Council archive · source document
Minor Change Report OPW24 0125 01 (As Published) · OPW24/0125.01
C302 C Concrete Jointing Plan 22 July 2024
Prepared by STP Consultants
C303 B Access Track Setout Plan 4 July 2024
Prepared by STP Consultants
C304 B Access Track Longitudinal Section 4 July 2024
Prepared by STP Consultants
C305 B Access Track Cross Sections – Sheet 1 4 July 2024
Prepared by STP Consultants
C306 B Access Track Cross Sections – Sheet 2 4 July 2024
Prepared by STP Consultants
C308 B Proposed Passing Lane & End of Fire Track 22 July 2024
Layout Plan
Prepared by STP Consultants
C309 B Finished Levels Plan – Sheet 2 15 August 2024
Prepared by STP Consultants
C310 B Finished Levels Plan – Sheet 3 15 August 2024
Prepared by STP Consultants
C311 B Finished Levels Plan – Sheet 4 15 August 2024
Prepared by STP Consultants
C312 B Finished Levels Plan – Sheet 5 15 August 2024
Prepared by STP Consultants
C313 B Finished Levels Plan – Sheet 6 15 August 2024
Prepared by STP Consultants
C315 C Finished Levels Plan – Sheet 8 5 November 2024
Prepared by STP Consultants
C401 C Stormwater Management Plan 29 October 2024
Prepared by STP Consultants
C403 A Absorption Trenches Layout & Details Plan 29 October 2024
Prepared by STP Consultants
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
C307 B Proposed Crossings Layout & Details Plan 4 July 2024
Prepared by STP Consultants
Page 5 of 11
Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report OPW24 0125 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.