants

                         C104          1      General Arrangement Plan                    22 January 2025
                                              Prepared by STP Consultants

                         C105          1      Site Sections – Sheet 1                     22 January 2025
                                              Prepared by STP Consultants

                         C106          1      Site Sections – Sheet 2                     22 January 2025
                                              Prepared by STP Consultants

                         C201          1      Earthworks Stripping Plan                   22 January 2025
                                              Prepared by STP Consultants

                         C202          1      Earthworks Management Plan                  22 January 2025
                                              Prepared by STP Consultants

                         C301          1      Finished Levels Plan – Sheet 1              22 January 2025
                                              Prepared by STP Consultants

                         C302          1      Concrete Jointing Plan                      22 January 2025
                                              Prepared by STP Consultants

                         C303          5      Access Track Setout Plan                    16 July 2025
                                              Prepared by STP Consultants

                         C304          1      Access Track Longitudinal Section           22 January 2025
                                              Prepared by STP Consultants

                         C305          1      Access Track Cross Sections – Sheet 1       22 January 2025
                                              Prepared by STP Consultants

                         C306          1      Access Track Cross Sections – Sheet 2       22 January 2025
                                              Prepared by STP Consultants



                                                                                                 Page 10 of 11

Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025

Page 11

                         C307          5   Proposed Crossings Layout and Details Plan 16 July 2025
                                           Prepared by STP Consultants

                         C308          5   Proposed Passing Lane & End of Fire Track 16 July 2025
                                           Layout Plan
                                           Prepared by STP Consultants

                         C309          1   Finished Levels Plan – Sheet 2              22 January 2025
                                           Prepared by STP Consultants

                         C310          1   Finished Levels Plan – Sheet 3              22 January 2025
                                           Prepared by STP Consultants

                         C311          1   Finished Levels Plan – Sheet 4              22 January 2025
                                           Prepared by STP Consultants

                         C312          1   Finished Levels Plan – Sheet 5              22 January 2025
                                           Prepared by STP Consultants

                         C313          1   Finished Levels Plan – Sheet 6              22 January 2025
                                           Prepared by STP Consultants

                         C314          1   Finished Levels Plan – Sheet 7              22 January 2025
                                           Prepared by STP Consultants

                         C315          1   Finished Levels Plan – Sheet 8              22 January 2025
                                           Prepared by STP Consultants

                         C401          1   Stormwater Management Plan                  22 January 2025
                                           Prepared by STP Consultants

                         C402          1   Stormwater Longitudinal Sections            22 January 2025
                                           Prepared by STP Consultants

                         C403          1   Absorption Trenches Layout & Details Plan   22 January 2025
                                           Prepared by STP Consultants

                         C702          2   Miscellaneous Details Sheet 2               11 July 2025
                                           Prepared by STP Consultants

                         C703          2   Miscellaneous Details Sheet 3               11 July 2025
                                           Prepared by STP Consultants

               7.     Deleted.




                                                                                             Page 11 of 11

Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Report OPW24 0125 01 (As Published).pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.