NOOSA Checklist - Applications Involving Land
ne Development & Land Use Sections
IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

1. APPLICATION FORMS ee ae uy
1.4. Form PartA
1.1.1 Ensure that the form is fully completed. SJ

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
4.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [AY

1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [A
2, REFERRALINFORMATION © |” Oe Te
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. CT
3. ” ENVIRONMENTALLY RELEVANTACTIVITIES = 7g

 

3.1. Ensure that Part G is completed if EPA referral is required.

 

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

‘4. | .FORM 2:- REQUEST TO CHANGE APPROVAL <n “ee voy

4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

 

 

 

 

 

 

 

5. PLANS - . 2 . te, dye PRs,
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa! “
Works) accompanies the application. In addition ensure that each set is complete. aaa
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is -
unbound.
6) SUPPORTING INFORMATION 7" Ba te ow

 

6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is

capable of reproduction. [=]
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.

 

woe Beppe eT (homie tae (APO am mee ata wage a tn ey .
7. ° FEE BO See am ae Ok wy ee?

7.1 Ensure that the application fee, as determined from the Councit’ s adopted scale of fees,
accompanies the application or has been paid.

7.2 Ensure that the fee which has been paid is recorded on the application form.

 

 

 

 

 

 

l.
Receiving Officer... vee Nem, oc cceseceenessieee Date FZ MAED....

pplication, please deliver both to the following IDAS Application Receiving

   
 

 

Having completed this form and accepted

trays:-

«Ifthe application is for a Material Change of Use exclusively ~AOP1’s desk in the Land Use Section.

¢ — Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.

«Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively ~ AOD2 in the
Land Development Section.

»  Inall other circumstances — AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

SEP1 g:\ant\forms\application checklist.doc

 
Full text of the other 33 pages

Page 2

 

 

AWWAINA \ EXUDING fA NFPROVALS

 

 

 

 

 

Lijersrererere) Se ~ pram a 9

 

Date 24.9.2007

Noosa Council
PO Box 141
Tewantin Qld 4565

Dear Sir/Madam

Application for operational works permit

 

Type of Work: Duplex
Site Address: |4 Grant St Noosa
Property Description: Lot 10 SP 179879

 

 

 

On behalf of our client we would fike to apply for an operational works permit for the
above address.

Please find attached form 1, Parts A & E, Idas checklist and 4 sets of Architectural,
Hydraulics and Landscape plans.

For any further information please contact Peter Lusio on 0416260416.

Yours fai

Peter Lusio
BUILDING CERTIFIER, Accreditation # A927431

Suite 14, 21 Nicklin Way, Buddina Q 4575
Phone: 54440430 © Fax: 54440429 « Mob: 0416260416
[email protected]

 

 

Page 3

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

Romeo nen eci Ce

 

ommon details

i

 
    

_
<t
a.

 

“The completion of afl applicable questions on Part Ais mandatory for all applications Part A must be accompanied by the completed IDAS Assessment Checklist if
_.: + fequited, and by one {1) oF more other conipleted parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qld.qov.au.
* Any information tequested i in the form may be provided in an attachment to the application. For further information about completing the following details; refer to Guide 1,

 

 

 

 

 

 

  

 

 

 

 

 

 

 

  
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| 4... Street address: fncluding house number, street name, suburb/ocality name & postcode) (if applicable): ;
identified. However: @ description ofthe land is nat” | 19 Grant Street. Noosa Heads __ 5
eal rah 2... Name of, water body or Watercoursé; within which the development is proposed: (if applicable)“
Advice for completing Q2 - Q2 appies if “ .
develbpmen proposed within a weter body or : [NA — SEF SALAS : re — J
watecouise, 3. , Lot on plan description (eg. Lol. 123 on RP. 4567) / GPS coordinates: ! °."--! :
‘Advice for co: pl ting Q3 - Most land can be
identified by a tot on pian description. Thesa detals Lat Jhon SP 179879 ]
tr through the ———
can be oops fem te documents o¢ ous 4:.” The above description is.for: j :
Hove ti tnd ic be eps | (i) - the land on which the apn
ne norobaoeae B oposed en os fon fe ) @ii). the land adj joining ie watet body ¢ or watercourse, within which the dveloprnsnt is is
wotercoue) provide ~ proposed; or : :
9 te eon pln déaipton tte gO (ii), the water ‘body or watercourse." . :
ii) GPS coordinates where there i . . . so.
® ‘djoninglaecent end, (eg. hn Moreton Bay) 5. Shop {tenancy number: : 6. Storey / level: 7, Total area of land: {m? or ha):
Advice for completing Q7 - Q7 does not apply il the | | . | 2 | | 543 m2
development is within 8 water body or watercoursa, ae mt — — .
Advice for completing Q8 - if fan i + band.ic ci . ran
develpnentiswikin a bcal aherhes | wea 8. _ Local govemment area in which the larid.is situated: (eg. Esk, Hervey Bay, Woocoe.etc,) {if applicable)
Note: Areas below high water mark are not within a | Noosa Shire |
Jocal government's area unless provided for under the - -
Local,Government Act 1993. 9. Port authority for the strategic port.fand.or strategic port land tidal area on which the
‘Advice.for completing Q9 - QS apples if ny i an o Dart ot Bri ‘tte {7 aah} :
developments on strategic port lard or a strategic development is proposed: (eg. Port of Brisbane, Port of Townsville} {if applicable} .
pot land tidal tea. For moe det refer to Guide 1 { |
‘ Proposal details . 10... Existing use of the'land:.(eg. vacant. single-héuse, shop etc). ne oS
if there is insufficient room aveilable, details may be
provided i inn attachment fo the. application. | Vacant Land -
ane 41, Proposed ‘use of the land: (eg t
ponds: with @ total'area of 7 ha for.w 2 released into walers etc): wel
| Dual Occupancy Units D uplex |
Other applicable parts of Form 4 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part r etcy .
Part A must gfways be accompanied by other
competed parts of Form 1, For information about | Part B and Form 1 & 2 l
_When'a part of Form i may applyreterto Guide, | Lo ba an
Applicant details 13. Applicant's name: ae _ 15. Contact person: . “
Charly identify who.is making the application. The
pte tel sn y'bo cesar cl ne one | M& JExley a ; | [Mathew Exiey |
When signing and lodging this application 14. Contactnumber. Soo 16. Facsimile number/e-mail address: :
‘The’ appicant is responsible for ensuring the
information provided is Goitect, The assessment 54744 144 5471 1144
manager, any referral agency & the Chief Executive : ae [email protected]
{where applicable) will rely on this information when “ . .
assessing and deciding the appication. 47. Postal address: : . : :
If the applicant is a company - a contact person
mstbe downs Sen | 14 Sunrise Rd. Sunrise Hills. 1563
18. Signature: 19. Date:

 

 

28/08/2007
LS <4 a

 

 

 

 

a

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

 

 

Land owner's consent (if applicable) 20. Land owner's consent to the making of this application:
Secton 3.2.1(3) of the PA prescribes that an i
zpptcation must contain, o be supported by. the Name Signature 7 Date

 

itten of the tand fs, if the appication
ines ome e ee (i) Mathew Eexley /> > | 2810807

(1) 3 material change of use;

Ll
@) figuration of a bt; ~~
w yak on bod bebe igh-water mark & nol within a (i) Joanne Exley LZ LF is00007

 

 

 

 

 

 

 

 

 

 

 

 

canal as defined Under the Coastal Protection and O alae

Management Act 1995;0¢ "i a
(@¥) work on rail corridor land defined under the (iii) A

Transport infrastructure Act 1994.
Section 3.8.1(2K@) of the IPA provides that .
lendowner's consent is not required for a mobile or (iv)
temporary ERA .
For more information refer to Guide 1, (v)
Resource entitlement (if apicable) 24. Does this application involve a State resource prescribed under @ regulation (other than involving
* Section 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and donagement Act 1! $95)?

_ fesource enitlement be ‘given for applications that

 

I No- 010.024 [DYEs - goto 022
Section’3.2 40Xa\(ii) of the [PA presorbes that an

‘application cannot be taken to be properly made 22. This application i is accompanied by evidence: (ick app ie ‘box}

“et ine recite oe me entenen : 1 @) ofthe allocation of, or entitlement fo; the resource
vice for completing Q21 & 22 —
Refer to schedule 10 of the Integrated Planning O i) the chief executive of the department administer

Regulation 1998 that prescribes the nature of evidence
rod Oy tre Stolen copper ol the beeing of tae development is consistent with. an allocatio
development appication:- . 0
Pete as i) (ii) the chief executive of the department achrinisteting th res urce is satist ied the

development application may proceed in the absence ¢ an ‘allocation of,-or
” entitlement to, the resource’~ go to 023 . :

 

    
  
 
  
 

 

 

idence and go to Q23{vi)

e resource is Satisfied the
If entitlement to, the fesouree = go

 

      

Advice for completing Q23 23. | Evidénée of the resouite entitlement:
The information in (i) = (v) is mandatory if evidence is . -

regfed under G22 (ior (i) bow. (i) Resource entitlement / authority details -#-+(Vii) Official’ stamp of the department
Resources, Mines ard Water is mandatory where the 7 “ applicable) : .
application involves any water or riverine quemry (ii) Name of delegated officer :
Section 3.2:1(5A) allows the resource manager bo imit .

the time the evidence may be used. Q23 (vi) must ba

conpbted tthe endence’s fine ited. (iii) Position of a officer

(iv) Signature of delegated officer

 

 

 

 

 

 

 

0) Date

(vi) Fe ; cael eer at — EAE) PASS

. 24, \s the IDAS Assessment Checklist completed anda att \
This checkist does: ‘net apply ift the ippteation requires Q& YES .

 

 

 

 

    
  

 

 

 

 

 

 

 

 

the compltion of Pars A and B of the Form only. I “TINO - the assessinent manager refuse | to accept’ this application on the
must be completed for all other applications, grounds that the application ‘fas'not been Properly friade
Plans {drawings {reports — 25. Plane/Grawingslfeports ac accompanying this application: : wl.
Aer ie hopenald eae te occocinent Ste Plan / Orawing / Report Number Title Date
manager, referral agencies and any person viewing a ,
the application during pubfe scrutiny or public (i) = 10f4 Site Plan 27/08/07
ratification to understand the scope of the proposal ~
and any ' pofentialimpact. Moe (ii) 20f4 Floor Plan 27/08/07

, (ili) 30f4 Elevations A - B 27/08/07

(iv) 40f4 Elevations B - C 27/08/07

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to pravide all appticable information required by Part A
and any other relevant part of Form 1.

 

  

OFFICE USE ONLY (applicable to assessment manager's)
:® 2640 >DATE aft 2(2)., RECEIVING OFFICER'S | Q

fe. RECEIVED “NAMEN
Notification of Engagement of Private Certifier (Oplional form

        
  

       

 

 

To Council. | have been engaged as the private cettifier for the building work referred to in this application. '

Date ofengagement: / / Accreditation Number. —— Name: . Signature:

Page 5

‘ INTEGRATED PLANNING ACT 1997

 

Operational &/or building work

assessable against a local government’s planning scheme

 

Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local govemment's planning scheme.

 

A development permit authorises reliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
development to occur, while a preliminary infrastructure, etc

approval is a step in the approval process

Nature of the application 1. This gpricaton is for {tick one (1) or both if applicable)

 

 

and does not authorise development to occur. [ Landscaping, Civil works, Stormwater, Landscaping, etc
The types of work that are assessable against ——
—_ &. a planning scheme are determined by the AND / OR
Silay fora Patiala toca I government and Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage

" infrastructure, etc
To determine the types of work that are |

assessable under a particular planning
scheme, contact the relevant local .
govemment. ~ 2. Are the works subsequent to a previous development approval?

(No LD YES - provide details of ail previous approvals (eg. file references)
3. _ Is the subdivision for a canal estate?
XX] No Cyes
Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?

|

PI ? ficable) . - (11 YES - complete 05
Prior to issuing a development permit for the
works, the assessment manager is required XJ NO - 05, 6 & 7 do not apply

by law to “sight” an approved form, issued by :
Qleave, which signifies that the PLSL levy |5. Has the PLSL levy been paid?

has been paid. (I YES - completeas
@ LX] NO - the appiicable levy must be paid before @ development permit can be given for the works

6. How much was paid?
[ Na |

 

7. Whatis the receipt number of the payment?
[Na

 

 

 

PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other refevant part of Form 1.

 

 

OFFICE USE ONLY (applicable to assessment manager)

REFERENCE
DATE RECEIVED NUMBERIS

 

 

 

 

 

 

 

Page 6

“+ _ INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004
7 (i) "ls aPLSL levy applicable in this instance? [NO LD YES - complete ari

 

(ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application?

KINO (71 YES - provide receipt details below

 

 

 

 

Page 7

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

“° a

   
 
   

Form 1 Development Application

IDAS Assessment
Checklist

(Formerly the “Referrals Checklist”)

 

IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the “Referrals Checklis?. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. Under the IPA and IDAS framework, an application may require assessment by the loca! Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.

. Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & 8 only).

5. __ Itis the responsibility of the applicant to accurately complete this checklist.

