6.0 LOCATION OFBOREHOLES
The location of bore^oles are marked and numbered as set out on the following site sketch. (Not to Scale)
Fall greater than 10°/n
--- lore -- ----------- Black
------- -- Mountain road
-6m Proposed retaining walls or fill batters 1:2 01
2m 2m
3m I,
Fill 2m ,^-- 2m
- - - - - --
Proposed m
-6m 7m
cut 7m ^r: I '^j;• -32m
• 12m 2rt^ • to boundary
3m
5 -45m
9.5 ° 10 0
Fall
-1 ore
Gate
Access Road
Over-head power h^er:
7.0 COMM ENTS & RECOMMENDATIONS
_/, J.d 1 Jl Eno. e apwr.. 'ro! s - :JCS!
7.2 All Retaining Walls to be a minimum of 1500mm from slab edge (in both top of fill & bottom of cut situations) unless
otherwise noted on the drawings.
7.3 The Building platform is to be self draining.
7.4 Site Notes: . Due to recent heavy rains and the slope of the block it is recommended that a slope stability assessment be
carried out. Borehole measurements taken from the pegged out house boundary.
8.0 CERTIFICATION
tac a:u f e ow is to ce t fy tha..7is repc7 ras Geer com,l ed r accordance w th ",cstraLar Standards AS28 i
1996; AS1726- 1993; & AS3798-1996.
Signed: 31-January-2011
James Tayler R.P.E.Q. 1407, MIE # 1183582 - Supervising Engineer Employed by Heltech Industries Pty Ltd
Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.