Council archive · source document
Decision Notice - 010.2007.00002385.001 [As Published] · 132007.2385
-2-
0780 SK03 C Level 3 Plan – Greg Gibbs Architects 6 November 2007
0780 SK04 Elevations – Greg Gibbs Architects 12 October 2007
0780 SK05 Elevations – Greg Gibbs Architects 12 October 2007
0780 SK06 Section – Greg Gibbs Architects 2 November 2007
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
the premises being occupied and maintained at all times thereafter.
4. All fencing shall be setback at least 1 metre from the front property boundary, with at least half
of the fencing setback 2 metres. The area of land between the fence and the front property
boundary shall be densely landscaped to screen any fencing from the street.
5. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. These landscape
plans required to be submitted are to denote areas of existing vegetation or existing trees
proposed or required to be retained.
6. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
6.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
6.2. Disposal for firewood.
6.3. Disposal for landscaping purposes.
6.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
6.5. The disposal method for clearing works is to be submitted in conjunction with an
application for a Development Permit for Operational Work. The Applicant is advised
that other methods may be considered provided full details of the method are
submitted.
6.6. The Applicant is advised that burning off is an unacceptable method of disposal.
7. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
8. The swimming pool at the rear of the site shall no be located any closer to the rear boundary
than 1 metre. The area between the pool and the boundary shall be landscaped in
accordance with Planning Scheme Policy 3 – Landscaping Plants and guidelines.
9. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
thus remaining as open structures.
10. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
Page 2 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00002385.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 80 KB (small file)
- File type
No other editions are linked here.