6. Section 2 is mandatory only if the proposed development is located in any part of a wild river area dectared under the Wild Rivers Act 2005.

7. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

8. The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.

9. — Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.ald.gov.au. Guide 25 explains the role of the IDAS.
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www.ipa.aid.qov.au.

11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

 

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for bullding work assessable against the Building Regulation 2006.

 

 

 

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For more information refer to Guide 4. CI (i)_ an environmentally relevant activity (ERA) for which a code for environmental compliance

trates you anowered "nove ofthe above oat, has not been made - complete Part G of Form 1
€ application requires assessmen ie ee 4. . 7 .

a aint author 3, ¥ C1 (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
wl not

fan entity, other than the administering Made - complete Part G of Form 1

authority, is the assessment manager for the kK) (iii) none of the above

application, the administering authority is a
concurrence agency for the applicatian in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 1
for approval where an allocation under the Water
Act 2000 is required.

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable to assessment manager}
DATE RECEIVED REFERENCE NUMBERS |

 

 

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of ihe IPA.

2 Far additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’

3. The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) of the Queenstand Department of Primary Industries and
Fisheries (for a delegated ERA).

Page 1

Page 8

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

State-controlled road matters 2. The application involves: (tick applicable box/es)
For more information refer to Guide 3. LI (i) devetopment on land contiguous* to a State controlled road and for -
Unless you answered ‘none of the above” fo Q2, = . . .
the application triggers referral to the Department} (a) material change of use assessable against the planning scheme;
of Main Roads (DMR) as a referral agency. — (J (b) reconfiguring a fot unless -
In certain circumstances DMR will be an advice : . .
agency, while in other circumstances DMR wil « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Scheie 2 ofthe F Reewlation wt assistyou to Ol} operational work (not associated with @ material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above}—

« associated with access to a State-controlled road; or

« for filling or excavation; or

« involving the redirection or intensification of site stormwater from the land, through a

pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
LD (ii) development on land not contiguous to a State-controlled road and -
(a) material change of use -
« assessable against the local government’s planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;

CJ (b) reconfiguring a tot for a purpose mentioned in schedule 5 of the IP regulation

and exceeding the thresholds set by that schedule;

(1 ©) operational work (not associated with a material change of use assessable against the

planning scheme or reconfiguring a fot mentioned in (b) above}-
« assessable against the iocal government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
{1 (iii) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. oO (i) material change of use -
Unless you answered “none of the above’ to Q3, . . .
the application requires assessment by the (a) assessable against the planning scheme;
Department of Natural Resources and Water b) on alot containing —
Department of Natural Resouces and Water tb) 9 Z
tan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa « if there is no property map of assessable vegetation for the lot - remnant vegetation;
concurence agency forthe appicaion in elation (c) where the existing use of the land is a rural or environmental use; and
if you ticked (3() of (i, your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
Teferral to NRW for assessment regardless of oO (ii) reconfiguring a lot -
whether vegetation clearing is proposed or not. .

(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;

(c} where 2 or more lots are created; and

{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1

Li (iii) operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a jot mentioned in (ii) - complete Part J of
Form 1

EX] (iv) _ none of the above.
Strategic port land 4. The application involves:

For more information refer to Guide 11.
If you ticked (i) - the relevant Port Authority is the
assessment manager for the application.

If you ticked (ii) Queensland Transportis a
concurrence agency for the application.

 

 

(1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1

(1 (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part of Form 1

BX] (iii) none of the above

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-

controlled road.

Page 2

Page 9

INTEGRATED PLANNING ACT 1997

Acid, sulfate soils
For more information refer to Guide 10.

Unless you answered “none of the above” to Q5,
the application requires assessment by
Department of Natural Resources and Water
(NRW).

lf an agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves development on land situated in an identifiedS local government area
and where the surface of the land is: (tick applicable box)
C1 (i) below 20m AHDS and the development will involve the excavation of 1000m3 or more of
soil or sediment at or below 5m AHD, or
C (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material

KX (iii) none of the above

 

 

 

Major hazard facilities or possible
major hazard facilities

For more information refer to Guide 17.

lf you answered “YES” to Q6, the application
requires assessment by the Department of
Emergency Services (DES).

If an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
elation to this matter.

 

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

INO

(YES - complete Part L of Form 1

 

Water related development under the
Water Act 2000

For more information about items (a) - (f), refer
to Guide 15. For more information about item
(g), refer to Guide 14 Does my application
involve assessment of a referable dam?

Unless you answered “none of the above” to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
elation to this matter.

The application involves:

C1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)

CJ (a) in a watercourse, lake or spring, (eg. @ pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Ke, Ka, Ks, Ke, or Ks of Form 1 whichever is applicable,

[1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ky of Form 1;

(1c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
use - complete Part K; of Form 1;

(Cd) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part Ki of Form 1;

(1 (e) for taking overland flow water in certain areas covered by a water resource plan
— complete Part Ks of Form 1;
Off

for interfering with overland flow water in a drainage and embankment area -
complete Part K1o of Form 1
(1 (g) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; OF
EX] (ii) none of the above.

 

 

Removal of quarry material from a
watercourse
For more information refer to Guide 16,

If you answered “YES” to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).

if an agency other than NRWis the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?

KI NO

(11 YES - complete Parts Kr and G of Form 4

 

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Datum (AHD).

Referable dam is defined under the Water Act 2000.

6
7 The declared ground water areas are listed in Guide 13 Development in a declared catchment area.
8
9

Watercourse is defined in sch 10 of the IPA.

Page 3

Page 10

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
focat gavemment tidal areas refer to Guide 24.
Untess you answered “none of the above" to Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).

[fan agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.

Local government is the assessment manager
for afl prescribed tidal work.

9.

The application involves operational work that is: ( tick the applicable box/es)

(i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; of

Ci (ii) tidal work that is prescribed tidal work" other than in a canal"? -complete Part P of Form 1; or

Ci (ii) carried out within a coastal management district under the Coastal Act and for ~ complete
Part M of Form 1 if any box/es (a) to (i) below are ticked,

[1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
fo be assessable against the Water Act 2000 ;

(J (b) constructing a canal’? intended to be connected to tidal waters;

CI (c) constructing an artificial waterway:

[1 @ reclaiming land under tidal water;

{e) disposing of dredge spoil or other solid waste material in tida! water;

(1 (interfering with quarry material on State coastal land above high-water mark;
(

L(g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

[1 (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

[1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

[1] (iv) none of the above.

 

Operational work below high water
mark

For more information refer to Guide 18. For
more information about prescribed tidal work in
local goverment tidal areas refer to Guide 24.

Unless you answered “none of the above” to
Q10, the application triggers referral to
Queensland Transport (QT) itime Safet
Qld) as a concurrence agency.

Local government is the assessment manager
for afl prescribed tidal work.

  

10. The application involves operational work that is: ( tick the applicable box/es)

L (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; or

CL (ii) tidal work that is prescribed tidal work'4 - complete Part P of Form 1; of
LO (iii) carried out within a coastal management district's under the Coastal Act and for -

(1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1;

(0 (b) reclaiming land under tidal water - complete Part M of Fonm 1; or

LJ (6) constructing a canal'2, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1,

EX] (iv) none of the above.

 

Coastal management

For more information refer to Guide 18.

Unless you answered “none of the above” to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.

 

 

14.

The application involves: (tick the applicable box/es)

(1 (i) a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district's

Di (ii) a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is —
» the construction of a new premises with a GFA'® of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?2

Di (ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

{1 (iv) reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
the construction of a canal’? - complete Part M of Form 1

&] (y)_ none of the above

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tida! work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canai means canal as defined under the Coastat Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

146 GFA Is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to catculated GFA, go to the planning scheme against which the application is being assessed.

17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the applicatlon for the operational works to construct the artificial waterway.

Page 4

Page 11

INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For more information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24.

Hf you answered "YES" to Q12, the application

triggers referral to the Port Authority.

The Part Authority is a concurrence agency if the

development is -

« within 200m of a shipping channel or an entry
and exit shipping corridor for the port

¢ within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

© within 1000m of a planned port facility
identified in a land use plan approved under
the Transport Infrastructure Act 1994.

{n alt other situation the Port Authority is an

advice agency.

iDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark's and within the limits of a port
under the Transport infrastructure Act 1994?

Ne)
(11 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

Marinas

For more information refer to Guide 18. For
information about whether a marina Is prescribed
tidal work refer to Guide 24. The local
govemment is the assessment manager for all
prescribed tidal work.

lf you answered "YES" to Q13, the application

triggers referral to Queensland Fire and Rescue
Service as an advice agency.

 

13.

Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?

&J NO

(YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

 

Tidal works in strategic port land tidal
areas

For more information refer to Guide 18.

Unless you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection

Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.

Heritage
For further information refer to Guide 19.

Ifyou answered “YES" to Q15, the application

triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.

Unless you answered “none of the abave” to
Q15(b), the application involves referral to the

Environmental Protection Agency as an advice
agency for the application

15.

4.

Does the application involve tidal works within a strategic port land tidal area20?
J No

[DYES - complete Part M of Form 1

Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

ENO

(11 YES - complete Part C of Form 1

15{b)The application involves: (tick applicable boxes)

C(i) — amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;

C1 (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
EX] (iii) none of the above.

 

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queensland,
tefer to Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

Hf an agency other than NRW is the assessment
manager for the application, NRWis a
concurrence agency for the application in
relation to this matter.

 

 

16.

The application is in an area declared to be a catchment area under the Wafer Act 2000 and
involves: (tick the applicable box/es)

EI (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
Li (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
Li (ili) none of the above

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations {Maritime Pollution} Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Page 12

INTEGRATED PLANNING ACT 1997

 

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

infrastructure

Applications involving development on land
designated for community infrastucture may
‘trigger this referral.

For more information refer to schedule 2 of the
IP Regulation.

Ifyou answered “YES” to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
If an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.

 

Contaminated land 17. The application involves: (tick the applicable boxes)
Applications involving material change of use (1) reconfiguring a lot for which all of part of the premises are ~
are reaniiguing a ot may Wigger tis (a) premises mentioned in the IPA, schedule 8, part 1, table 2
For more information refer to Guide 5. « item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered ‘none of the above" to « item 6, including the exemption otherwise provided for by paragraph (e); or
17, the appication requires assessment by the « item 7, including the exemption otherwise provided for a mining activity or petroleum
Environmental Protection Agency (EPA). Ifan activity; or
agency other than EPA is the assessment 1
manager for the application, EPA will be a {b) in an area for which an area management advice has been given for unexploded
concurrence agency for the application in ordnance - complete Part N of Form 1
relation to this matter.
(1) (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
EX] (iii) none of the above

Electricity infrastructure 18. The application involves: (tick the applicable boxes)
ror mare information refer to schedule 2of the IP (i) reconfiguring a lot where any part of the lot is -
Une . - subject to an easement in favour of a distribution entity or transmission entity under the

tess you answered ‘none of te above! to Electricity Act 1994 and the easement is for a transmission grid or supply network under
Q18, the application triggers referral to the
agency to which the easement is granted in that Act; or

@ favour of as advice agency. « situated within 100m of a substation site;
Cl (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

« any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

DI (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

Ci (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
any part of the premises is subject to an easement in favour of a distribution entity or

transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;

{1 (v)_ none of the above.

Land designated for community 19. Does the application involve development assessable against the planning scheme and on land

designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
{iii) other than development -

{a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
EX) No
OYes

 

Page 6

Page 13

INTEGRATED PLANNING ACT 1997

SEQ Regional Plan

For more information refer to schedule 2 of the
IP Requtation.

Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule

2 of the Regutatory Provisions for relevant
definitions.

Unless you answered “none of the above” to
Q20, the application requires assessment by the
Office of Urban Management (OUM).

Fisheries matters

For more information refer to schedule 2of the IP
in.

Unless you answered “none of the above” to
Q21, the application requires assessment by the
Oepartment of Primary Industries and Fisheries
(OPI8F).

(fan agency other than DPISF is the assessment
manager for the application, DPI&F is a
concurrence agency for the apptication in
relation to items (i) - {iv) and an advice agency
in relation to item (v).

 

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable box/es) -
CO (i) amaterial change of use of premises —
(a) in a Major Development Area in the Urban Footprint for -
C (i)  anurban activity -
(1s inan area included in a structure plan where the IPA, section 3.1.6
applies;
Cs inan area not included in a structure plan where -
the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
OO (il) intensive animal husbandry, or
C2 (ii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
OO (i) anurban activity and not specified in section 2.4(2); or
C1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for -
OO (i) anurban activity and not specified in section 2.10(2);
CJ (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
C) (ii) intensive animal husbandry

0 (ii) reconfiguring a tot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and

(b) not specified in section 3.1(2).
&

The application involves: (tick the applicable box/es)

{iii) none of the above
21.

LCI (i)_ an assessable material change of use for aquaculture - complete Part O; of Form 1;

(1 (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;

D (iii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;

CD (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

Cv) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

KK] (vi) none of the above.

 

Page 7

Page 14

INTEGRATED PLANNING ACT 1997
integration of land use and public
transport

For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Requlation.
Unless you answered “none of the above*, the
application triggers referral to QT asa
concurrence agency.

