RFI - Attachment A - Rev Proposal plans · MCU20/0026
Plans and drawings: the text below has words only, no drawings.
ac air conditioner unit COPYRIGHT: Drawings remain the Copyright of the Architect: Shaun ROOF DRAINAGE: All downpipes to be located as noted on the
SD 000.00 perspective image
SD 000.01 perspective images bal01 frameless glass balustrade Lockyer drawings and sizes as scheduled. Allow to connect to in-ground storm
SD 000.02 sheets materials notes con01 concrete water drains with 90mmØ UPVC at 1:100 minimum grade. Allow for
fen01 boundary fence - type 1 ALL WORKS shall be carried out in accordance with the Building Code I.O.'s at each change of direction and at 6000mm centres.
fen02 boundary fence - type 2 of Australia, Australian Standards, Local Council requirements, QDC
SD 020.00 exemplar homes guidelines and all other relevant by laws and authorities. In particular SITE DISCHARGE: All stormwater and sanitary plumbing to be
ldr01 linear drain
SD 020.01 proposed materials
lpb01 plasterboard lining refer Australian standards: connected to existing council system in accordance with the
mtf01 metal flashing - type 1 · site preparation A.S. 3798 requirements of the relevant local authority.
SD 050.00 massing study mdp01 metal downpie · concrete construction A.S. 2870
SD 050.01 planning diagrams meg01 metal gutter · timber construction and details A.S. 1684.2 WATER LINES: All hot water lines shall be fully insulated. All domestic
SD 050.02 level classification mts01 metal roof sheeting · steelwork AS 4100, AS 1111 and A.S. 1112 hot water to basins, showers and baths to have maximum temperature
rnd01 acrylic render . termite protection BCA and A.S. 3660.1 of 50°C. Allow to supply and install tempering valves where required,
sk01 proprietary skylight . artificial lighting & ventilation BCA parts 3.8.4/3.8.5 and A.S. 1680 as nominated in the BCA and relevant standards.
SD 060.00 from Park Crescent 01 tbc01 timber batten screen . fire safety BCA part 3.7
SD 060.01 from Park Crescent 02 . smoke alarms BCA part 3.7.2 and A.S. 3786
til01 internal tile STAIR AND BALUSTRADES: All stair and balustrades shall comply
SD 060.02 At entry
. glazing BCA part 3.6 and A.S. 1288 and A.S. 2047 with part 3.9 of the BCA. Steps to be provided where fall from dwelling
SD 060.03 Rear of home
SD 060.04 South side of home exceeds 190mm.
SD 060.05 North side of home APPROVAL: No building work shall be undertaken prior to Building
SD 060.06 Living room Approval by a registered Certifier. ALL PRODUCTS: To be installed to manufacturers requirements and
SD 060.07 roof terrace to be in accordance with manufacturers requirements for suitable
CONSULTANTS: Drawings shall be read in conjunction with engineers exposure levels.
drawings and computations. All structure to Engineers design.
SD 100.00 site and locality plans
Hydraulic sizing and design to hydraulic engineers requirements. All PROPRIETARY ITEMS: Identification of a proprietary item does not
drawings to be co-ordinated with consultant documentation prior to necessarily imply exclusive preference for the item so identified, but
SD 200.00 Ground floor construction. indicates the necessary properties of the item. If alternatives are
SD 200.01 Level 01 proposed, submit proposed alternatives and include samples, available
SD 200.02 Level 02
DIMENSIONS: Do not scale off drawings - use figured dimensions only. technical information, reasons for proposed substitutions and cost.
SD 200.03 Level 03
SD 200.04 Roof Level
Contractor shall verify all dimensions on site prior to construction. Any
discrepancies or errors shall be referred to architect and client prior to TILES: Expansion joints, walls: 5mm. Floors: 8mm. Fill both with
installation / manufacture of any works. Confirm levels & RL's on site silicone rubber. Grout for wall: Epoxy based mildew resistant. Grout for
SD 300.00 South West prior to commencement of work. floors: prepared grout to be acid resistant. all wall tiles to have
SD 300.01 Park Crescent
SD 300.02 South East
fcsubstrate.
