SUPERESEDED - Decision Notice - MCU23 0139 [As Published] · MCU23/0139
a. The dwelling units are not permitted to be used for short term accommodation, unless
where identified as accepted development by the Noosa Plan or where there is a
Development Permit for Material Change of Use for Short Term Accommodation in
effect. Short term accommodation means the use of the premises for providing
accommodation of less than 3 consecutive months to tourists or travellers.
10. All landscape works must be established and maintained for the life of the development, and
in a manner that ensures healthy, sustained and vigorous plant growth. All plant material
must be allowed to grow to full form and be refurbished when its life expectancy is reached.
ENGINEERING
External Works
11. The development must provide a 2m wide Road Reserve dedication across the full frontage
of the site to Olivine Lane prior to commencement of use.
12. Submit and have approved by Council prior to the commencement of use, a development
application for Operational Works for the following:
All frontage works and associated works. The frontage works are as follows:
(i) Olivine Lane – Lane widening to provide a minimum 5.0-metre-wide carriageway and
2.0 metre wide verge along the full frontage of the site, transitioning smoothly to the
existing kerb and channel beyond the site frontage.
Design drawings are to be prepared and certified by a suitably qualified Registered
Professional Engineer Queensland (RPEQ) and in accordance with approved plans and
documents of development and the Noosa Planning Scheme current at the time of the
Operational Works application.
Notes:
The verge adjoining the development and the carriageway is to be constructed to a minimum
sealed width containing:
a. Kerb and channelling and underground stormwater drainage to the development side
only;
b. Widening and sealing of the existing road pavement to the new kerb line. Concrete to be
designed in accordance with rigid road pavement design principles; and
c. Turfing and topsoil to the new verge area.
This condition has been imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Site Access and Driveways
13. A sealed access driveway must be provided from Olivine Lane to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and must include in particular:
a. a driveway crossover in accordance with Council’s standard drawings RS-049 & RS-
050.
Car Parking
14. A minimum of 3 car parking spaces must be provided on the site. The works must be
undertaken generally in accordance with McLaren Design’s Site Plan (03, Rev. A) dated 31
August 2023 and must include in particular:
a. Two (2) covered car parking spaces within the total; and
b. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
Page 3 of 7
Document Set ID: 22877114
Version: 3, Version Date: 22/03/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERESEDED - Decision Notice - MCU23 0139 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 172 KB (small file)
- File type
No other editions are linked here.