 

IDAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—

LI (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

OO (ii) reconfiguring a lot—

(a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;

(1 (b) _ onland that is completely or partly within a future public transport corridor or
an airport's public safety area;

(J (©) _ onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(1 (q@) for aresidential purpose within the 25 ANEF contour for an airport;

Ce) _ for aresidential purpose resulting in 100 or more allotments.

( (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

(a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(J (b) _ will result in work that encroaches into an airport's operational airspace.

{iv) none of the above.

 

 

 

Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
For more information refer to Guide 23, schedule CI (i) a material change of use assessable against the planning scheme for a purpose
BA of the PA & schedule 2 of the IP Requlaton ulation. 0 mentioned in schedule 13D of the IP Regulation and excending the desholde set by that
Unless you answered “none of the above”, the
application triggers referral to QT as a schedule.
concurrence agency. Di (i) reconfiguring a fot—
(a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(1) (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
O(c) _ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
C1 (d) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
Ce) on tand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(J (f for aresidential purpose resulting in 100 or more allotments.
DO (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
(J (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(Db) _ is completely or partly within future railway land, or a railway tunnel easement;
(6) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
EX] (iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to

For more information refer to schedute 2of the iP
Regulation.

Unless you answered “none of the above’, the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum|
Act 1923, currently Santos QNT Pty Ltd, for
advice.

 

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

[1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

CO (i) reconfiguring a lot

CL (iii) operational work assessable against the planning scheme, that is filling, excavation,

compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

(iv) none of the above.

XI

 

Page 8

Page 15

INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedule 2 of the 1P Requlation.

Unless you answered “none of the above”, the
application requires referral to the Environmental
Protection Agency as a concurrence agency.

Wild river area
For more information, refer to Guide 27

If you answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
fiver area because the application cannol be
accepted by the assessment manager.

Preliminary Approval

If you answered YES to Q27, the application
triggers referral to the Department of Local

Goverment, Planning, Sport and Recreation as
an advice agency.

25.

26.

27.

IDAS Assessment Checklist, Version 20, 2 April 2007

The application involves: (tick the applicable box/es)—

L (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in ~
(J (a) clearing of native vegetation over an area greater than 2500m?,

(2 (b}_ anew building and any reasonably associated structure with a total footprint
greater than 1000m2;
(i (c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;

extracting gravel, rock or sand from an area greater than 5000m2;

excavating or filling an area greater than 5000m2;

additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

C1 (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will
result in —

(1 (a) an increased number of lots;
LJ (b) clearing of native vegetation over an area greater than 2500m?.

0 (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

Ci (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in —

(a) clearing of native vegetation over an area greater than 2500m?;
(FD (b) extracting gravel, rock or sand from an area greater than 5000m2;
LJ (c) excavating or filling an area greater than 5000m2.

EX] (vy) none of the above.

Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?

KI No

(C1 yYes

Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the Integrated Planning Act 1997?

Ino
OyYes

 

 

Wetlands

Domestic activity means the construction or use
of a single residence on a tot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretakers residence, granny flat, building or
structure used for a home business.

Note: Wetland is defined in the Integrated
Planning Regulation 1998.

Unless you answered “none of the above” to
Q28, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

28.

The application involves: (tick the applicable boxes) -
LI (i) a material change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
Li) reconfiguring a lot -
In of within 100m of a wetland that will result in
CL (a) more than 10 lots being created; or
LJ (b) lots less than 5 hectares;
(ii) none of the above

Page 9

Page 16

INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Planning Act 1997 as "purposes for which land is
used in cities or towns, including residential,
industrial, sporting, recreation and commercial
purposes, but not including environmental,
conservation, rural, natural or wildemess area
Purposes”.

Unless you answered "none of the above” to
Q29, the application invotves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable box/es)—
LD) (i) a material change of use for urban purposes that is in or within 100m of any of the
following -
CJ (a) aprotected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
(1 (b) a State forest or timber reserve under the Forestry Act 1959;
C1 (c) amarine park under the Marine Parks Act 2004;
[1 @) arecreation area under the Recreation Area Management Act 1988;
(Ce) aworld heritage area listed under the World Heritage Convention;
LJ (Brisbane forest park under the Brisbane Forest Park Act 1977.
D (ii) reconfiguring a lot if -
(J (a) any part of the lot is situated in, or within 100m of, any of the following —
CI(i) — aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
CI (ii) a State forest or timber reserve under the Forestry Act 1959:
(1 (iii) a marine park under the Marine Parks Act 2004;
CL (iv) arecreation area under the Recreation Area Management Act 1988;
(J (v)  aworld heritage area listed under the World Heritage Convention:
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(J (b) ‘the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than Sha;
EX] (iii) none of the above.

 

Page 10

Page 17

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

' SECTION 2 - ASSESSMENT IN A WILD RIVER AREA
(completion mandatory if the proposed development is located in a wild river area)

 

 

Wild River Area

It the responsibility of the applicant to
determine If the development Is proposed in
a wild ever area.

Information about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natura! Resources and Water (NRW), accessing
the department's website www.nrw.qld.qav.au or
contacting the department by emait on:
[email protected]

Note on Referrals

Referrals for development in a wild river area
{other than for agricuttural activities and animal
husbandry activities) are not changed from the
existing referral arrangements.

Notes on development assessable
against the Witd Rivers Code

For information regarding development in a wild
fiver area, see the relevant wild river declaration
and Guide 27. The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Witd Rivers Code, and In some
cases which types of development are exempt
from wild river requirements.

The notes on development assessable against
the Wild Rivers Code In this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area.

Applications for some new developments will not
be accepted if the proposed devetopmentis in a
high preservation area (HPA), Most applications
for develapment activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration.

Which wild river area is the development proposed in?

 

 

 

 

The proposed development is to be located in: (tick the applicable boxes)
(Ji) a high preservation area (HPA);

(J ii) a preservation area (PA) ;

(J ili) a wild river floodplain management area (FMA);

OC iv) a wild river nominated waterway;

(-] v) a designated urban area (DUA).

 

 

Environmentally relevant activities
(ERAs) in a designated urban area

(fyou answered YES, your application for an
ERA Is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.

Ifyou answered NO to Q2, please complete the
temaining questions in Section 2.

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or

ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.

NO CO YES (ensure you have completed Part G of Form 1)

 

 

Clearing native vegetation

If YES, there are a limited number of purposes
for which an apptication to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA.

If YES and you ticked Q4 box i) the application
may be made and is assessable against the Wild
Rivers Code. !f YES and you ticked Q4 box ii)
the application will not be accepted.

Note: If clearing native vegetation is ina PA,
there are no wild river requirements and
provided there are no other aspects of this,
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.

 

Is the application operational work for clearing native vegetation in a HPA?
Xl NO oO YES (ensure you have completed Part J of Form 1)

If YES, is the clearing?

(_] i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

J ii) in a HPA outside a registered area of agriculture?

 

Page 11

Page 18

INTEGRATED PLANNING ACT 1997

Works in tidal areas, coastal
management districts and fish habitat
areas

if you answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.

Hf you answered YES to Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.

Note: f specified works are propased in a local
government area, itis prescribed tidal work - the
relevant local government will be the
assessment manager with the EPA as a
concurrence agency

Ifyou answered YES to Q8, and ticked box ii} or
iil) in Q6, your application requires referral to
DPIF.

(f you answered NO to 5 and ticked box i} in
Q6, the application will not be accepted.

H you answered NO to Q5, ticked box ii) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit Is not required, or if a
fequired permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works ar as described above will
not be accepted.

if you answered NO at QS and ticked box iii) in
Q6, the application may be made i the works are’
inaPA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.

For more information about specified works refer
to Guide 27

Residential, commercial or industrial
development
If you answered YES to Q7, your application is

nat subject to wild river requirements. Provided
there are no other aspects of this development

that require assessment against the relevant wild | g,

iver declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

{f you answered NO to Q7 and ticked either box
i) or ii} in Q8, the assessing agency is the
relevant local government. The application must
be assessed against and must comply with the
Wild Rivers Code.

IDAS Assessment Checklist, Version 20, 2 April 2007
ls the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

NO Clyes

The application is for one or more of the following:

in i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 7); OF

CO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF

| iii) Building or operational works in a fish habitat area (ensure you have completed Part Oz of Form 1),

's the application for residential, commercial or industrial development in a designated urban

area?
CINo & yes

If NO, does the application for residential, commercial or industrial development involve:

(J i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

oO ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

 

 

 

Animal husbandry activities 9. Does the application involve a material change of use for animal husbandry activities (as defined
tfyou answered YES to Q9 your application under the Wild Rivers Act 2005) in a PA?
requires assessment against and must comply
with the Wild Rivers Code. X NO oO YES (ensure you have completed Part R of Form 1}
The assessing agency is NRW.
Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Agricultural activities 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
Ifyou answered YES to Q10, your application a PA?
requires assessment against and must comply
with the Wild Rivers Code. NO O YES (ensure you have completed Part Q of Form 1)
The assessing agency is NRW.
11. If YES is the application for:

Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and a definition of agricuttural activities
see the Wild Rivers Act 2005 and refer to Guide
27.

The production of fodder in a PA, and pasture
improvement using tow impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

(71 i) a material change of use; or
(7 ii) operational works.

 

Page 12

Page 19

INTEGRATED PLANNING ACT 1997
Warks that take overland flow water

The relevant wild river declaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.

If you ticked Q13 3), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked Q13 i) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

If you ticked Q13 ili) your application is not
subject to wild river requirements,

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

13,

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

NO oO YES (ensure you have completed Part Ks of Form 1)

\f YES, is the application for works stated in the relevant wild river declaration to be?
(_] i) assessable works

[J ii) self-assessable works

O iii) exempt works

 

Works that interfere with overland
flow water

The retevant wild river declaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.

It you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

It you ticked Q15 ii) an application is not required
to be made however the works must comply with
the retevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW.
against the relevant part of the Wild Rivers Code
and must comply with the code.

(f you ticked Q15 ii) your application is nat
subject to wild river requirements.

Applications for development thatis other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

Does the application involve works that interfere with overland flow water in a FMA?

i] No

If YES, is the application for works stated in the relevant wild rivers declaration to be?
(J i) assessable works

0 ii) self-assessable works

(J iii) exempt works

a YES (ensure you have completed Part Kio of Form 1)

 

 

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
if you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

16,

Does the application involve building or raising waterway barrier works in a PA?
& NO oO YES (ensure you have completed Part Os of Form 1)

 

 

Aquaculture (non ERA)

Applications for aquaculture in a HPA will not be
accepted.

Ifyou answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Does the application involve aquaculture in a PA?

XI No

ClyYes (ensure you have completed Part O: of Form 1)

 

 

 

Works that interfere with water in a
watercourse

Note: If the devefopment is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepted.

tn a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
If you ticked box ji) in Q19, your application will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and focations of nominated
waterways is available by contact NRW,
accessing the department's website
www. now. qid.gov.au ar contacting the
department by email on:

wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

&] No

If YES,
O i) The application is for an instream dam or weir; or

oO il) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

O YES (ensure you have completed the relevant Part K of Form 1)

Page 13

Page 20

INTEGRATED PLANNING ACT 1997
Environmentally retevant activities

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
require referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local government (see EPA website for more
information on devolved ERAs)

Ifyou answered NO to Q20 you do not need to
complete Qs 21-24.

Ifyou answered YES to Q20 and the
development is In a PA, your application must be
assessed by the administering authority?"
against the Wild Rivers Code and must comply
with the code, unless the proposal is for
development where an application will not be
accepted, or is exempt from wild river
requirements (see Q2). You will be able to
determine if an application will not be accepted
for the development by answering Q21 - Q24.

If you answered NO to Q21, you do not need to
complete Q22. If you answered YES to Q21 you
are required to complete 022.

If you answered NO to Q22, the application will
not be accepted. If you answered YES to Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.

\f you answered NO to Q23 and the development’
is proposed in the HPA the application will not be
accepted. If you answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code,

If you answered YES to Q24 the application will
not be accepted. If you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code,

Exempt ERAs in a designated urban
area

If the development is proposed in a designated
urban area there may be no wild river
fequirements. See Section 2 Q2.

Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area).

20.

22.

23.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA?

NO oO YES (ensure you have completed Part G of Form)
ls the application for an ERA 20 instream?

Xl No Lyes

Is a quarry allocation notice held for the proposed ERA 20 instream?
no Ll Yes

Does the application involve any of the following in a HPA?

i) a level 2 ERA 11, (and is for specified works or a residential complex)

ii) an ERA 19 (dredging)

iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)

{XJ No Dyes
Is the proposed development for ERA 20 (out of stream) and;
— inaFMA; and

— notlow impact; and
— not for a residential complex in the area, or for specified works.

XI No Clyes

 

Documentation

If you answered NO to 025, your apptication
may be subject to an information request and
processing of the application may be delayed.

25.

 

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?

I No ClyYes

 

 

2 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.

Page 14

Page 21

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

°

SECTION 3 — BUILDING REFERRALS (completion not mandatory)

 

 

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice onty. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special fire services - generally 1.

For more information go to schedule 2 table 1 and
schedule 2A of the IP Regulation.

