Council archive · source document
Response to Further advice - 20220156 Kauri St SWMP · MCU22/0144
STA
NDA
R DS B99
B99 B99 N Z)
B929004 (
200 STANDARDS 2004 (AU_NZ) AU _
4 ( STANDARDS 2004 (AU_NZ)
AU_ S
NZ) RD
NDA
STA
B9904 (AU_NZ)
Z)
2004 (AU_N
2.66m 2.66m
STANDARDSB99
STANDARDS 20
All rights reserved.
reserved.
Solutions, Inc.
Inc. All rights
(c) 2022 Transoft
Solutions,
Transoft
(c) 2022
B920904 (AU_NZ)
STANDARDS 2004 (AU_NZ)
S S S S S S S S S S S S S S S S
reserved.
rights
Inc. All
Solutions,
Transoft
(c) 2022
ARDS
B99 All rights reserved.
(c) 2022 Transoft Solutions, Inc.
STAND
B99 ENTRY/EXIT VISITOR PARK BAY #2 - FORWARDS IN
B99 ENTRY/EXIT VISITOR PARK BAY #1 - FORWARDS IN
B920904 (AU_NZ)
STANDARDS
B99 B99
2.66
STANDARDS 2004 (AU_NZ STANDARDS 2004 (AU_NZ)
(c) 2023 Transoft
Solutions, Inc. All
rights reserved.
)
m
B99 ENTRY/EXIT VISITOR PARK BAY #3 - FORWARDS IN
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
PROPOSED RESIDENTIAL DEVELOPMENT
SUNSHINE GROVE PTY LTD TITLE: STATUS:
D 19/12/22 RFI UPDATE BRP JB BRP 9 KAURI STREET VEHICLE SWEPT PATHS MATERIAL CHANGE OF USE
© ABN 89 647 469 707 C
B
28/10/22
16/08/22
RFI ISSUE
UPDATED SWEPT PATH LAYOUTS
BRP
JAC BRP
BRP
BRP
COOROY, QLD, 4563 BEN PARRY LAYOUT - VISITOR BAY 1 & 2 AND
RPEQ: 28084
37 MARY ST
NOOSAVILLE, QLD 4566
A 10/08/22 COMBINED MCU AND OP WORKS ISSUE JAC BRP JB SCALE:
CPEng NER
OPERATIONAL WORKS
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
AS INDICATED DATE: 13/01/22
DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
C60 20220156 A1 D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Further advice - 20220156 Kauri St SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.