07/1992 - Op Works - Landscaping, carparking, access forntage works, stormwater & erosion & sediment control [As Published] · 142007.1992

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
Warks that take overland flow water

The relevant wild river declaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.

If you ticked Q13 3), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked Q13 i) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

If you ticked Q13 ili) your application is not
subject to wild river requirements,

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

13,

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

NO oO YES (ensure you have completed Part Ks of Form 1)

\f YES, is the application for works stated in the relevant wild river declaration to be?
(_] i) assessable works

[J ii) self-assessable works

O iii) exempt works

 

Works that interfere with overland
flow water

The retevant wild river declaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.

It you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

It you ticked Q15 ii) an application is not required
to be made however the works must comply with
the retevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW.
against the relevant part of the Wild Rivers Code
and must comply with the code.

(f you ticked Q15 ii) your application is nat
subject to wild river requirements.

Applications for development thatis other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

Does the application involve works that interfere with overland flow water in a FMA?

i] No

If YES, is the application for works stated in the relevant wild rivers declaration to be?
(J i) assessable works

0 ii) self-assessable works

(J iii) exempt works

a YES (ensure you have completed Part Kio of Form 1)

 

 

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
if you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

16,

Does the application involve building or raising waterway barrier works in a PA?
& NO oO YES (ensure you have completed Part Os of Form 1)

 

 

Aquaculture (non ERA)

Applications for aquaculture in a HPA will not be
accepted.

Ifyou answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Does the application involve aquaculture in a PA?

XI No

ClyYes (ensure you have completed Part O: of Form 1)

 

 

 

Works that interfere with water in a
watercourse

Note: If the devefopment is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepted.

tn a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
If you ticked box ji) in Q19, your application will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and focations of nominated
waterways is available by contact NRW,
accessing the department's website
www. now. qid.gov.au ar contacting the
department by email on:

wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

&] No

If YES,
O i) The application is for an instream dam or weir; or

oO il) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

O YES (ensure you have completed the relevant Part K of Form 1)

Page 13

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1992 - Op Works - Landscaping, carparking, access forntage works, stormwater & erosion & sediment control [As Published].pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.