Assessment period 15 days. No sesponse is a
deemed refusal.

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Building Code of Australia.

 

Fire safety for budget accommodation | 2.
For more information go to schedute 2 of the iP
Regulation

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.

 

Spray painting 3.
For more information go to schedule 2 of the iP
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.

 

Retail meat premises 4.
For more information go to schedule 2 af the IP
Regulation

An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
Tetail meat premises.

 

Private health facitities 5.
For more Information go to schedule 2 of the IP
Requiation

An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.

 

Workplace area less than 2.3m2 6.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m?.

 

Land contiguous to a State-controlled | 7.
road

For more information go to schedule 2 of the IP
Requlation

An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road.

 

Pastoral workers accommodation 8.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation.

 

Child care centre 9,
For more Information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.

 

Coastal development 10.

For more information go to schedule 2 of the {P
Regulation

An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves land completely or partly seaward of a coastal building line22,

 

Heritage 11.

For more information go to schedute 2 of the IP
Regulation

An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.

 

Fisheries matters 12.

For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.

 

Integration of land use and public 13.

transport
For more information go to schedule 2 of the IP.
Regulation

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace”,

 

 

Railway safety and efficiency 14.

For more information go to schedule 2 of the IP
Regulation

 

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.

 

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For ail
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal, However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no

response is taken to be a deemed approval.

 

 

Amenity and aesthetic impact of 15.

particular building work for single
detached class 4 building or class 10
building or structure

For more information go to schedule 2 table 1 of tha
IP Regulation,

Assessment period 15 days. No response is a
deemed approval.

 

An application will trigger a referral to the local government if it is :
e forasingle detached class 1 building or class 10 structure; and
«the local government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality.

 

 

2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
23) Operational airspace is as defined in State Planning Policy 1/02 “Devetopment in the Vicinity of Certain Airports and Aviation Facilities".

Page 15

Page 22

.

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

 

 

 

 

Whether particular buildings maybe | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a

occupied for residential purposes teferral to the local government as the concurrence agency.

For more information go to schedute 2 table 1 of the

IP Regulation.

Assessment period 15 days. No response is 2

deemed refusal,

Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work

For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

'P Requiation. 18. An application may trigger referral to the local government as the concurrence agency if the building work

Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.

Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has

For more information go to schedule 2 table 1 of the been completed.

IP Requtation.

Assessment period 15 days. No response is a

deemed refusal.

Higher risk personal appearance 21, An application may trigger referral to the local government as the concurrence agency to determine if the

services building work

For more Information go to schedute 2 table 1 of the * complies with the performance criteria of the Queensland Development code part 15; and

1e Regulation and the QDC part 15. ¢ the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a

deemed refusal.

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential

For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

{P Requlation and the QDC part 20. referral to the local government as the concurrence agency.

Assessment period 15 days. No response is a

deemed refusal.

Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger

rebuilding referral to the local government as the concurrence agency.

For mare information go to schedute 2 table 1 of the

(P Regulation.

Assessment period 5 days. No response is a

deemed refusal.

Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the

designated rainwater tank area
For more information go to schedule 2 table 1 of the
IP Regulation and the QDC part 25.

Assessment period 15 days, No response is a
deemed refusal.

 

building work or structure complies with the relevant performance criteria if -

e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

e Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

Page 16

 

Page 23

 

 

IA nee LAND USE SECTION FEES
Noa :

RECEIPT TYPE

 

 

 

 

 

SALE OF DOCUMENTS .
Superseded Planning Scheme‘Documentation ~ . 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
APPLICATION FEES
: Material Change of Use - Code/Impact ;
Consistent 5217
Inconsistent 521
- Assessment under Superseded Planning Scheme . _ 521
Modification to a Development Permit . . §21
Extension of a Currency Period : . §21
Operational Works - Landscaping : {o7s §2+
Bldg Work assessable against the Planning Scheme 521
pre Mocement REVIEW
Half Hour 522 |
One Hour , 522
ADVERTISING
Purchase Advertised Applications 523
JETTIES
Jetty Application Fee 524
Jetty Bond $1
: (Category 4)
BONDS :
Performance Bond . 51
(Category 9)
SIGNS .
Registration Fee ‘ : oe 222
Ss >H FEE . /
Search of Land Use Section file 112
Liquor Licensing Request 113.
. “TOTAL. $ (O75
NAME: Ker _ Biter ig Argaco oh S$
ADDRESS: 1¢/Z, Ap bn Wey
_ " Bspowa usar 7
FILENO: —§ OT] (QQR pate: 2(re fe?

 

 

‘RECEIPTNO: | 2V¥/6(9 signature of TP Officer: / " -
AUTHORITY NO: ; —

b¢/2==7] 493 / |

Page 24

90P'S334 LNSNdO TAASO/SNOLINGIELNOD 8 S3z4fuauxdjanag pueryid

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sa3eq Jdlol0y ; ©ON }d19990y |

tepew Ayodoid uojje5)\dde o3eg . Ss 4 , $ (spuog Buypnjoul) pled seat Jo 1304
(6189) 1s __ puog SoM paraKdwooupyeoueue}UIEWyeoUeWWOpag/siisodag AuNoag
199U919j9y 10 SIOQUINN [I4 | AdAL LdiaO3y LNNOWV : ; :0}eq 1dd
‘SY meoneooy yuewdojeseg $ (spuog Bulpnjox3) pled sea jo [2304
98S (dS) Aemuped - $91
ees 6S @Sn Way) passyua JOU Wg J (AOINYIND) PeOy - SOI
18s (eagg prem 8 J91SeW aIIAeSOON gSd) abeuresG - Sor
issouppy 6SS (842g dSd) puey uojealoey pue pods - $91
; _ souleN eked v9 (asd) Aiddng se9eM - SOI
— STIVLAG NOILVOIddv 199 (KyooreW Sq) uelbaleg wnog - eBerames - $9]
€19 (1e1s209 Sq) aBeemag - SOI
iuoRoeS/PpEeoN Zss (Riny dSd) eBeramag - $91
19S wodsuel) a1Gnd - Sol
SUSUYDIED 09s (aanoe Aquaune Jon) puey AyuNWWOD - $9}
_ SNOLLNSIILNOS SMHOMAVON gs Ajunuwo pue seg Jay19 — YOgnguauo sadojanaq
ggg (Bupped se9 ¢haSd) Suredis HO nen UI — “quAUED Jedojanag
uo EiNIjeD Uo}Zsedsu] Seo dSd uey Jao Aemyjeg— uoRNguyUDD Jadojaneg
ss dSd uey J8u1Q aBeuresg ~ uoRNguyUOD Jadojanag
. €SS "Sq uely seu1O peoy — uOANALRUO| Jsedojaneq
oss Burdeospue) — uognququos sadojaneg
vope Nae Uo}eujwexy ueld | adALidiz2ay | IJNNOWY | _CSSNOILNGTNLNOD
6rS 9a4 Bunaay juawebpoparg
88s uogoadsuy AL TINUID Paso1g
UO}Ze/NDjed 307 Ob (SOM pajajdwooun ‘suogngujuoy) da4 uupy Guipuog
a a aa __..___ SNOILVINDIV9° Sts: OSI ‘S}SI7 Adljod ‘sjuaundog Jo aes
es sjuawinoog je6e7 ‘sue|g Aenng - 994 Buyeas
ers uogeulwex3 Juewnoog jehe7
zys och uogoadsu| pia14 eBeureig / peo
issosppy Ws Shit wex3 ue|g sbeureiq / peoy
soweTN eohkeg Ors $9944 uoneoyddy

> ..____ SH®}0q@ punjoy puog - saNOg | gaa LaIa9au | LNAOWY $334 -IWH3NA9 GNV NOLLVOMddv

 

 

 

 

(Quauidojaneg ‘s201yQ UILIpY 0} wnjPeaic yatysed)
SNOILNGINLNOS 8 S334 LNSWdOT3A20

1

VSOON

  

 

 

a

Page 25

 

Phone: 5444 0430

KAWANAIBUIEDINGIARPROVALES

 

 

Fax: 5444 0429 Email: [email protected]

Professional Building Certifiers

Licenced Building Certifier No A927431_ Licensed Builder No 32253

A.B.N. 56 032 875 811 A.C.N. 118 768 568

oy omen

 

To: -

Noosa Shire Council
PO Box 141
Tewantin Qld 4565

 

07-527
00002967

27/09/2007

Permit #
Order #
Date

 

 

 

ZS eS
dx

Receved

-~ ° PST anny

    
  
 

   
 

Operational Works Application

Type of Work: Duplex Unit
Owner: M. & J. Exley
Site Address: 21 Grant St, Noosa Heads.

Property Description: Lot 9 SP 179879 NOOSA SHIRE COUNCIL

 

Details

Operational Works Permit

 

Amount Tax

$2,690.00 N-T

 

 

 

 

 

Total (ine-GST); $2,690.00

 

 

 

 

Please use the credit card authority below for the amount of Total Inc GST plus credit card processing fee if applicable.

 

Credit Card Authority

Cardhoiders Name:
Card #:

Expiry Date:

Card Type:

 

|
|
|
|
|
|
t
|

 

Authorised

 

 

 

 

Page 26

land Developme? «
RWANAIBUITDINGIARRROVAIS

 

 

 

 

 

 

Phone: 5444 0430 Fax: 5444 0429 Email: [email protected]

Professional Building Certifiers
Licenced Building Certifier No A927431 Licensed Builder No 32253
A.B.N. 56 032 875 811 A.C.N. 118 768 568

 

 

 

 

 

 

 

 

 

 

Order
f
To: Noosa Shire Council ‘Permit # 07-526
loosa Shire Counci
PO Box 141 Order # 00002968
Tewantin Qld 4565 Date 27/09/2007
|
Operational Works Application
Type of Work: Duplex Unit
Owner: M. & J. Exley
Site Address: 19 Grant St, Noosa Heads.
Property Description: Lot 10 SP 179879 ¢ 2690
Details Amount Tax
Operational Works Permit $2,405.00 N-T
Total (inc-GST): $2,405.00

 

 

 

Please use the credit card authority below for the amount of Total Inc GST plus credit card processing fee if applicable.

Credit Card Authority

Cardholders Name: Megan Kennedy-Lusio
Card #: 5240 6600 0000 7203
Expiry Date: 03/08

Card Type: Mastercard (Bank of Qld)

Authorised

 

 

 

Page 27

 

 

 

 

> TELECM PIT

le LIGHT POLE

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
      

 

 

 

 

 

 

 

     
  
 

  
       
 

   
  
   

 
   

         

   

  
 

  

 

 

   
 

    

    
 
   

  

 

 

O) 6) becom BOX
SITE NOTES:
RPD
8 LOT 10 ON SP179879
oO PARISH OF WAVER
© COUNTY OF MARCH
~
lu
Lu SoA curvey poge are tobe efed in
Y position Brior to the commencement of
5 2. The dwelling is not to exceed &m
above the natural ground line.
5 San De Sra a
= 4. LANDSCAPING. The site is to be
BS cng aren
R REPORT and CSIRO recommendations
Ta al eine wo el
2 = A 0 q A GAP A wares R g ,
Snr z es L ph — : : _—= 5. Stormwater to on-site water storage
g OW MV VAG VV tanks ox per Hycaule Engineer's den
| MN \ | mace
DECK POST. ~~ 4 ai Kp RORY | OS pee 3 eower suthorty
8 Acoma | LOCATION 8. All dimensions are in milimetres
8 8 yi 7, SAP Rr 23 75) VE . UN.O.
. 8 YOUDEG\ T | SSReainR SAY te
3s 8 RR RATED Ban TION SS : NaN TI N NX SS NEF i ev e ae DISCHARGE STORMWATER AS
S GSES ARIS — reece
SROs By \NECza \ Ny peRRACE bn a Bal \ Si PROPOSED x SCHEDULE OF SITE AREAS
Ss SK SAN \% wy SEU Sa \. | —— LOCATION AREA LOT 10
DECK POST 4 —————— b x NS , Ww XS Yah y XY Y Q {A f 8 [corto
XO QY BAN SAL g
= SSSR RRNA
— TA SS : ‘ gor ae
i ae + | ae ieger=
J | © FB] | vascapnel || || bode 5

 

LINE OF BUILDING UNDER

LETTERBOX &
CROSSOVER
MAIN STRUCTURE

 

 

 

% % \
s gs pgpees sta
g ge @ & 8
4 4a7tt } 2600 5800 f st 4400 } 4800 }
AMENDMENTS
2 27.08.07 —_ Raised carport slab RL
x & added 400mm setp in slab
a Updated driveway profile
EXISTING TREES TO BER REMOVED. 19.09.07 Moved Unit 800mm towards rear

Raise Unit 200mm and lower
carport sla :
Updated driveway profile.

