Minor Change Report OPW24 0125 01 (As Published) · OPW24/0125.01
C311 1 Finished Levels Plan – Sheet 4 22 January 2025
Prepared by STP Consultants
C312 1 Finished Levels Plan – Sheet 5 22 January 2025
Prepared by STP Consultants
C313 1 Finished Levels Plan – Sheet 6 22 January 2025
Prepared by STP Consultants
C314 1 Finished Levels Plan – Sheet 7 22 January 2025
Prepared by STP Consultants
C315 1 Finished Levels Plan – Sheet 8 22 January 2025
Prepared by STP Consultants
C401 1 Stormwater Management Plan 22 January 2025
Prepared by STP Consultants
C402 1 Stormwater Longitudinal Sections 22 January 2025
Prepared by STP Consultants
C403 1 Absorption Trenches Layout & Details Plan 22 January 2025
Prepared by STP Consultants
C702 2 Miscellaneous Details Sheet 2 11 July 2025
Prepared by STP Consultants
C703 2 Miscellaneous Details Sheet 3 11 July 2025
Prepared by STP Consultants
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
C307 B Proposed Crossings Layout & Details Plan 4 July 2024
Prepared by STP Consultants
Amendments The minimum depth of the proposed rock armor scour protection is
not satisfactory.
Provide an amended Proposed Crossings Layout & Details Plan
prior to the prestart meeting that includes:
b. 200mm d50 rock armor scour protection to a minimum
depth of 300mm.
C314 B Finished Levels Plan – Sheet 7 15 August
2024
Prepared by STP Consultants
C402 B Stormwater Longitudinal Sections 15 August
2024
Prepared by STP Consultants
Page 8 of 11
Document Set ID: 23935917
Version: 3, Version Date: 29/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report OPW24 0125 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.