Our reference: 003/00001240 (#374587)

4 July 2011

Ms Marie Hayes
Delegate

Department of Environment and Resource Management

Implementation and Support Unit
GPO Box 2454
Brisbane QLD 4001

Attention: Mr Grant Mogridge

Dear Ms Hayes

Concurrence agency response

(Issued under sections 282, 285, 287 and 289 of the Sustainable Planning Act 2009)

Queensland
Government

Department of
Employment, Economic
Development and Innovation

Proposal: Operational works that is the removal, destruction or damage of marine
plants and operational works that is constructing or raising of a waterway
barrier works associated with erosion protection works including submerged
channel closure, wall & groyne, dredging & beach nourishment.

Location: Noosa River entrance adjacent to Noosa River Spit

Property Description: Within and adjacent to Lot 114 MCH839107

Fisheries Queensland, a service of the Department of Employment, Economic Development
and Innovation, as a concurrence agency for this application, has assessed the
development application against the purposes of the Fisheries Act 1994.

Should the development application be approved, Fisheries Queensland requires that the
following aspects of the development be subject to the requirements and conditions stated

in or attached to this response.

1. Type of approval

 

Aspect of development

Type of Approval

Approval no.

 

 

Operational works involving the
removal, damage or destruction of
marine plants and

operational works for the
construction or raising of a waterway
barrier works

 

Development Permit (subject to
conditions)

2011DB0083

 

 

Southern Fisheries Centre

13 Beach Road Deception Bay
PO Box 76 Deception Bay
Queensland 4508 Australia
Call Centre 13 25 23

Website www.deedi.qid.gov.au
ABN 78 342 684 030

 
Full text of the other 6 pages

Page 2

2. Conditions
Conditions imposed on this development by Fisheries Queensland are stated in the
‘Department of Employment Economic Development and Innovation conditions’ attached.

Basis for inclusion of conditions:

Conditions have been applied as Fisheries Queensland must assess the development
application against the purposes of the Fisheries Act 1994 and relevant codes. The
proposed development can only comply with those purposes, including promoting
ecologically sustainable development, if compliance with the abovementioned conditions is
achieved.

3. Approved plans
The development must be consistent with the following approved plans:

 

 

 

 

 

 

 

 

 

 

 

 

Plan Number Title Date
NRS-002 PROPOSED STAGE 1 WORKS 1/04/2011
NRS-003 SUBMERGED CLOSURE LAYOUT 1/04/2011
NRS-004 SUBMERGED CLOSURE TYPICAL 1/04/2011

CROSS-SECTION
NRS-005 WALL AND GROYNE LAYOUT 1/04/2011
NRS-006 GROYNE TYPICAL CROSS- 1/04/2011
SECTIONS
NRS-007 WALL TYPICAL CROSS-SECTION 1/04/2011
NRS-008 DREDGE AREA LAYOUT 1/04/2011
NRS-009 DREDGE AREA TYPICAL PROFILE 1/04/2011
NRS-010 NOURISHMENT TYPICAL PROFILE 1/04/2011
NRS-011 NOTES 4/04/2011
NRS-012 AFFECTED VEGETATION 5/04/2011

 

 

 

 

 

4. Relevant period

If the application is approved, the approvals for the aspects of development listed above will
lapse if the development is not started within the relevant periods stated in section 341 of
the Sustainable Planning Act 2009 (ie. for operational works, 2 years starting the day the
approval takes effect).

Page 3

5. Additional advice to the applicant

Cultural Heritage

Under the Aboriginal Cultural Heritage Act 2003 a person who carries out an activity must
take all reasonable and practicable measures to ensure the activity does not harm
Aboriginal cultural heritage (the "cultural heritage duty of care"). An assessment of your
proposed activity against the duty of care guidelines will help you determine whether or to
what extent Aboriginal cultural heritage may be harmed by your activity. If following an
assessment of the duty of care guidelines you believe cultural heritage may be harmed by
your proposed activity, you should contact the Cultural Heritage Coordination Unit for further
advice on (07) 3238 3838. Further information on cultural heritage and a copy of the duty of
care guidelines and cultural heritage search forms can be obtained from
www.derm.qid.gov.au.

