SITE INVESTIGATION REPORT
Date: 24 January 2011
INDUSTRIES
Client: Coral Homes
Site Location: Lot 5 (#528) Black Mountain Road
Cooroy
1,0 SITE INVESTIGATION RESULTS s'^C^a ^ccr m- ^ `AS2S'o o
1.1 Characteristic Soil Surface H [] Problem Site
Movement Equivalent to
1.2 1 ^Iss 1.8 BH#1 I Depth 0.8 Ys= 5
1.3 Site Cost Code /4
1.4 Wind Classification N3 (W 1) _ ^!
In accordance with AS4055-2006
1.5 Vehicle access to site Good 1.8.3 Fill suitable as founding material No
1.6 Site drainage status Good 1.9 Rock Encountered which may No
affect excavation
1.7 Retaining walls required and
Engineer designed (if yes, show 1.10 Pad scarifying will be required
locations at 6.0)
1.8.1 Fill Batter to be constructed (in 1:2 1.11 Under Slab Services to be -Yes
accordance with BCA Part 3.1 suspended
Table 3.1.1.1) not steeper than:
1.12 Slope Stability Assessment will 7 s
be required
1.8.2 Fill onsite No
1.13 Fire Ant Area No
Fill to be placed Yes
NOTE:
This soil report is for the exclusive use of the client nominated and on the conditions that it is applied o.n.!v to Heltech Indust•ies recognsed engineers
No other person is authorised to use this report for any purpose without the written consent of Hettec° Ir:. as
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.