Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Attachment 5 - Bushfire Management Plan (Updated) August 2020 · OPW20/0145

of 25

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (15.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
Report on Updated Bushfire Management Plan for                  Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic




6.2 Specific Outcomes
13.33–04                               − The proposed use does not compromise the safety of
(General)                                people or property from bushfire. The detailed set of
                                         mitigating actions provides for a very safe
                                         environment
                                       − Complies

13.34-07/013                           − The provision of separation buffers of up to 20 metres
(Siting, Design and                      from adjoining vegetation along with the capacity to
Construction)                            construct all building to a construction standard under
                                         AS3959 has been demonstrated. i.e. max. of BAL 29
                                       − Complies
13.35-08                               − The provision of fire hydrants exclusively for
(Water)                                  firefighting confirms a strong response capacity for
                                         firefighting appliances.
                                       − The entire site has a reticulated water supply with
                                         appropriate fire hydrants.
                                       − Complies
13.36-09                               − The proposed network of vehicular access provides
(Vehicle Access and Fire                 excellent access for emergency vehicles.
Trails)                                − Complies
13.37-010                              − The development nodes when cleared will be low
(Reconfiguring a Lot)                    bushfire risk areas and enhance the overall safety for
                                         the entire development.
                                       − Complies




 19-001 Updated Report – August 2020                                  Commercial-in-Confidence
                                                                                       Page 8

Used in these records

About this file

File size
15.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Bushfire Management Plan (Updated) August 2020.pdf · 15.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.