TOWN PLANNING FILE
GENERAL FILE

OTHER - as required ADS.jh
26th August, 80
A.D.Simes Ref: T.P.C. 1113

Alan Starkey and Associates,
126 Bulcock Street,

CALOUNDRA. 9. 4551

Dear Sirs,

Re: Resubs. 610,611 and 612 of Portion 28, Parish of Weyba
situated at the corner of Crank Street and Webi Street
Sunshine Beach ~ J.J. & T.M. Aho and Twaho Pty. Ltd.

I refer to your application and letter dated 6th March, 1980 and

to Council's decision in April, 1980 as advised by letter dated 2nd
May, 1980 that Council had resolved not to consider that application
as it was considered to be not substantially different from an
application dealt with by Council in February, 1980.

Following representation from Mr. Aho and yourself and the receipt
of an offer to contribute to the cost of sealing Crank Street
received by letter dated 31st July, 1980, Council, at its meeting
on the 20th August, 1980 gave further consideration to your
application to erect a multiple dwelling to comprise four (4)

units on the land described above. .

It was a decision of the Council that after considering all
relevant matters, the application as submitted be approved. The
conditions attaching to Council's consent are as shown on the
attached schedule and as set out below:-

Special Conditions

Rs: The layout approved is as depicted on the plans
accompanying your submission dated 6th March, 1980 as
varied by any other conditions or by the requirements of
Council's by-laws, policies or the Building Act and
Regulations.

B. Your offer to contribute the sum of $8,000 towards the
sealing of Crank Street as set out in a letter dated
3lst July, 1980 is accepted and such amount shall be
paid prior to the issue of a building permit.

Ce No part of the building is to project closer to the
alignment of the road truncation of Crank Street and Webb
Street than 4.5 metres and the proposed screen wall
depicted on the drawings that accompany the application,
on the alignment of the truncation at the intersection,
is not to exceed 1 metre in height from the finished
levels of the footpath or other apprtived level set by
the Shire Engineer. This will involve the deletion of
the open courtyard and associated roof and the northern
extremity of proposed unit no. 4.

Yours faithfully,

A.W.Dan.

Chiva C1arb
Full text of the other 1 page

Page 2

 

 

9.
10.

 

ii.

12.

13.7

14.

STANDARD CONDITIONS FOR MULTIPLE DWELLINGS

 

3,

 

Compliance with all relevant by-laws and policies. ty

Minimum disturbance to natural flora. No vegetation to be removed other
than that which would impede building operations. Where practicable,
re-vegetation to be carried out following cessation of building activity.

Permanent covered car parking to be provided on the site for four vehicles,
together with space sufficient for one visitors' vehicles. Areas on
which vehicles will be driven and/or parked to be provided with a

flexible or other pavement surfaced with bitumen seal coat, asphaltic or
other concrete properly constructed and maintained to good engineering
standards to the satisfaction of the Council's Engineer. Plans and
specifications for such areas including footpath crossings to be submitted
prior to issue of a building permit. Vehicular access to and from the site
to be designed so as to ensure that sufficient area is available for
manoeuvring and turning to permit forward movement to and from the road. »

A concrete invert and paved access to connect to the existing bitumen

road pavement to be constructed to the satisfaction of the Council's
Engineer. Footpaths are to be formed to finish levels to the satisfaction

of the Council's Engineer.

(a) Disposal of sewage and sullage wastes on site to the satisfaction of
Council. Designs to be approved prior to the issue of a building
permit.

20K

(2)-~-Gonstruction-of -a-sewage-and-subkbageholding-tank~to~the~satisfaction
of-Counctk.

OR
¢e}---Gonnect-ton--to-Gounci-'s--sewerage-system.
Connection to Council's water supply facility at the applicant's expense.

ta)}-~-Stormvater;--inecluding~that~from-roofed~and~paved~areas”to-be~dtsposed
“of -by~undergrowmrd means to ~Coutcit's”extsting”dtsposatfacttrities.

(b) Sederground car park to be drained by gravity to Council's existing

disposal facilities, to the satisfaction of the Shire Engineer.
Stormwater to be disposed of on site so as to cause no scour or

damage to adjoining properties.

No earthworks or filling are to be carried out on the site until the
requirements of the Council's Engineer have been obtained in writing.
Such requirements to be obtained prior to the issue of a building permit.

Comply with the reasonable requirements of the Regional Fire Safety Officer.

The approval given herein is for Town Plan Consent only and does not imply
either the issue of a building permit or Council consent to an application
under the Group Titles Act or Building Unit Titles Act.

In accordance with Clause 3 (2) of Part II of Council by-laws Chapter
XLIV (Town Planning), Council's approval is valid for a period of two
(2) years at the expiration of which period the Council may take action
to revoke its approval if in the opinion of the Council, substantial
progress has not been made in erecting the building or other structure
the subject of the consent permit; or the land, the subject of the
consent permit, is not being used substantially in accordance with the
purpose for which consent was granted.

A certificate of alignment to be submitted with the application for a
building permit and/or an identification survey to be carried out by an
authorised surveyor at the time of the foundation inspection.

To ensure compliance with any and all conditions of this approval, Council
will require that you enter into a Bank Bond to guarantee performance.

The value of such bond would be determined and would need to be lodged
prior to issue of a building permit and any costs incidental thereto will
be the applicant's responsibility.

The conditions of this consent are to be completed prior to occupancy of
the building and if this is not done, Council reserves the right to call
on bond moneys lodged to carry out the works involved.

Used in these records

About this file

File size
901 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

TPC1113.pdf · 901 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.