Skip to the record
Every meeting, every word.

Original source · versioned page text

PR22001.IFurtherAdviceResponse.9Feb2023

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

has been retained mid way down the ramp to minimise the catchment that flows to the basement pump
(addressed as part of prior correspondence).
In support of the above changes DME Projects have revised the Engineering Package which forms
Attachment 2 to this response, with these amendments incorporated within the Architectural Plan
Package.
In accordance with discussions with Council’s engineer it is understood removing the mechanical solution
(flood barrier) to the basement’s immunity shall provide sufficient confidence to Council that the
basement is protected during a significant weather event.




I trust this information is sufficient for your purposes, however should you require any further details or
clarification, please do not hesitate to contact Ben Walsh by telephone on 0430 011 617.
Yours faithfully




Ben Walsh
Director | Principal Planner




                                                                                                  Page 7 of 9
Log in to download the original file

PR22001.IFurtherAdviceResponse.9Feb2023.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.