 

Acid Sulfate Soil

Any soil disturbance resulting from development works should be managed to prevent acid
sulfate soil development as outlined in the current version of the Qld Acid Sulfate Soils
Technical Manual Soil Management Guidelines. To obtain a copy of this document or for
further information on acid sulfate soils, please contact Queensland Acid Sulfate Soils
Investigation Team (QASSIT) on 3896 9819 or access the website www.derm.qid.gov.au .

If you require any further information regarding the assessment of this application, please
contact Jonathan Yantsch on telephone 3817 9554 or email
jonathan. [email protected] sincerely

Dan Willett
A/Manager
Planning and Assessment (South)

Att: Department of Employment Economic Development and Innovation Conditions

Page 4

Cx

Sunshine Coast Regional Council
c/- Bobbie Corbett

International Coastal Management
PO Box 306

Main Beach LPO

Gold Coast QLD 4217

Dr John Robertson
General Manager
Fisheries Queensland
GPO Box 46

Brisbane Qld 4001
Attention: John Beumer

Mr Greg Bowness

District Officer

Queensland Boating and Fisheries Patrol
PO Box 20

Tewantin Qld 4565

Page 5

COPY

Queensland
Government

Department of
Employment, Economic
Development and Innovation

DEPARTMENT OF EMPLOYMENT, ECONOMIC DEVELOPMENT

Applicant(s)/Address:

Purpose:

DEEDI Reference:

File Number:

AND INNOVATION CONDITIONS

Sunshine Coast Regional Council of International Coastal
Management, PO Box 306, Main Beach LPO, QLD 4217

Operational works that is the removal, destruction or damage of marine
plants, Operational works that is constructing or raising waterway
barrier works

2011DB0083
003/0001240

The Department of Employment, Economic Development and Innovation has assessed the above
development application against the purpose of the Fisheries Act 1994.

It has been determined that the approval should be a Development Permit to which the following

 

ions apply:

1 Works authorised under this approval is limited by the following:

Proposal Deta'

 

1. Removal of approximately 7975 square metres of marine plants including marine
dead wood to enable the nourishment of the foreshore with approximately 9000
cubic metres of sand and establish a site access track;

2. Construction of a permanent waterway barrier being an 80 metre long submerged
channel closure, and

3. Construction of a permanent waterway barrier being a 240 metre wall and groyne.
Associated with the Noosa River Spit Erosion protection Works specifically, Stage 1
works as shown on the following attached copies of submitted International Coastal
Management drawings:

Number NRS-002 titled PROPOSED STAGE 1 WORKS and dated 1/04/2011
Number NRS-003 titled SUBMERGED CLOSURE LAYOUT and dated 1/04/2011

Number NRS-004 titled SUBMERGED CLOSURE TYPICAL CROSS-SECTION and
dated 1/04/2011

Number NRS-005 titled WALL AND GROYNE LAYOUT and dated 1/04/2011

Number NRS-006 titled GROYNE TYPICAL CROSS-SECTIONS and dated
1/04/2011

Number NRS-007 titled WALL TYPICAL CROSS-SECTION and dated 1/04/2011
Number NRS-008 titled DREDGE AREA LAYOUT and dated 1/04/2011

Number NRS-009 titled DREDGE AREA TYPICAL PROFILE and dated 1/04/2011
Number NRS-010 titled NOURISHMENT TYPICAL PROFILE and dated 1/04/2011

 

Delegate of the
Chief Executive

Date Az, 20

Department of Employment, Economic Development and Innovation Page 1 of 3

Page 6

Number NRS-011 titled NOTES and dated 1/04/2011
number NRS-012 titled AFFECTED VEGETATION and dated 5/04/2011

Location: Within the bed and banks of the Noosa River (within and adjacent to the area
described as the Noosa River Spit, Lot 114 MCH839107) as shown on attached
copy of submitted International Coastal Management drawing number NRS-002
titled PROPOSED STAGE 1 WORKS and dated 1/04/2011

2 Written notice of the date of commencement of fisheries development works must be provided
to the District Officer, Queensland Boating and Fisheries Patrol (Fax. No. 5449 7276) and the
Manager, Planning and Assessment, Fisheries Queensland (Ema
[email protected]), at least five (5) business days but no greater than
twenty (20) business days prior to the commencement of fisheries development works.