Southern Cross fe)l 3 =
have be red for Building Permit applicati ly. It is the Builders/ iil wn:
Des | gn & Drafti Ng tarot en prepared for Building erat application ony is the ui jownars responsibility =

the design and drawings to detail the p r construct:
tions of servicas, dimensi if to. con Matthew & Joanne Exiey

 

   

Commercial * Industrial * residenti . hall verify all local , dimensions and levels prio ‘struction.
Suite/ ‘4 80 Sixth Ave Maroochydore buitding designers’ it dimensions on site shail be confirmed by builder before commencement of construction and ordering. LOT NUMBER: ai
Ph: 5479 5313 Fax: 5479 5314 association of end satout if ni to comply with council by-laws and setback distances. STREET:
A Lic 1110414 queensiand Inc. During const the building shall be maintained in a stable condition and no part shall be overstressed.
Member

 

 

 

ARCHITECTURAL

Page 28

 

       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

         

      

 

 

 

 

 

 

 

 

 

 

 

     

      

 

 

 

 

 

                    

 

  

   
 

 
  
  

  

      

  

 

 

     

      

         

 

 

 

 

 

 

 

 

 

 

 

 

 

   

_—
_—
_—
=
—
— 2
= = é
g 2 g
S — oa
a —
550 o/hang __ ——
‘ : 1800 o/hang —
_ — 600 of/hang
— I
ALUMINIUM FRAMED WINDOWS COLORBOND CUSTOM ORB TIMBER PURLINS AND RAFTERS TT
AND DOORS FIXED TO ROOF SHEETING TO MANUF. @ 900 CRS TO ENGINEERS —
MANUFACTURER'S SPEC AND SPEC FIXED TO N3 DESIGN AND DETAIL. ee —
N3 RATING NON-CYCLONIC RATING PBD LINING TO U/SIDE OF _— _——
HWD RAFTERS - SEALED AND RAFTERS —~ ——_ }<—_—_————_ HWD RAFTERS - COLORBOND CUSTOM ORB
PAINTED WHERE EXPOSED _— I SEALED AND PAINTED ROOF SHEETING TO MANUF.
| proH " NON-CYCLONIG RATING
— re GRANT STREET
So p>
_| YO INERT™ — 3 | et ae : = ee m, me “a Sey : - - -
| | UNIT 2 on Ss °RART 250mm GRATED DRAIN
DINING 7 CONCRETE
| i DRIVEWAY RL 24.678 fi. 24.728 RL 24.691 wa 20.564
K ul iif uf 1000mm GLAZED RL 24.558 °
| | | BALUSTRADE : ~~ KR SS 1
8 TIMBER FRAMED FLOORS WS? x ~~ SSS Sy XY Sy» SS y
SL
UPPER FLOOR @ RL 23.84 | | Ht S| || Tosxonesssos “s y a CRORE RSLS h ARK
“CEILING b— , PTITIILILIITITiTiiii ce C/N BRR S08 ORL.
His DPC UNDER TIMBER \
JOINERY | fonneue Crh ING —<. » » ” 190mm RC BLOCK RETAINING
~ | 7 LINING UNDER SLAB whe ay” \ R WALLS ‘AND FOOTINGS TO
- uw Ly » ENGINEERS DETAILS.
ve RC BLOCK WALL TO : AE YY AG. DRAINAGE PPE MIN, 100mm
| a ENGINEERS DESIGN : < Mee KS
: oe CRY RRR
| el Ae BED 2 eS eee SOY WYAYAS
2) ft. meme aa et es US
3 Bs MBER ERAME NC DPC TO MANUF. ——— Sin ITS Sy SUSPENDED RC SLAB TO
LOWER FLOOR @ RL 20.94 We vs SPECIFICATIONS —— VA Yi Keekhek ? ENGINEERS DESIGN AND
~ _ = F SV DETAIL
| ee “ oN *@ RL 20.89
RC SLAB, BLOCK RETAINING WALL
AND FOOTING TO ENGINEERS DESIGN
HWD TIMBER DECK WITH HWD
SHOTEDGE DECKING AS PER A DRAINAGE PIPE, MIN. 100mm

    

 

    

       

NEIGHBOUR FENCING . pea E 3 een wel = ° < 5
Le SRROKGRRREEREA
NGL AT SECTION , N YY, SSI6ON NPNYS 75 x 75 SHS POST
RR FOG Si 7 oH)

YI x -_

:

LS

KX SCA ee
FIRE RATED PARTITION WALL RC FOOTING STO ENGINEERS
TO MIN. FRL 60/60/60. DESIGN AND DETAIL.
SELECT CR FINISH

SECTION A-A - TYPICAL

SCALE 1:50

  

   

% Southern Cross
Design & Drafting

Commercial * Industrial * residenti

Suite/4 80 Sixth Ave Maroochydore
Ph: 5479 5313 Fax: 5479 5314
QBSA Lic 1110414

90 X 19mm SHOTEDGE HWD
TIMBER BATTENS BETWEEN
BLOCK WALLS

AMENDMENTS

27.08.07

19.09.07

Notes:

These drawings have been prepared for Building Permit application only. It is the Builders/owners responsibility
to further interpret the design and drawings to detail the project for construction.

Builder shall verify all locations of services, dimensions and levels prior to construction.

Setout dimensions on site shal) be confirmed 1" before commencement of construction and ordering.
Amend setout if necessary to comply with council by-laws and setback distances.

During construction the building shall ba maintained in a stable condition and no part shall ba overstressed.

CLIENT:
LOT NUMBER:

SUBURB:

 

PROJECT INFORMATION

PROJECT TYPE: RESIDENTIAL

Raised carport slab RL

& added 400mm step in slab.
Updated driveway profile
Moved Unit 800mm towards rear
boundary.

Raise Unit 200mm and lower
carport slab 172mm.

Updated driveway profile.
Changed truss roof to rafter
and puriins with raked ceiling.
Changed wall between Bed 2 &
Terrace from timber frame to
RC block.

 

 

Page 29

 

 

 

 

 

P1 PI Pt

     

 

 

 

 

    

mF

   

 

 

 

 

 

 

 

 

 

 

REFER ENGINEER'S
DETAILS Me

 

RC BLOCK PARTITION WALL ai

REFER ENGINEER'S

 

DETAILS
FRAMING PLAN - TYPICAL ROOF
SCALE 1:100
NOTE: UNIT 2 MIRRORED
REFER
ENGINEER'S RC BLOCK WALL TO ENGINEERS
— DESIGN AND DETAIL

DETAILS ——-— |

 

    

 

 

 

 

 

 

 

     
 

3]
See

uit
nu

 

 
 

 

  
   

REFER ENGINEER'S —x
DETAILS “=

FRAMING PLAN - TYPICAL FLOOR

 

SCALE 1:100
NOTE: UNIT 2 MIRRORED

 
  
   
 
  

RIMBOARD TO ENDS OF
CANTILEVERED FLOOR JOISTS.
REFER ENGINEER'S DETAILS.

P®D LINING TO BLOCK WALL

  
 
 

 

CARPET FLOOR AS
PER BUILDER'S
| CONTRACT
/ LOWER FLOOR
/ | @Ri 20.94
\TERRACE/ HYNE I-BEAM FLOOR

JOISTS @ 450crs

   
  
 

 
   

RC BLOCK
RETAINING WALL
™~
“

 

 

 

 

 

FRAMING SCHEDULE LEGEND

 
 
 
   
 

BT1 F14HWD ROOF BATTENS @ 900CRS P2 75x 75mm SHS
CB1 F14 HWD CARPORT BEAM OR SIMILAR PP1 F14 HWD POLE PLATE
DJ1 F14 HWOD DECK JOISTS @ 450CRS R1  F14 HWD TIMBER RAFTER @ 900CRS
FB1 FLOOR BEARER TO OR SIMILAR
Rimboard ENGINEER'S DETAIL R2 TIMBER RAFTERS @ 900CRS
ear FJ1 HYNE i-BEAM FLOOR JOISTS TO ENGINEER'S DETAIL
450CRS R3 _F14 HWD TIMBER RAFTER @ 900CRS
Flooring to be continuous over top edge of Lt F17 KD HWO TIMBER LINTEL R4  HYNE |-BEAM RAFTERS @ 900CRS
Rimooard and juncior otiom wal Coon se L2  BESSER LINTEL BLOCK RB1 F14 HWD ROOF BEAM OR SIMILAR
the rimboard orion to fixing the eoring Nail P41 100 x 100 F14 HWD RB2 CAMBER ROOF BEAM TO

foeach pand bettas ee VB1_ F14 HWD VERANDAH BEAM OR SIMILAR

17mm F11 Ply Rimboard for
full depth of Hyne-l-Beams. REFER TO STRUCTURAL ENGINEERS DWGS & SPEC

FOR FURTHER STRUCTURAL DETAIL

Bottom edge of rimboard to be
skew nailed to lower wali plate or
HYNE-1-BEAM bearer at 200mm centres. Use
Joists 75x3.15mm nails.

STUDS AT SIDES OF OPENINGS
2400 HIGH CEILING
Fog comer supported inboard wih ings RACH SIDE.

WIDTH OF

storey frame may be sized as fulty supported. OPENING

 

 

900 1
1200 2
TYPICAL RIMBOARD DETAIL tenn ;
1800 2
N.T.S. 2100 2
REFER DESIGN-IN-HYNE DETAILS 2400 3
2700 3
3000 3
3600 3
48000 4
TIMBER SCHEDULE
N OT E Ss TOP PLATES EXTERNAL 1/35x70 + 1/45x70 MGP12
INTERNAL 35x70 MGP10
STRUCTURAL DESIGN BASED UPON STUDS EXTERNAL & 70x35 MGP12 @ 450 CRS
NON-CYCLONIC N3 FOR WIND SPEEDS TO 41 mis. INTERNAL
FOR FURTHER STRUCTURAL & FOOTING DETAILS BOTTOM PLATE 35x70 MGP12 - ONLY IF SOLID BLOCKED BELOW
REFER STRUCTURAL ENGINEERS REPORT. OTHERWISE 45x70 MGP12
WHERE NO LINTEL SPECIFIED OVER OPENING
MINIMUM 90 x 35 F17 APPLIES.
WHERE GIRDER TRUSSES OR OTHER
POINT LOADS ARE TO BE SUPPORTED TERMITE PROTECTION.

AS PER AUSTRALIAN STANDARDS AS3660. 1/2000

OVER LINTELS & VERANDAH PLATES
SIZES ARE TO BE CONFIRMED BY A
STRUCTURAL ENGINEER PRIORTO
CONSTRUCTION & PLANS AMENDED
ACCORDINGLY

NOTE:

FOR BRACING, TIE-DOWN AND
FURTHER TIMBER SCHEDULE

 

DETAILS REFER STRUCTURAL
ENGINEER'S SPECIFICATION
AND DESIGN

 

SELECT CR FINISH TO BLOCK WALL

 
    

 
    
 
      
   

100x100mm HWD POST 75x 75 SHS POST

TOP OF FOOTING SLOPED
AWAY FROM POST

TERRACE SLAB @ RL 20.89 ‘ OUND

OPC TO MANUF. SPECIFICATIONS

   

GROUND
a" X
HOT DIP GALVANISED
STIRRUP CONCRETE PAD

RC SLAB AND BLOCK RETAINING FOOTING

MIN 20MPa MASS

 

 

 

g
E|
5 - i | F144 HWD POLE PLATE FIXED TO mo DESIGN CONCRETE FOOTING.
_ : = eo) \ j WALL TO ENGINEERS DETAIL AG. DRAINAGE PIPE. MIN. K AS PER AS 3660
pie oe He | I | jexamussie \ necREENTE BCR WT A ss
“Tc dy ‘\ nesogTis suoneers SSIKIS
REFER ENGINEER'S —ix& : ey I 7 4 OY,
DETAILS RG BLOCK PARTITION WALL y SS SIS TYPE P1
FRAMING PLAN - TYPICAL SUB FLOOR DETAIL SECTION POST FOOTING DETAILS
SCALE 1:100 SCALE 1:20 SCALE 1:20
. . . AMENDMENTS
NOTE: UNIT 2 MIRRORED For further detail & information refer engineers spec 19.09.07 Raise Unit 200mm.

Southern Cross
Design & Drafting

Commercial * Industrial * residenti

Suite/4 80 Sixth Ave Maroochydore
Ph: 5479 5313 Fax: 5479 5314
QBSA Lic 1110414

 

 

 

 

Changed truss roof to rafter

and purlins with raked ceiling.

Changed wall and lintels
tween Bed 2 & Terrace from

timber frame to RC block.

Amend framing and

timber schedule.

SL
PROJECT TYPE: Signod:
igned:
[ CuENT: | | Matthew & Joanne Exiey | & Joanne Exley

These drawings have been prepared for Building Permit application Only. It is the Builders/owners responsibility
to further interpret the design and drawings to detail the project for construction.