SD 300.03 North East
SETOUT: Contractor to confirm exact siting and orientation prior to
construction setout. All building setout and confirmation of setbacks INTERNAL PAINTING: Unless noted otherwise paint system to be
general construction notes
architectural drawing list
SD 300.04 North West
and height to be carried out by a Licensed Surveyor. No footing, or wall Dulux approved 3 coat system - low sheen finish. Colours to be
to encroach the title boundary. supplied by Architect during contract and applied as per Dulux's
SD 400.00 proposed building section 01
SD 400.01 proposed building section 02
recommendations and guidelines.
SD 400.02 proposed building section 03
TERMITE PROTECTION: Termite protection by means of termimesh
SD 400.03 Proposed building section 04 s.s. mesh hysical barrier in accordance with A.S. 3660.1/2000 and JOINERY ITEMS SHALL INCLUDE: Manufactured casework items,
material list
SD 400.04 Proposed building section 05 installed in strict accordance with current manufacturers specifications. including: kitchen cabinets and cupboards; bathroom cabinets; robes.
SD 400.05 Proposed building section 06
STRUCTURAL STEEL: Unless noted otherwise all exposed SANITARY COMPARTMENTS: Provide removable hinges to doors of
structuralsteel, anchor bolts and other attachments shall be hot dip sanitary compartments to comply with BCA 3.8.3.3 and be readily
galvanised. A cold gal painted finish shall be applied to any field removable from outside unless there is a clear space of at least
welding to existing or new steelwork. All steel work cast in concrete 1200mm b/w closet pan within the sanitary compartment and the
footings or slab shall have a bitumen finish applied to full extent of cast nearest part of the doorway.
in concrete steel. Check all dimensions on site prior to fabrication of
steelwork. APPLIANCES & EQUIPMENT: Builder to co-ordinate all appliance and
equipment locations on site and with joiner. installation and final
RETAINING WALLS: All retaining walls to structural engineers details. connection by the contractor.
Provide rubble backfill and agg drainage to all retaining walls. Builder to
provide tanking where required. WEATHERSTRIPS: All external doors to contain weather stripping
(type to be confirmed by Architect prior to manufacture)
SLAB & FOOTINGS: All slabs and footings to structural engineers
details. A polyethylene moisture barrier shall be lapped 200mm and DOCUMENTATION: The contractor shall carry out works in
fully taped under any habitable concrete slab and shall extend 100mm accordance with the signed drawings and schedules and anything
onto the perimeter footing. reasonable inferred, and with the Conditions of Contract, and in
accordance with the directions and to the satisfaction of the Architect,
ARTICULATION JOINTS: Provide articulation joints to comply with whose interpretation of the contract documents shall be final. The
"Cement and Concrete Association Construction Note TN9". drawings and specifications/schedules shall be considered
complementary, and any
EROSION CONTROLS: All building works to comply with local work and/or materials absent from one but present or implied in the
authorities Erosion and sediment control standards. other shall be furnished as if they were present in both.
WATERPROOFING: All wet areas and walls to be waterproofed in FINAL CERTIFICATE: At completion of work, Builder to obtain and
accordance with the BCA 3.8 & AS 3740. Builder to provide certificate supply a Certificate of Classification from a Building Certifier.
of installation and compliance.
POOL: Contractor to confirm heights/depths/steps and
CONCEALMENT OF SERVICES: All services shall be concealed in plumbing/electrical requirements and locations prior to construction
walls or ducts. Where services are exposed they must be confirmed by
the Designer on site prior to installation unless noted otherwise.
LICENSED TRADESPERSONS: All services to be installed by licensed
tradespersons in accordance with local authority and with current
manufacturers specifications.
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV
PROJECT NO 0309
DL
DL
B
C
24.04.20
11.05.20
SD Issue
Prelim Council RFI
40 Park Crescent, Asha & Sandeep Cover Sheet SD 000.02 E SCALE 1:1
Sunshine Beach Biswas
A3
DL D 13.05.20 Council RFI sheets materials notes
DL E 10.06.20 Revised Council Submission schematic design
1:1 @
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment A - Rev Proposal plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.