Council archive · source document
Response to Further advice - 20220156 Kauri St SWMP · MCU22/0144
Site Catchment Areas for DRAINS Modelling Project number: 20220156 Calculations: B. Parry Street Address: 9 Kauri Street Locality: Cooroy, Noosa Shire Council Date: 27/06/2022 Existing Site Existing Site Directly connected (m²) Indirectly connected (m²) Kauri St Roof 200.5 0 200.5 Impervious Ground 80 0 80 Driveway 0 0 0 Total Imp 280.5 0 280.5 Total Per 1857.5 Site Area 2138 % impervious Effective DCIA = 75% DCIA ICIA +25% ineffective DCIA 0 280.5 Impervious 13.1% 0.0% 13.1% Pervious 86.9% Proposed Site Proposed Directly connected (m²) Indirectly connected (m²) Kauri St Roof 1002.2 1002.2 0 Impervious Ground 24.7 24.7 0 Driveway 510.8 510.8 0 Total Imp 1537.7 1537.7 0 Total Per 600.3 Site Area 2138 % impervious Effective DCIA = 75% DCIA ICIA +25% ineffective DCIA 1153.3 384.4 71.9% 53.9% 18.0% 28.1%
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Further advice - 20220156 Kauri St SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.