Builder shail verify all locations of services, dimensions and levels prior to construction

Setout dimensions on site shall be confirmed by builder before commencement of construction and ordering. LOT NUMBER: 10 Date: 19/9/07

Amend setout if necessary to comply with council by-laws and setback distances. STREET: Grant St Scale: As Shown A1 | 6of8

During construction the building shall be maintained in a stable condition and no part shall be overstressed. ‘SUBURB:

 

Member

 

 

 

 

Page 30

 

 

 

 

 

 

 

 

  
 
  
  
 
 
  
 
 

 

      
     
         
   
    

    

   
  

 

  
 

  
 

 

 
  
 
  

 

 

  
  
   

  

   
 
   

  

  
  

 

  
  

 

 

   
   

 

 
  

 
 

 

 

 

 

 

 

 
   

     
 

     
 
 
  

 
   

 

  

 

 

    

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 
    
     

 

     
  
  
 

      

      
 

   
  

  
    

     
 

 

 
 

 

      
 

 
        

       

     
    
   
   
 

  
  
  
  

   
   

 
  
   
   
   

 
             
     
   

 
   
 

   

          
     
  
   

  
 
 

    
  
 

   
 
  
     

   
   
    

 

 

 

    
 
 

 

 

 

 

 

 

 

 

  

 

   

 

 

 

 
 

 

      

    

 

 

 

 

 

 

 

 

   
 

 

 

.- . 24200 .
2600 DECK . 10800 . - - . 10800 - ”
2600 DECK 300 + 4000 _ 3000 . S00 CARPORT . _. 5000 WALEOR BIN stone % B
“ 100 2500 70 3730 LIVING 70 3860 KITCHEN 70 2930 DINING 70 [1/100 2750 2750 100 5000 TIMBER BATTEN oa
KE t t ENCLOSURE AS REQUIRED e
n 100 2500 70 3730 LIVING 70 6860 KITCHEN/DINING 70 00 2750 2750 $00 {1 600 ___ 4400 . &
3
a RS a
3s REFER WINDOW we g Cc A
Ww SHADE (ory 90 X 19mm SHOTEOGE HWD. A Oo
a TIMBER BATTENS TO POSTS e s| 3
Se ee a te 0 . - ah ar Se Be D
o c REFER WINDOW TTTT RII \ ae
gz & si 8 SHADE ¥ _ = . > = 3
4 of Belt Hr ST ed cox coup | | BIN s =
Fe j Se | | ea ~ 100 x eI
g haa 7 = TIMBER POSTS z| | STORE 5 Ly E LEVAT | ONS
a 2 ie a &
a = io 2
+~ | | =| 8
_ i‘ CARPORT al 1:20 RISE g| § NOTES:
be 3 2 é 100 x 100 HWD CONCRETE a 2g z
= al gl oS TIMBER POSTS oO 2 STAIRS TO COMPLY WITH BCA 3.9.1.3 AND 3.9.1.4
4 at Q 5
Zz x | = = E iL ZI HANDRAILS AND BALUSTRADES TO
> g | a 2 | 100x100Hwo AS — 5 COMPLY WITH 3.9.2.3 (QLD)
S ahr 3 5 TIMBER POSTS % 3 8 (MIN 1000 HIGH AND 125 BETWEEN RAILS)
, J |" STITT TPS) parton : 3 as ROOF WATER TO BE DISCHARGED TO
* ee LENS) vate ane CONCRETE oP -SITE WATER STORAGE TANKS
\ 4 WALL MIN. FRL = 8 ON-SITI GE TAI
8 idactatd dd add \ DRIVEWAY . a AS PER HYDRAULIC ENGINEERS
=
2 rt! | Wd @ NS
5 (AN SS 5 {AN STRUCTURAL DESIGN BASED UPON
x z Ka) PRD LINING TO TX. 8 5 RC BLOCK WALL, U4 g NON-CYCLONIC N3 FOR WIND SPEEDS
a o| 3 PARTY WALL- “2 100 x 100 HWD OFF SLAB a 2 TO 41 mis.
N ast 2 & = 5 TIMBER POSTS 2
gi“ | 3) 5 Z. 2 si = S z
E «| 3 100 x 100 Hw 3 =~ DINING A z ALL WATER CLOSET DOORS TO HAVE
z 2| 8 & 100 x 00 HWD_ s 5 CARPORT 1:20 RISE gz LIFT OFF HINGES
> 3 s - 2 ] CONCRETE = R INEERS
t : eran Ai Ree NEY
s| & fw) zg WITH B8.C.A. 3.8.1 LINE U/SIDE OF
: oer —: = = 100 x 100 HWD BIN ope EXTERNAL COVERED AREAS WITH F/C
2} & Oy Pr TIMBER POSTS: STORE SHEETING.
Tet Dy :
al 3 7] a REFER WINDOW ~ iW ion Line of beam any YY MS a 5 SMOKE ALARM
ae a te SHADE — @ aoe $s ~ x ah ab SMOKE ALARMS TO BE INSTALLED IN
@ REFER WiINROW ——  90X 19mm SHOTEDGE HWD =| & = ST Se SORGANCE WITH BCA ig 996 CLAUSE
oO SHADE (01 TIMBER BATTENS TO POSTS Ry 2 7.2.
8 SP, - a WITH AS 3786
Mp
S 100 me 3730 LIVING 70 6860 KITCHEN/DINING 70 [1300 2750 i 2750 100 SO}. 4400 —_ 2
i bE HATCHINGS AND FITTINGS ARE INDICATIVE
rt 3730 LIVING 70 3860 KITCHEN 70 2930 DINING _70 |1500 2750. 100 270 100 5000 CONCRETE PAD ock w
a 3800 4000 _ 3000 sano chkport 5000 WALLEOR BI STORE 9 ONLY. REFER BUILDERS SPECIFICATION
: TIMBER BATTEN ow
~ 19800 . . ‘ ENCLOSURE AS REQUIRED < TERMITE PROTECTION:
U P P E R F LO O R P LAN t ~ an # ° AS PER AUSTRALIAN STANDARDS AS3660.1/2000
SCALE 1:100 ano SCHEDULE OF FLOOR AREAS
3190 0 I
2600 DECK 11600 rt 681 UNIT 1
2300 DECK ion 7 oo) a0 a 0 LOWER FLOOR LIVING: 64.92 sq/m
400 2500-70 2660 To}, 1000 1890 BATH “ i 03130 BED 2 1860 750 901810 | L190 4620 190 LOWER FLOOR OUTDOOR: —_30.80 sq/m
100 2500 70 3480 BED 1 70 2 LORY [70 2830 70 3130 BED 2 2810 TE! 3 A90 6620 490 UPPER FLOOR LIVING: 57.05 sq/m
n 3500 UPPER FLOOR OUTDOOR: 10.40 sq/m
2 ‘0 90 X 19mm SHOTEDGE HWD CARPORT/ENTRY: 39.44 sq/m
9 STAIR POSTS 1904-2400 __j. 00 300 TIMBER BATTENS TO POSTS SUB TOTAL: 202.61 Sq.m
x 400 x 100 HWD
6 REFER WINDOW REFER WINDOW UNIT 2
w SHADE (045 SHADE TIMBER POSTS .
a eH Ce UNE OF STRUCTURE OVER “~ 8 LOWER FLOOR LIVING: 64.92 sq/m
Ae ee — AS CESTRUCTURE OVE + DOOR SCHEDULE LOWER FLOOR OUTDOOR: 30.80 sq/m
PPER FLOOR LIVING:
a § g kK ff a \ S & A NO.___SiZE TYPE UPPER FLOOR OUTDOOR: 10.40 sam
++ Pla 4 a z SELECTED TIMBER FRAME CARPORT/ENTRY: 39.44 sq/m
RE 2 \ 3S g FEATURE DOOR SUB TOTAL: 202.61 Sq.m
~~ x & 2 5 2 : .! iq.
ed af 5 84h \ 3 'b2 [21724 | SLIDING GLASS DOOR ra
a8 é sie e209 : SSE
- +F g aep2 8 2 se GARDEN \ [D3 | cos SOLID CORE Wi-GLAZING PANE | 2 _| TOTALFA 405.22 sqm
eE 3 | (2 100 x 100 HWD CARPET 2p 22 3 \ [04 | 214 | vnyesuber
bE a + 100100 WO, veer $e 225 Pos [920 [Houtow core ca
< a | 88 a bie | D6 | 720 | HOLLOWCORETOSUITTOP._[2 |
2 3 ary § Plo 7 & 90 x 19mm SHOTEDGE 770 HOLLOW CORE [2 i
= HWD TIMBER BATTENS j
wl i ae | BETWEENeLocK Was f) 22 | Ds | s20cs HOLLOW CORE CAVITY SLIDER [2 |
> a LINE U/SIDE OF SIR PRD LINING T fost TOOHWD TIMBER NN = i foo | 21/15 VINYL SLIDER
2 CHENG TO au a BOTn Slbes 20 | O10 [770 | HOLLOW CORE To SUIT OP
Fy & CEILING TO SUIT Maw BOTH SIDES Zz & 3 LIDING GLASS DOOR
3 < 5 | Dit | | SLIDINGGLASSDOOR si GS
= 2B LINE U/SIDE OF FIRE RATED bz °
. z STAIRS « RAKED WACEMIN ORL 5 Z c
| eae (a CRRING TO SUIT coon | oe (a WINDOW SCHEDULE WINDOW AND DOOR SIZES
5 3 4A BED 1 ro nat RE oi \4) ARE INDICATIVE ONLY.
“ Bates | eee eees NE [no] [ive 0 FF] ALL OPENING SIZES ARE TOBE
gn) ae 5 4 pera Pw] EC a commen
bE g at . 3 m CONTRACTOR.
E Lor BED? ,6| si CC / : [wa [eos on [Lunn Dos. HUN 2
s g a F TIMBER POSTS aon ws age 3 Y £ | w3__| 06/06 SW- OBS | ALUMINIUM SLIDING EXCEPT WHERE NOTED
a Sra & a © 915 GARDEN g | w4 | 06/15 SW-OBS | ALUMINIUM SLIDING
si Zz
s| § aa & S22 / pws | 1212Sw ALUMINIUM SLIDING [2.4
aie eastern oat pbs / Z [we 1824 Sw | ALUMINIUM SLIDING LEGEND:
2 2 E LEGEND:
2 : eo ‘ zg 190mm RG BLOCK WALLS
a 3 f a Z| i — z at / oF SS TO ENGINEER'S SPEC.
* eof telek slob felohde = a
Tl . Prizks|ss\6/7[s ohare .
oe a ae 2 <<< —_ he GF STRUCTURE OVER ~~ ae a MEE 70mm TIMBER FRAMED WALL
a ~ REFER WINDOW REFER WINDOW =
ms SHADE (Day SHADE (D3 100 x 100 HWD.
g TIMBER POSTS AMENDMENTS
191 SHOTEDGE HWD a7 nany Cc.
3S STAIR POSTS ote tt 2400__100/) 800_[1100 TIMBER BATIENS TO POSTS 27.08.07 Bacdod 1oOne set hn slab
a 3500 Updated driveway profile

 

 

 

 

   

 

100 + 2500 70h 3480 BED 1 70 a2 LORY yz 2530 To ype po 3130 BED 2 L190 2810 TERRACE te 6620 44s 19.09.07 Updates driveway y profile, ining &
: janged door een Dining
400 250070 2660 704, 1000 so} 1890 BATH a 1000 03130 BED 2 ym0 1860 _100 te 750 }.190__1610 fy 4620 —}yis0 Carport to window.
2600 DECK 3800 4000 3200 3190 6810 Changed truss roof on Upper level
LOWER FLOOR PLAN seen} i = ot Srna anes et 2*
i Changed wall between Bed 2 &
t / 24200 t . : Terrace from timber frame to
. + RC block and changed door sizes.

 

SCALE 1:100

  
 

S S O u t h e rn C ros $ Notes: PROJECT INFORMATION
D e Ss j g n & D r a ft j n These drawings have been prepared for Building Permit apptication only. It is the Buildersfowners Frasponsibility JOrawn; Cs

to further interpret the design and drawings to detail the project for construction.
Commercial * Industrial * residentia bulldl . Builder shail verify all locations af services, dimensions and levels prior to construction. CLIENT: Matthew & Joanne Exley
ii i arooch' dor ng designers Setout dimensions on site shall be confirmed by builder before commencement of construction and ordering. LOT NUMBER: Date: 19/9/07
uite, ixth Ave ochydore
Ph: 5479 5313 Fax: 5479 5314 association of Amend satout if necessary to comply with council by-laws and setback distances. :
QB SA Li ic 1 1041 4 queensiand inc. During construction the building shall be maintained in a stable condition and no Part shall be overstressed. SUBURB

Member

 

 

 

 

 

Page 31

 

 

COLORBOND FASCIA AND
GUTTER. COLOUR 1

PITCH __ \
SOINERY.

