Decision Notice - 010.2009.00000951.001 [As Published] · 132009.951

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                                                                       2009/951




          Plan No.            Rev.    Plan Name – Prepared By                         Date

          Sheet 1/18          B       Cover Sheet – Bush & Beach Pty Ltd              2 July 2009

          Sheet 2/18          B       Site Plan– Bush & Beach Pty Ltd                 2 July 2009

          Sheet 3/18          B       Floor Plan – Bush & Beach Pty Ltd               2 July 2009

          Sheet 4/18          B       Elevations 1 – Bush & Beach Pty Ltd             2 July 2009

          Sheet 5/18          B       Elevations 2 – Bush & Beach Pty Ltd             2 July 2009

          Sheet 6/18          B       Section 1 – Bush & Beach Pty Ltd                2 July 2009

Relevant Period
2.     The Development Permit for a material change of use lapses if the use has not happened by
       17 August 2013, unless an application to extend the currency is approved by Council.
Security Bond
3.     Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be
       submitted, to secure performance of all conditions of this approval, prior to the issue of a
       Development Permit for building works. The cash bond or trading bank guarantee will be
       returned on performance of the conditions of approval less any costs incurred by Council in
       respect of enforcing performance of this permit.
Building Height
4.     The building height shall not exceed 8.0 metres and 2 storeys above the natural ground level
       and finished ground level.
Landscaping
5.     A minimum of 20% of the site shall be retained as soft landscaping.
6.     Screening vegetation of 200mm pot size consisting of native, endemic species with a mature
       height of not less than 5 metres shall be planted at a minimum of 1.5 metre centres to
       northern boundary for the full length of the dwelling in accordance with Council’s PSP 3
       Landscaping Plants & Guidelines.
Water Storage
7.     On site water storage for a minimum of 45,000 litres shall be provided on site to service the
       detached house.
Earthworks
8.     Earthworks required on site shall be carried out in accordance with Council’s Planning
       Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
       ponding of water on any adjoining lands or concentrate or direct overland flow on to an
       adjoining property.
9.     Sediment and erosion control measures must be in place prior to the demolition of the shed
       and building work. If such measures are not in place or are not satisfactory, ‘on the spot’
       fines may be issued. Such fines can be issued if sediments from the site are found to enter
       or have the potential to enter Council’s stormwater system or natural waterways.
General
10.    All hot water systems installed shall be either solar systems; electric heat pump systems; or
       gas systems (LPG or natural).
                                                                                     Page 2 of 7

Used in these records

About this file

File size
56 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2009.00000951.001 [As Published].pdf · 56 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.