 

3 At least three (3) signs must be displayed around the development works site, including one at
the main entrance to the property, in positions where the signs are clearly visible to the public,
for at least five (5) business days prior to the commencement, during and for 5 business days
after all fisheries development works. Signs are to be removed 5 business days after the
completion of the works. Each sign must state: "Works (Operational works that is constructing
or raising waterway barrier works and operational works that is the removal, destruction or
damage of marine plants) authorised under Development Approval Conditions. Fisheries
Queensland Reference number 2011DB0083. Fisheries Queensland telephone (07) 5449
7555".

 

4 For the purposes of section 145 (c) (ii) of the Fisheries Act 1994 the place where works wi
take place is a place required to be open for inspection.

 

5 All marine plants authorised for removal and other material used in the development that does
not form part of the approved structures (e.g. debris, construction material, soil, etc.) are to be
removed from the intertidal zone.

6 Due to the migration and spawning activities of commercially and recreationally important
species of fish within the area, dredging works must not be undertaken:

during the months of June and July; and

during the two days prior, the days of, and the two days after the new and full moons in the
month of August.

7 Monitoring of the completed Stage 1 works, as defined within the Proposal Details of Condition
1, must be undertaken annually for a reasonable number of years (dependent on the outcome
of the monitoring) by a suitably qualified person and must be concluded with an annual
monitoring report. Each annual monitoring report must be provided to the Manager, Planning
and Assessment, Fisheries Queensland, PO Box 76, Deception Bay QLD 4508. The
monitoring report must include an evaluation of the completed Stage 1 works; specifically, their
effectiveness in combating ongoing erosion, and an evaluation of the need for further works.

8 A written report which details the completed fisheries A written report which details the
completed fisheries development works must be provided within fifteen (15) days of the
completion of the works, to the District Officer, Queensland Boating and Fisheries Patrol, PO
Box 20, Tewantin QLD 4565, and the Manager, Planning and Assessment, Fisheries
Queensland, PO Box 76, Deception Bay QLD 4508. The report should contain confirmation of
the amount of disturbance to marine plants, confirmation of the total amount of dredge
material, as-constructed drawings and an overview of the construction methodology and
timeframes.

 

 

Delegate of the
Chief Executive

Date Ar 12M

Department of Employment, Economic Development and Innovation Page 2 of 3

Page 7

9 OFFSET CONDITION

A Deed, or other formal written agreement, for fish habitat offsets is to be entered into
between The State of Queensland, acting through its agency the Department of Employment,
Economic Development and Innovation (DEEDI), and Sunshine Coast Regional Council. The
impacted marine fish habitat outlined in Condition 1 is to be offset in a manner that is
acceptable to Fisheries Queensland and compliant with the Queensland Government
Environmental Offsets Policy and Fisheries Habitat Management Operational Policy FHMOP
005: Mitigation and Compensation for Works or Activities Causing Marine Fish Habitat Loss.
The offset/s will preferably be documented within an offset package for the Noosa River Spit
Erosion Protection Works and may include:

 

 

 

a) direct offsets through inputs for the protection, creation or enhancement of fish habitats and
fisheries resources: or

b) indirect offset financial contribution to be allocated to fish habitat projects for the protection,
creation or enhancement of fish habitats and fisheries resources; or

c) a combination of a) and b). The offset Deed, or other formal written agreement, must be
executed by both parties within three (3) months of the issue of the decision notice for this
approval.

Basis for inclusion of conditions:

e The Department of Employment, Economic Development and Innovation must assess the
development application against the purposes of the Fisheries Act 1994. This application can
only comply with those purposes, including promoting ecological sustainable development, if
compliance with the abovementioned conditions is achieved.

 

Delegate of the
Chief Executive

 

Department of Employment, Economic Development and Innovation Page 3 of 3

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

img-707115822-0001.pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.