 

 

Unit 2
4
RENDERED FC SHEETING FIXED TO

70mm TIMBER FRAME.
COLOUR 3

 

 

 

100 X 100 HWD TIMBER POSTS.

  
  
     

 

 
 

    

 

 

 

 

 

 

 

  

 
 

 
  

           
 

 
  

 
 

 
 

 

    

 

 

 

 

 

   
    

Hil * 90x 191mm SHOTEDGE HWD TIMBER
COLOUR S me | BATTEN 8CREEN. COLOUR 2
‘RET @BOURDAR H ‘ SUSPENDED RC SLAB TO
JOINERY
RC BLOCK WALLS WITH SELECT
OUTLINE OF 400mm HIGH RC CR FINISH. COLOUR 3
BLOCK RETAINING WALL.
REMOVED FOR CLARITY
LOWER FLOOR @ RL 20.94
TO MIN. FRL 60v8080, ‘AND DOORS FIXED TO
RC FOOTINGS AND BLOCK MANUFACTURER'S SPEC AND
WALL TO ENGINEERS DETAILS NS RATING
SCALE 1:100
. « 400
Unit 1 Unit 2 ee
COLORBOND CUSTOM ORB ROOF RENDERED FC SHEETING FIXED
SHEETING TO MANUF. SPEC FIXED. TO 70mm TIMBER FRAME.
TO N3 NON-CYCLONIC RATING. COLOUR 3
COLOUR 1
r nent ny SOLAR HOT WATER SYSTEM AS:
§ Hi i 4 ST PER BUILDER'S CONTRACT.
Le fe rl POSITION TO BE VERIFIED
i COLORBOND FASCIA AND:
PITCH 7 — GUTTER. COLOUR 1
JOINERY et Ie
}—— ALUMINIUM FRAMED WINDOWS
AND DOORS FIXED TO
MANUFACTURER'S SPEC AND
N3 RATING
UPPER FLOOR @ RL 23.84
CEILING -
JOINERY _
COLORBOND CUSTOM ORB
| CLADDING TO MANUF. SPEC FIXED
TO N3 NON-CYCLONIC RATING.
COLOUR 1

100 X 100 HWD TIMBER POSTS.
COLOUR 3

LOWER FLOOR @ RL 20.94

TIMBER FRAMED STAIRS WITH
SS WIRE BALUSTRADE

 

 

 

 

   

1000mm GLAZED
BALUSTRADE

FIRE RATED PARTITION WALL
TO MIN. FRL 60/60/60.
SELECT CR FINISH. COLOUR 3

ELEVATION C

SCALE 1:100

  

4 | Sheet roof, gutters |COLORBOND
& downpipes. "Windspray”
Custom Orb
cladding or equal colour

Timber batten DULUX
screens "Ferry"

or equal colour

Rendered sheeting] ny, yx

, walls & exposed | », L ”
timber ‘Clay Bake’

{truss tails, posts,
beams & battens)

or equat colour

 

 

Schedule of External Colours

 

 

 

  
 

Property Line

HWD RAFTERS AND BATTENS - SEALED AND
PAINTED WHERE EXPOSED. COLOUR 3

COLORBOND CUSTOM ORS ROOF
SHEETING TO MANUF. SPEC FIXED

|
GRANT STREET |

 

 

COLORBOND CUSTOM ORB ROOF
SHEETING TO MANUF. SPEC FIXED

TON3 NON-CYCLONIC RATING. “a P
COLOUR 1

RENDERED FC SHEETING FIXED TO
70mm TIMBER FRAME.

Property Line C)

   
    
 
    

ALUMINIUM FRAMED WINDOWS AND:
DOORS FIXED TO MANUFACTURER'S
SPEC AND N3 RATING

 

 

 

 

 

 

 

 

 

  
 

 

| TO N3 NON-CYCLONIG RATING, 8m ABOVE NGL

ne PITCH
— R 5 i SS JOINERY
COLORBOND FASCIA
2 8 AND GUTTER.

8
s $ COLOUR 1

nN N
_CARPORT SLAB @ RL SS _ ne UPPER FLOOR @ Rus a Be
RENDERED FC SHEET FIXED TO JOINERY.
70mm TIMBER FRAME, 100 X 100 HWD TIMBER
COLOUR 3 POSTS. COLOUR 3
TERRACE SLAB @ RL 20.89 LOWER FLOOR @ RL 20.94

RC BLOCK WALLS WITH SELECT CR
FINISH. COLOUR 3

90 x 19mm SHOTEDGE HWD TIMBER
BATTEN SCREEN. COLOUR 2

ELEVATION B

SCALE 1:100

    

 

 

 

 

 

a
=
5
- COLORBOND CUSTOM ORB ROOF
a SHEETING TO MANUF. SPEC FIXED
550 a 400
2 TO N3 NON-CYCLONIC RATING.
a COLOUR 1
ALUMINIUM FRAMED WINDOWS AND RENDERED FC SHEETING FIXED TO
DOORS FIXED TO MANUFACTURER'S 70mm TIMBER FRAME.
SPEC AND N3 RATING COLOUR 3
reprich
_
pocH
JOINERY a
COLORBOND FASCIA
AND GUTTER
COLOUR 14
UPPER FLOOR @ RL 23.84 -
CEILING
JOINERY
100 X 100 HWD TIMBER
POSTS. COLOUR 3
LOWER FLOOR @ RL 20.94 I _

 

BOUNDARY
FENCE

COLORBOND CUSTOM ORB
CLADDING TO MANUF. SPEC FIXED

90x 19mm SHOTEDGE HWD

TIMBER BATTEN SCREEN. TON3 NON-CYCLONIC RATING.

COLOUR 2 COLOUR 1

ELEVATION D

| SCALE 1:100

 

S Southern Cross
Design & Drafting

Commercial * Industrial * residenti.

Suite/4 80 Sixth Ave Maroochydore buliding designers’
Ph: 5479 5313 Fax: 5479 5314 association of
QBSA Lic 1110414 queensiand Inc.

Member

 

 
 
   
 
      
 
 

    
      
    
 
 
 
 
  
    
       
 

  
   

 

 

  

WINDOW SHAD!
HOODS. REFER BOUNDARY
DETAILS ON SHEET 7 FENCE

  

   

TIMBER FRAMED STAIRS WITH COLORBOND CUSTOM ORB
SS WIRE BALUSTRADE CLADDING TO MANUF. SPEC FIXED 90x 19mm SHOTEDGE HWD
TO N3 NON-CYCLONIC RATING. TIMBER BATTEN SCREEN.
COLOUR 1 oe
o
2
— >
—_ g
fi cy ae s
— a

\

—_— HWD RAFTERS AND BATTENS - SEALED AND
PAINTED WHERE EXPOSED. COLOUR 3

 

| GRANT STREET

TON3 NON-CYCLONIC RATING. |

COLORBOND CUSTOM ORB ROOF

COLOUR 1

 

 

70mm TIMBER FRAME.
COLOUR 3

 

TERRACE SLAB @ RL 20.89
RC BLOCK WALLS WITH SELECT CR
FINISH. COLOUR 3

90 x 19mm SHOTEDGE HWO TIMBER:
BATTEN SCREEN. COLOUR 2

WINDOW SHADE
HOODS. REFER
DETAILS ON SHEET 7

 

NOTES:

STAIRS TO COMPLY WITH BCA 3.9.1.3 AND 3.9.1.4
HANDRAILS AND BALUSTRADES TO

COMPLY WITH 3.9.2.3 (QLD)

(MIN 1000 HIGH AND 125 BETWEEN RAILS)

TIMBER FRAMED STAIRS WiTH
SS WIRE BALUSTRADE

ROOF WATER TO BE DISCHARGED TO
ON SITE WATER STORAGE TANKS

S PER HYDRAULIC ENGINEERS
BETAIS AND SPEC

N3

STRUCTURAL DESIGN BASED UPON
NON-CYCLONIC N3 FOR WIND SPEEDS

TO 41 mis.

AMENDMENTS
27.08.07 Raised carport slab RL
& added 400mm setp in slab
Updated driveway profile
LINTELS SPECIFIED REFER ENGINEERS
19.09.07 Moved Unit 800mm towards rear REPORT. ALL WET AREAS TO COMPLY

boundary. WITH B.C.A. 3.8.1 LINE U/SIDE OF
Raise Unit 200mm and lower EXTERNAL COVERED AREAS WITH F/C
carport slab 172mm. SHEETING.

Updated cveway Profile.
Add fixed glazing panel above

window to Dining. HATCHINGS AND FITTINGS ARE INDICATIVE

Changed truss roof on Upper level ONLY. REFER BUILDERS SPECIFICATION

to rafter & purlins with raked ceiling.

Changed wali between Bed 2 & TERMITE PROTECTION:

Terrace from timber frame to AS PER AUSTRALIAN STANDARDS AS3660.1/2000

RC block and changed door sizes.

These drawings have been prepared for Building Permit application only. It is the Builders/owners responsibility PROJECT TYPE: RESIDENTIAL

to further interpret the design and drawings to detail the project for construction
Builder shall verify all locations of services, dimensions and ‘evels prior to construction CLIENT: | Matthew & Joanne Exiey_|

Setout dimensions on site shail be Confirmed by builder before commencement of construction and ordering.

 

During construction the building shall be maintained in a stable condition and no part shall be overstressed.

LoTNuMBER; | 10 19/9/07
Amend setout if necessary to comply with council byiaws and setback distances. STREET: Scale: 4100 A1_ | 30f8

SUBURB:

 

 

 

 

Page 32

pies abi var hans pt Sen

UPPER FLOOR

[LOWER FLOOR

O 7A]
3
°
on} &
o Ww
& Bj w
Ss °
= olw
ein
*
o
2
o
2
rey
wu
x
2
5
a
z
8 2
Zz
° 8
o
=
9g
=x
ee BF.
' 2
| .
| 3
j ol:
| ae 2
i oq
: ola
2 m—riN
2 oO
°
g

|SITE PLAN _
| SCALE 1:100

5511

C)

oe

1800 HIGH GOOD NEIGHBOUR FENCING

   

  

‘

 
  

. 4

   

 
  
 

—— eee ee

ee eee eee ee

  

     
     
   
   
    
 

  

f. ANDSCAPING

33711

§2°55'20"

___ §

= sPROPOSED |

UNIT 1

a

FIRE RATED PARTITION |
WALL MIN, FRL 60/60/60

PROPOSED.
UNIT2

Ae ee |
tO ame oe

PROPOSED.
UNITS |

FIRE RATED PARTITION WALL.

MIN. FRL 60/60/60

ROPOSED
“YNIT 4

1800 HIGH GOOD NEIGHBOUR FENCING -

Ss

3 - §

2600 3800

 

S
e

 

wt

[Sian |

52 232°55'20"

"33711

2
e

4000

UNt OF BUILDING Ulwut &

    
      
   
      
 
  

3

2000 FO!

NE OF BUILUING OVER

o™ SHOWN DASHED
™“ “4
s <
ge
3800 5000

Southern Cross

Design & Draftin
Soil Bo Soul Ave Maroochydore
Ph: 5479 $313 Fax: 5479 $314
QBSA Lic 1110414

|

—

“

S$ DF

 
 
   
 
  
   

 

KT

  

| AR bee
Ko Bee

eae

ty

He

oe]
wv

Pu
av

re
Coe <,
enn) 0) ~

.

Y
Ss

f -
¢ ,
vata

eh!

i“
t=

eo

5093

os

  
  
  

 
  
   

 

 
 

  

GRANT ST

Noles:

ntti,

KEY

FEATURE TREE

Sf2yéuem Birt Lut ATU

Y
3K
A

Steer tree - wAkPUUe PENDCA

SITE NOTES:

LOTS 9 & 10 ON SP179879
PARISH OF WAVER

1g. COUNTY OF MARCH
C) memum SHRUB - LALLSTEMION SP TOER OT 9 - 543m

59) medw mn SHRUB - METE0S10 EROS FrT/ FRE

2 Featuze taee ~ ©19 aevouTA

i GRASSES ~ MASS PLANTINGS

AREA LOT 10 - 543m?

GENERAL NOTES
1. Tne dwelling is not to exceed 8m
above the natural ground line.

2. The profile of the venicle access
drive is ta be as per council requrements

3. All dimensions are in minmnet es

 

U.N.O.

PANT SPEDE ——- Z
Beranccar ame [commun nome [se [gear at] sence |
races {WARPULIA Pgeiduca [Tuuspwaod | 45k [FE EAS ses
ByZ1Gium PA WM unewy | 4h | 4 Tas sain |
SHdves 151 Nt Bettieaeasn | 200mm |1-16m [44 [as Bown
MELLO OK ED ct Fee] wzsomas Bush | 200mm lam [22}45 sHonn |

3 rae

GLASSES PamanDen pontFaual dn
Juncus Kamas fd a
ISOLEPSIS NODOSA ten TF 46 ces T — I

S/me
Ts jm2
30cm [=| stn __|

i Ti mM
cer EVERGOLY ewe Te TTS

SCHEDULE OF SITE INFORMATION

ee eee

PLANNING REQUIREMENTS
BUILDING HEIGHT.

MIN. SITE AREA
POPULATION DENSITY
PLOT RATIO

SITE COVERAGE
LANDSCAPED AREA

MIN. ROOF PITCH
EAVES

 

THESE DRAWINGS ARE FOR DEVELOPMENT APPLICATION ONLY.

NOT FOR CONSTRUCTION

|

2 STOREYS OR 8m

E

4.8 PERSONS
0.45:1 = 244.35m? MAX
40% = 217.20m?

192m2

160% SOFT LANDSCAPING)

5°
600mm

4.8 PERSONS (2x2 BEDROOMS) |

|

MIN.

