Council archive · source document
Minor Change Existing Approval MCU17 051201 · MCU17/0512.02
Officer: Lisa Pienaar
Direct Telephone: 07 53296514
Our Reference: MCU17/0512.01 : JELDER
Your Reference: n.a
2 August 2019
Ms JM Tynan
C/- Hogg and Lamb
181 Roberson St
FORTITUDE VALLEY QLD 4006
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 25 June 2019, requesting a minor change to an existing
development approval. Council decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: MCU17/0512.01
Street address: 15 Arakoon Cres Sunshine Beach Qld 4567
Real property description: Lot 776 RP 48111
Planning Scheme: The Noosa Plan (8 June 2018)
2. DECISION DETAILS
The following type of approval was issued on 9 October 2017.
Development Permit for Material Change of Use (Dwelling)
In relation to the request to make a minor change to the existing approval, Council on 29 July 2019,
decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Amend condition 2 to read as follows:
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is 6 years starting the day that the original
development approval MCU17/0512 took effect.
PO Box 141 P. (07) 5329 6500 [email protected]
TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Page 1 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan Rev. Plan/Document Name Date
No.
A100 TP03 Site Plan, drawn by Hogg & Lamb 5 July 2019
A200 TP03 Ground Floor Plan, drawn by Hogg & Lamb 5 July 2019
A201 TP03 Upper Floor Plan, drawn by Hogg & Lamb 5 July 2019
A300 TP03 East & West Elevation, drawn by Hogg & Lamb 5 July 2019
A301 TP03 South Elevation, drawn by Hogg & Lamb 5 July 2019
A302 TP03 North Elevation, drawn by Hogg & Lamb 5 July 2019
A403 TP03 Section A, drawn by Hogg & Lamb 5 July 2019
Building Height
3. The maximum height of the development must not exceed 8 metres above the finished
ground level and the natural ground surface.
4. Certification must be submitted to Council from a Licensed Surveyor which certifies that the
building does not exceed the maximum height requirement of this Decision Notice.
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping
6. A minimum of 20% of the site must be retained as soft landscaping.
7. Existing trees on the site and within road reserves must be retained, except where required
to be removed to accommodate the approved dwelling.
8. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
Page 2 of 6
Page 3
9. Screening vegetation must be planted along the northern, southern and eastern boundaries
in accordance with Council’s Planning Scheme Policy PSP3 Landscaping Plants and
Guideline.
Street Trees
10. The property driveway must be located to avoid trees in the street verge. Alternatively, a
request must be made to either Council to relocate the tree clear of the driveway.
Undercroft Screening
11. Undercroft skirting or screening (eg. timber battens) must be provided to the full height of
any undercroft areas of the approved dwelling (including carparking structures) that are
higher than 3 metres above ground level at the perimeter of the building/structure. OR, dense
landscaping must be provided the eastern elevation to screen the full height of the dwelling’s
undercroft area at that location.
Drainage and Earthworks
12. All cut and fill must not exceed 2 metres in depth relative to natural ground level.
13. Fill material placed over services must not impose any additional surcharge loading on the
service.
14. Excavation must not be carried out within 600mm of any utility infrastructure (to top, sides
and base of services). A retaining wall must be provided to support the soil surrounding utility
infrastructure where proximate to excavation activities.
15. Compaction with a vibrating roller must not be carried out within 600mm of any utility
infrastructure.
16. Other than for accessways, filling must not extend more than 1 metre beyond the footprint of
the approved dwelling when measured from its outer walls.
17. Earthworks required on site must be carried out in accordance with Council’s Planning
Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
Geotechnical Stability
18. All works must be carried out in accordance with the recommendations of the Slope Stability
Assessment and Soil Test Report prepared by SCG Consulting Engineers and dated 26 April
2017.
Coastal Protection
19. External colours and finishes of the building must comprise of muted/environmental tones
that blend with the natural environment.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
PLANNING
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
Page 3 of 6
Page 4
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations
under the ACH Act.
Infrastructure Charges
2. This Development Permit will not trigger an “Infrastructure Charge Notice” to be issued in
accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning
Act 2009 and in conjunction with the State Planning Regulatory Provision (Adopted
Charges).
Property Driveway and Vehicle Crossover
3. The planning scheme declares Operational Work for the construction of a driveway and
vehicle crossover to the property to be self-assessable against the Detached House
Driveways Code. A self-assessable application is required to be submitted to Council for the
vehicle crossover (*link below) OR if the proposed driveway and vehicle crossover does not
comply with each Acceptable Solution contained in the Code, a Development Permit for
Operational Works the work is required to be obtained from Council.
*http://www.noosa.qld.gov.au/documents/40217326/40415739/Vehicle%20Crossover%20Application%20Pack.pdf
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building works
10. SUBMISSIONS
Not applicable.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
YF
Enc: Appeal Rights
Approved Plans/Documents
Page 4 of 6
Page 5
cc. Unitywater
DECISION NOTICE HISTORY
Original Decision Notice – MCU17/0512 – 9 October 2017.
Decision Notice - Minor – MCU17/0512.01 – 29 July 2019, with an amendment to conditions 2.
Page 5 of 6
Page 6
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 6 of 6
Used in these records
Minor Change Existing Approval MCU17 051201.pdfRelated documentApplication case desk ↗
About this file
- File size
- 178 KB (small file)
- File type
No other editions are linked here.