Minor Change Report 51983 3225 23 (As Published) · 51983.3225.23
Approved Plans – July 2022 Units 9-10 (Lot 30 SP307674) (51983.3225.14)
Plan No. Plan, prepared by Date
SK 002 Proposed Holyman Unit 3D perspectives, prepared by N/D
Gerard Smith Design
Iss SK2
SK 101 Site Plan, prepared by Gerard Smith Design May 2022
Iss SK2
SK 102 Setback Plan & Vehicle Manoeuvring Plan, prepared by May 2022
Gerard Smith Design
Iss SK2
SK 201 Floor Plan – All Levels, prepared by Gerard Smith Design May 2022
Iss SK2
SK 401 Elevations – Sheet 1, prepared by Gerard Smith Design May 2022
Iss SK2
SK 501 Cross Sections – Sheet 1, prepared by Gerard Smith May 2022
Design
Iss SK2
SK 951 Overviewing Diagrams – Level 1, prepared by Gerard May 2022
Smith Design
Iss SK2
SK 952 Overviewing Diagrams – Level 2, prepared by Gerard May 2022
Smith Design
Iss SK2
Approved Plans – 16 November 2023 (Lot 3 GTP 1154) (51983.3225.16)
Plan No. Plan, prepared by Date
DA012 Rev Proposed Plan – Ground, prepared by GT Group Building 30 June 2023
A Design
DA013 Rev Proposed Plan – Level 1, prepared by GT Group Building 30 June 2023
A Design
DA014 Rev Proposed Plan – Level 2, prepared by GT Group Building 30 June 2023
A Design
DA015 Rev Proposed Plan – Level 3, prepared by GT Group Building 30 June 2023
A Design
As Annotated by Council
Page 13 of 35
Document Set ID: 24108017
Version: 5, Version Date: 11/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report 51983 3225 23 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.