Original source · versioned page text
Attachment 6 - Ecological Assessment.pdf
Ecological Assessment – Attunga Heights
Performance outcomes Acceptable outcomes Response Comment
PO4 In consideration of vegetation AO4.1 Clearing occurs in accordance with Table 3. Vegetation to be retained will be of a sufficient size
on the subject lot(s) and in the and configured in such a way that current
landscape adjacent to the subject connectivity values are maintained. The site
lot(s), vegetation is retained that: currently holds limited connectivity value in the
context of the locality and clearing of a small
(1) is of sufficient size and proportion of vegetation is not expected to impact
configured in a way that on movement opportunities for local fauna.
maintains ecosystem functioning Rehabilitation works will reduce threatening
processes acting on the site and ensure that the
(2) remains in the landscape
vegetation continues to contribute positively to the
despite threatening processes. local landscape.
Connectivity (coordinated projects)
PO5 In consideration of vegetation AO5.1 Clearing occurs in accordance with Table 3.
on the subject lot(s) and in the
OR
N/A
landscape adjacent to the subject
lot(s), vegetation is retained that:
AO5.2 Where it can be demonstrated that clearing
(1) is of sufficient size and cannot be reasonably avoided, and the extent of
configured in a way that clearing has been reasonably minimised, an
maintains ecosystem functioning environmental offset is provided for any significant
residual impact from clearing of vegetation that
(2) remains in the landscape forms a connectivity area.
despite threatening processes
Editor’s note: Applications for development should N/A
or where this is not reasonably identify whether there is likely to be a significant
possible, maintain the current residual impact and a need for an environmental
extent of vegetation. offset having regard to Section 3.2 (Connectivity
areas) of the Significant Residual Impact Guideline
and the relevant Queensland Environmental
Offsets Policy.
Soil erosion
PO6 Clearing does not result in: AO6.1 Clearing is undertaken in accordance with a Clearing will be undertaken in accordance with a
sediment and erosion control plan which avoids sediment and erosion control plan which avoids and
(1) mass movement, gully erosion, minimises land degradation.
Job No: Q12038/RW1 JWA Pty Ltd 76
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 6 - Ecological Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.