Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2603-51047 SRA Response with conditions

Attached to the e-mail SARA response with conditions.

of 5

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                             2603-51047 SRA




Attachment 2—Advice to the applicant

General advice
1.      Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
        or the State Development Assessment Provisions (SDAP) (version 3.5). If a word remains
        undefined it has its ordinary meaning.
Transport noise corridor
2.      Mandatory Part (MP4.4) of the Queensland Development Code (QDC) commenced on 01 Sep
        2010 and applies to building work for the construction or renovation of a residential building in a
        designated transport noise corridor. MP4.4 seeks to ensure that the habitable rooms of Class 1,
        2, 3 and 4 buildings located in a transport noise corridor are designed and constructed to
        reduce transport noise. Transport noise corridor means land designated under Chapter 8B of
        the Building Act 1975 as a transport noise corridor.
        For further information on Transport Noise Corridors and assistance with the Queensland
        Development Codes, please refer to the website below:
        https://www.business.qld.gov.au/industries/building-property-development/building-
        construction/laws-codes-standards/queensland-development-code/transport-noise-corridors

Public utility works and connection approval
3.      The applicant is advised that if any works and/or connections are required to public utility
        services within a state-controlled road reserve, approval must be given by the Department of
        Transport and Main Roads (DTMR) under the relevant public utility legislation (electricity,
        water/sewer, telecommunication), and in accordance with DTMR technical standards (Non-
        Transport Utility Management and Design Manual).
        Approvals must be obtained prior to commencing any utility works within the state-controlled
        road reserve. Please contact the public utility team via [email protected] for further
        information on the application and approval process.




State Assessment and Referral Agency                                                             Page 4 of 5
Log in to download the original file

2603-51047 SRA Response with conditions.pdf · 320 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.