Council archive · source document
Attachment 5 - Bushfire Management Plan (Updated) August 2020 · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
Very large file (15.0 MB): may take a few minutes to open.
z
EMTU
SP182880
Se
EMTE
oy SP167978
ey, Na 712245 eur BO AD
RP844425
Cov! No, 602533554 147
SP182845 NPWEB9
No. 710227518
~% SP182880
Lae No. 710227520
lease
Cov.K No. 710981233
SP182845
RPIN7294
No. 602533547
SPIB2B45
No. 710227518
RP2IS9B3 | P46 762
3
RPI60983
s
v. ;
Total Site Area — 31.73 ho (Lot 3 on SP246584) Cowl 2
SPIBZB45 §
Qeveloped Area ~ 1.2662 ho No. 710227518 gy
nt Are
Covenont l— 0.5254 he
Covenant J - 1.3000 ha 3
Covenant K - 0.2000 ha SPIEZE4S
Covenant L - 0.3466 ha ' SP182845
zu Ace
Areo | =~ 0.3375 ho ~ inclusive of sewearage Emt. 710227520 (4m *)
Area 2 ~ 2.6104 ho ~ inclusive of: A aewnped'A
~ Electricity Transmission Emt. 602533547 (6699m *) ud veloped Area
~ Water Supply Emt. 602533554 (19m *) a
= Drainage Emt. 710212346 (618m *) | Developable Areo
Area 3- 0.7919 ha .
Areo 4 — 13,0432 ha | Environmental Covenanant
Area 5 — 12891 ha es
Area 6 - 0.0197 ho
TOTAL — Disha
09 40 80 160 240 320 400
Developable Area Plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Bushfire Management Plan (Updated) August 2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.