Minor Change Existing Approval 51992 213 03 (As Published)
Officer: Andrew Gaffney
Direct Telephone: 07 53296284
Our Reference: 51992.213.03
Your Reference: Noosa Scouts
27 November 2025
Scouts Queensland
C/- Across Town Planning
11 Bareki St
WURTULLA QLD 4575
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 23 October 2025, requesting a minor change to an existing
development approval. Council decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: 51992.213.03
Street address: 11 Eumundi Noosa Rd Noosaville Qld 4566
Real property description: Lot 7 RP 224431
Planning Scheme: Noosa Plan 2020 (26 September 2025)
2. DECISION DETAILS
The following type of approval was issued on 12 July 1996
• Development Permit for Material Change of Use of Premises - Special Uses – Scouts
(dormitory, kitchen and dining room)
In relation to the request to make a minor change to the existing approval, Council on 20 November
2025, decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Amend conditions 20, 21, 22, 23 & 24.
C. Include additional conditions 25 and 26.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is 2 years starting from the day of this approval
(51992.213.02).
below.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 5
Document Set ID: 24343810
Version: 5, Version Date: 01/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
To be read in conjunction with approval 3B-259/03536 TP, copy attached.
PLANNING – Additional Conditions 13 October 2015
When Conditions must be Complied With
15 Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
16 Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
A Site Plan, prepared by Noosa Sea Scouts 15/09/2018
Page 1 of 1 Plan Sheet, prepared by Shed Boss 11 Aug 2015
Sunshine Coast
17 The shed must be setback a minimum of 4 metres from the northern boundary.
18 The vegetation along the northern boundary adjacent to the shed must be retained. The
vegetation may be side trimmed. In this regard the vegetation to be retained must be
protected from construction activities by:
a. clearly marking the vegetation with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. fill or excavation must not impact on the health of the vegetation
d. using low impact construction techniques around vegetation.
19 No windows or doors are permitted on the left elevation.
Approved Plans – 20 November 2025
20 Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
- - Site Plan, prepared by Noosa Sea Scouts 9/10/2018
Annotated by Council
- - Proposed Shade Shelter – Dimensions, Elevations 9/10/2018
and 3-D Plans, Noosa Sea Scouts
A02 E2 Site Plan, prepared by Salt Air Modular 26/08/2025
Annotated by Council
A03 E3 Floor Plan, prepared by Salt Air Modular 28/08/2025
A05 E2 Elevations (1), prepared by Salt Air Modular 26/08/2025
A06 E2 Elevations (2), prepared by Salt Air Modular 26/08/2025
Page 2 of 5
Document Set ID: 24343810
Version: 5, Version Date: 01/12/2025
Page 3
A13 E2 Roof plan 26/08/2025
21 The shade shelter must be setback a minimum of 10 metres from the southern boundary and
45 metres from the eastern boundary of the site.
22 The maximum height of the shade shelter and ablution block must not exceed 4.5 metres
above the finished ground level and the natural ground level.
23 With regard to the construction of the shade shelter and ablution block, existing trees on the
site must be retained. Trees must be protected from construction activities by using low
impact construction techniques around vegetation.
24 The ablution block must be connected to the onsite sewer connection in accordance with the
standards and requirements of Northern SEQ Distributer-Retailer Authority (Unitywater).
Additional conditions - 20 November 2025
Flood Immunity
25. The approved ablution block building must be constructed to provide flood immunity against
the Defined Flood Event (1% AEP event).
Building Appearance
26. External colours and finishes must be of muted environmental tones, with broad
expanses of a single colour not permitted. Walls must be broken up by varying tones
or design elements.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
1. This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in
accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning
Act 2009 and in conjunction with the State Planning Regulatory Provision (adopted charges).
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in addition
to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Infrastructure Charges
3. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Page 3 of 5
Document Set ID: 24343810
Version: 5, Version Date: 01/12/2025
Page 4
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
• Development Permit for Building Works
10. SUBMISSIONS
Not applicable.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Andrew Gaffney
Senior Development Planner | Development Assessment
Development & Regulation
Enc: Appeal Rights
Approved Plans/Documents
DECISION NOTICE HISTORY
• Original Decision Notice – 12 July 1996.
• Decision Notice - Minor Change 51992.213.01 – 13 October 2015 – additional conditions 15, 16, 17, 18 and 19;
• Decision Notice – Minor Change 51992.213.02 – 23 October 2018, amend condition 16 and additional conditions 20, 21,22, 23 &
24.
• Decision Notice - Minor Change 51992.213.03 – 20 November 2025, with an amendment to conditions 20, 21, 22, 23 & 24 and
additional condition 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35 & 36.
Page 4 of 5
Document Set ID: 24343810
Version: 5, Version Date: 01/12/2025
Page 5
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 5 of 5