 
    
    

 

 

Page 33

 

 

 

 

 

 

 

 

 

 

 

     
               

 

 

 

 

 

 

   

         

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

        

 

 

 

 

       

 

    
       

  

 
 
   

     

 

 

 

   

 

 

    

 

 

 

 

       

 

4:20 0 7 81:20 1:40
4 a
a aS
Provide Roof runoff harvesting 5s
tank type TANK MASTA S
4 or equivalent. | ca
Minimum volume 10,000litre 3 A
3 Size: 3100 diameter
a 1640 height + 2
aN
a” 3 S TELACHM PIT
RCPs 16.92 LINE OF BUILDING UNDER
wo . yx LIGHT POLE
b “
@ XP evectrid Box
1 ~ YANDECAPING x
LANDSCAR : I
< 5 q
I H p
: qc = a
if? H b ol e
2
"4 ( +
< 5 5
y Slate B 4
“a a 5 3
® S'l) GAR
a B
4| Pa Iq “4 i
a DECK ol (SLAB 0 r) —{ |!
wy | ts 4 | |
av al ,
gn oa
© ©
a | saat | SS | lh |S 3
® &: > me *
b * a ‘ ir
eee toli___| a i | 1:8 1:40
t L
u r a | A : :20
zZ ° «4 H
fay b oy) ~ a
a OF Hg
a ey H ;
(a >| | H
=) =
ow —se| PPO} s cH
a gUPPER FLOOR | 5/k @ H Y
a Hy j
? RL 23.84 SII A y
9 .! | | (SLAB RL 23.79] |B Q
Wy a} | = H _
uw t =
a Zz | 9 H ~
G “| E i
o i F y & se ¢ &
r 9 TSE
2 Ly i LWA - OF nxn Re
SN Y FFL23.790 Y PSL ee
S QWOY STH RWATER EMER RERERRRRR RRR REI
Connect to existing w SY RRR IHN I I
council stormwater inlet. be
Core drill and seal with @) | } Fie HYDRANT
non shrink grout. DWATER MEWER
x y
Pp
2 A
fe
Hs
He
| ‘=
oy
z |
A
r
Feb
4
|
Hy
Fy y
Ey '
A
He LY
q Hi x
g ; EA Ra | *
$ HH
@ Hy * * * aa
8 A we?
a Bi 3 1:40
3 =
a ° Connect all =| 4
~ DP’s to tank. 5 =
For location and sty
number of DP’
refer BA drawings.
2
a

 

 

 

 

 

60

 

4 TELE PIT

 

 

 

 

N\
\ ———
Eo
A
Pit TTT UT TT il
2
b

  

 

 

eS ELECTRIG BOX

 

For Development Approvai| X
For Building Approval

A
uy ww a

wo Ss G ls Constructed =| | CTC
a )

 

 

 

 
 

 

 

 

 

 

     

 

 

o 1640 height 2
x ie
| ‘ contact: Reinhold Koenning MigAust RPEQ No 7023
Trench ' PO Box 1176
gra ! Buddina QLD 4575
| —— email: [email protected] PH: 5444 8645
oe \ el www.conhyd.com FX: 5444 8224
See VEHICLE | CUENT =
ACCESS DECK '
TIMBER ' LIVING
| ENTRY DRAIN TO GROUND CONCRETE DRIVEWAY ENTRY MATTEW & JOANNE EXLEY
ARCHITECT

Provide cut off |
drain 150mm high |;

   

DRAIN TO TRENCH GRATE ;
ett SOUTHERN CROSS
L N_ & DRA N <|
PROJECT: PROPOSED RESIDENTIAL
LOTS 9 & 10 GRANT STREET
TERRACE IS NOOSA HEADS

a ORAWING TITLE:

 

 

 

 

 

 

 

 

 

 

 

 

TERRACE

 
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STORMWATER
OPERATIONAL WORKS
& DRIVEWAY DESIGN

 

 

 

LAUNDRY

 

 

 

 

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KRRKKKKKRKKCRRRRRRER ARES As)
SSS Design| RK [Checked Date |17—S-O7 | Dwg. No.

\sour 1100 wm una 2 of 2 | 1743-0-1/ A

RPD:-— Lots 9 & 10 on SP179879

 

 

 

 

UPHILL DRAINAGE

 

 

Page 34

 

 

 

 

 

 

Lots 9 & 10 on SP1/98/79

  

DRAWINGS
1743 — GENERAL NOTES & LEGEND

LOTS 9 & 10 GRANT STREET 1743-0-1  — STORMWATER OPERATIONAL WORKS
NOOSA HEADS

FOR
i :
MATTEW & JOANNE EXLEY Fo on eer genome

1
2. To list all in flow filtering devices like leaf eaters
at DP’s and other filters
3. To keep and maintain a log of cleaning
GENERAL NOTES 4. To clean devices including first flush storage tank
Water Supply and Sanitary Drainage has been designed and shall be constructed in - ifi i
accordance with the Q’ld Standard Sewerage Law, Q'ld Standard Water Supply Law, . as to manufactures specification . .
the National Plumbing and Drainage Code AS 3500., all relevant Australian Standords, ~—minimum quarterly, but monthly in rainy season
ond the requirements of the Local Authority. . . | . PROPOSED ~—after each major rainfall event
hese Drawings are diagrammatic only and shall be read in conjunction with ali relevant . oe
Architectural and other consultants drawings and specifications and other written DEVELOPM ENT 5. To inspect and clean tanks minimum once yearly
instructions that may be issued during the course of the contract. j ‘ . |
Any discrepancies shall be referred to the supervising officer for decision before 6. To install and maintain pump and fixtures for te .
reuse/watering/irrigation as to manufactures specification

proceeding with the work.

Contractor shall verify all fixture locations, invert levels, surface levels, and
cover to pipes are correct and obtainable prior to commencement of the work.
Tne exact location of existing, and proposed services, shall be verified with

the relevant Authority, or other trades as applicable.

Fire stop collars to be used on all plastic pipework penetrating fire resistant
construction.

SANITARY DRAINAGE

Underground pipework shail be 100 dia. PVC DWV, min grade 1:60 U.N.O.

Suspended Pipework shall be PVC class DWV.

Trade woste pipework to grease trap suspended shall be "Coesprene” or nity Ct
HDPE. Underground shall be vitreous clay or HDPE. Sere
Trade waste pipework to oil separator shall be HDPE, or Vitreous clay with

Nitrile” rubber rings.

CLeanouts or inspection openings brought to surface in paved or concrete

areas, or within buildings to have brass caps.

STORMWATER DRAINAGE

Underground pipework shali be 100 dia PVC class SW min grade 1:100 U.N.O.
Downpipes shail be 100 Dia PVC class SW.

Rainwater outlets (RWO) and planter outlets (PO) shall be “Gatic Wade” or similar,
with membrane clamp where required.

WATER SUPPLY

Pipework shail be copper tube type B. UNO. Water supply pipework shall be ZO dia
U.N.O. Except one fitting only may be 15 dia. max. length 3000 mm.

Hot water pipework shall jagged.

Hot water recirculating lines to be insulated with 20mm “Armafiex” or similar.
Provide tempering voives on hot woter to personal hygiene fixtures.
Underground copper pipework shall be "Kemlagged” or otherwise protected.
Underground pipework not under concrete slab may be polypipe class PN20.
one size larger than shown.

Exposed pipework in amenities areas, shall be chrome plated.

Where water meters are installed within tennancies, provide remote readout
adjacent to Electrical meters, or in a position as indicated by the Architect.

BACKFLOW PREVENTION
Provide hose connection vacuum breakers to all hose cocks
Provide RPZD to any irrigation connections.

COVERS & FRAMES

Covers subject to vehicular troffic to be 535 dia, cast iron, medium duty UNO.
Covers in grassed or conc. areas to be 535 dia. cast iron, concrete infill light duty.
Covers in paved areas to be 600 sq. Infill to match paving pattern.

Covers in tiled creas to be as for paved areas with brass edging.

Concrete infill covers to be stomped “SWD" or "SEW as appropriate.

Covers & Frames to be “Faston” or equal approved.

GRATINGS

Gratings for storm water to be “faston, Gatic” or approved equal.
Duty to match manufacturers recommendations for loading condition.
Trench grate to be transverse bor.

Floor waste grates to be chrome plated brass

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 
  
  
  
  
 
      

 

 

 
 

     
  

 

 

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
      
 

 

 

 

 

first flush device, or
in garden 1m away

LEGEND
NP Non potable water o Diameter
Ww Existing water 6.0.8. Cleanout to surface - Description
s Existing sewer CJ Capped junction
Sw. Existing storm water cv Conrol vaive
——HD-———__ Existing house drain cs Cleaners sink I
———_ Sanitary Drainage ow Cold Water i '
eee eee Vent Pipe DAP Duct access panel | |
— Cold Water DCV Double check valve | 1
eee _- Een Eccentric Enlarger |
Hot water . Eley Dge Evevated Drainage !
——— — Storm Water Drainage Enl Enlarger r Shr | 1
weoceeeeeee Fire FC Faise ceiling . i |
agi Agi Drain FH Fire Hydrant | Roof water | :
cu Fire hose reel | ‘ : {
; L inished floor fevel i . a ; $
@}—— ° Cold Water Riser . : L -— -- Dishwasher Rainhead with leaf!
FU Fixture units — -- -
Down Pipe GIT Grease Interceptor trap t ] P 7 (=! Screen and mosgulte |
o Stack GP Gulty pit ' ' ’ ' 1 ?
® oc CMH Gully Man Hole | | | | | 1 Sk | i |
(P) ° Vent Pipe gv Gate valve ‘ : ' | ' | L | For Building Approval
6 HW Het water ‘ ' 1 i ‘or Building Approval
Group vent HCB House connection branch i oe ee a | ‘ [ oe ym | i
Educt vent HD House drain L J | | | -
Induct vert EH ve er Perth a ja-—-—-—l-.—-—-—-—-—-- oppo | 3
Hot water riser IL inwort Leve! t | 4 _| Note: ' first! flush device 1 As Constructed
BS 0 Fire Dropper io Inspection opening | ‘ { I 7 oo 7 Provide mosquito sate . i |
. ios Inspection Opening to Surface t ' i overflow and inflow screening ‘ | !
Fire Riser i | |
° K&C Kerb & Channel |! ! | { | |
(8°) o ‘ MH Manhole woe
0 Non potable riser ’ ae | visual water '
Be Nor plurn valve | | I | 7 Ya - Overflow | level, site tube |
~~ "7 water meter PLY Pressure limiting valve 1 L_ ’ Solenoid siphon [I | optional j 1
—- OUVCsCVaWe PO Planter outlet | j gwitchover | -__ LO | | Driveway
RPB Real Property Boundary ' 1 . —-~ sit i ‘
—# hc Hose Cock RPD Real Property description _ | [ | tL ” | | floating ball { Landscape . ;
—<— een Eccentric enlarger RAD Reduce Pressure Zone device [re z Sow leok } valve New impervious contact: Reinhold Koenning MicAust RPEQ No 7023
i
—--Ce-— en Enlarger RWH Rain water head L we | to be determined j | ' Buddine Qld 4575
ey ORG Overflow Relief Gul P Sanitary Drainage Tempering valve aD | Harvesting ' | CATCHMENT AREAS email: [email protected] PH: 5444 8645
verilow Relet Cully max 50°C | zone | ' www.conhyd.com FX: 5444 8224
s Square ' | | (TOTAL OF BOTH -
(we Water ok Safe Tray ne NP NP 7M a nev! cv j ! PROPERTIES
Closet SWD Storm water drain mark "NON POTABLE ; | | MATTEW & JOANNE EXLEY
. t/td Trapped Tundish ‘ !
ERs] sk Sink 1G Test gate | t
td Tundish Zz NP F 1 i ARCHITECT ;
uT Laundry tub ret Trench grate transverse bar | ‘ SOUTHERN CROSS
. Tol Trench grate longitudina! bar Pump 1 | D g A
wm Washing TMV. Thermostatic mixing valve Sludge vaive ‘ Ws A
Moen Wy; cempering vaive optional 4 Note: PROPOSED RESIDENTIAL
toor Wast u ndergroun : sags :
Fwc Giopr Waste wo Under slob irrigation 3 HC | All kitchen, laundry & bathroom fittings and toilets LOTS 9 & 10 GRANT STREET
Bn Bosin wo, Unless noted otherwise ‘ to comply with the AAA Water Conservation Rating NOOSA HEADS
“L_t Le Mex 500kPo preleure! i System as defined by AS/NZS6400. DRAWING TITLE:
ix ei . .
mn Bese bx] Shr Shower Stormwater limiting vaive evithin | Provide flow restrictor valves where necessary
FHR Fire Hose R. allie path box ‘ to taps and shower roses. The flow shall not
Hi 7 i . .
ire Hose Keel C) HWS Hot water system | exceed a maximum of 9L/min GENERAL NOTES &
cs Cleaners Sk | | LEGEND
stormwater Capilary bleed tubing |
system discharge point from ! '
'
I

STORMWATER HARVESTING STRATEGY

 

[Design| RK [Checked] [Date |17-5—07__| Dwo. No.
RPB Towns SCALE ; 1:100 ON A ULN.O. | 1 oF 2 | 1743

main
Lots 9 & 10 on SP179879

 

 

 

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1992 - Op Works - Landscaping, carparking, access forntage works, stormwater & erosion & sediment control [As Published].pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.