Council archive · source document
img-707115822-0001 · OPW11/0116
Number NRS-011 titled NOTES and dated 1/04/2011 number NRS-012 titled AFFECTED VEGETATION and dated 5/04/2011 Location: Within the bed and banks of the Noosa River (within and adjacent to the area described as the Noosa River Spit, Lot 114 MCH839107) as shown on attached copy of submitted International Coastal Management drawing number NRS-002 titled PROPOSED STAGE 1 WORKS and dated 1/04/2011 2 Written notice of the date of commencement of fisheries development works must be provided to the District Officer, Queensland Boating and Fisheries Patrol (Fax. No. 5449 7276) and the Manager, Planning and Assessment, Fisheries Queensland (Ema [email protected]), at least five (5) business days but no greater than twenty (20) business days prior to the commencement of fisheries development works. 3 At least three (3) signs must be displayed around the development works site, including one at the main entrance to the property, in positions where the signs are clearly visible to the public, for at least five (5) business days prior to the commencement, during and for 5 business days after all fisheries development works. Signs are to be removed 5 business days after the completion of the works. Each sign must state: "Works (Operational works that is constructing or raising waterway barrier works and operational works that is the removal, destruction or damage of marine plants) authorised under Development Approval Conditions. Fisheries Queensland Reference number 2011DB0083. Fisheries Queensland telephone (07) 5449 7555". 4 For the purposes of section 145 (c) (ii) of the Fisheries Act 1994 the place where works wi take place is a place required to be open for inspection. 5 All marine plants authorised for removal and other material used in the development that does not form part of the approved structures (e.g. debris, construction material, soil, etc.) are to be removed from the intertidal zone. 6 Due to the migration and spawning activities of commercially and recreationally important species of fish within the area, dredging works must not be undertaken: during the months of June and July; and during the two days prior, the days of, and the two days after the new and full moons in the month of August. 7 Monitoring of the completed Stage 1 works, as defined within the Proposal Details of Condition 1, must be undertaken annually for a reasonable number of years (dependent on the outcome of the monitoring) by a suitably qualified person and must be concluded with an annual monitoring report. Each annual monitoring report must be provided to the Manager, Planning and Assessment, Fisheries Queensland, PO Box 76, Deception Bay QLD 4508. The monitoring report must include an evaluation of the completed Stage 1 works; specifically, their effectiveness in combating ongoing erosion, and an evaluation of the need for further works. 8 A written report which details the completed fisheries A written report which details the completed fisheries development works must be provided within fifteen (15) days of the completion of the works, to the District Officer, Queensland Boating and Fisheries Patrol, PO Box 20, Tewantin QLD 4565, and the Manager, Planning and Assessment, Fisheries Queensland, PO Box 76, Deception Bay QLD 4508. The report should contain confirmation of the amount of disturbance to marine plants, confirmation of the total amount of dredge material, as-constructed drawings and an overview of the construction methodology and timeframes. Delegate of the Chief Executive Date Ar 12M Department of Employment, Economic Development and Innovation Page 2 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
img-707115822-0001.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.