Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

IDAS form 6 - 61 Morinda Circuit Noosaville · OPW16/0220

Attached to the e-mail Operational works application OPW16/0220.

of 6

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Department of Infrastructure, Local Government and Planning

IDAS form 6

(Sustainable Planning Act 2009 version 3.1 effective 3 August 2015)

This form must be used for development applications for building work or operational work
assessable against a planning scheme.

You MUST complete ALL questions that are stated to be a mandatory requirement unless
otherwise identified on this form.

For all development applications, you must:
: complete [DAS form 1—Application details
* complete any other forms relevant to your application

° provide any mandatory supporting information identified on the forms as being
required to accompany your application.

Attach extra pages if there is insufficient space on this form.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009
(SPA) or the Sustainable Planning Regulation 2009.

This form must be used for building work or operational work relating on strategic port land
and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land
under the Airport Assets (Restructuring and Disposal) Act 2008 that requires assessment
against the land use plan for that land. Whenever a planning scheme is mentioned, take it
to mean land use plan for the strategic port land, Brisbane core port land or airport land.

| Mandatory requirements

le What is the nature of the work that requires assessment against a planning
scheme? (Tick all applicable boxes.)

 

Building work—complete _rerationa work—complete Table B)
Table A _

Table A
‘
a) Whatis the nature of the building work (e.g. building, repairing, altering, underpinning,
moving or demolishing a building)?

b) Are there any current approvals associated with this application? (e.g. material change

of use.)
No Yes— provide details below
List of approval reference/s Date approved (dd/ Date approval lapses (dd/

mm/yy) mm/yy)

 

 

Queensland
Government
Full text of the other 5 pages

Page 2

Department of Infrastructure, Local Government and Planning

Table B

a)

b)

c)

What is the nature of the operational work? (Tick all applicable boxes.)

Road works Stormwat Water infrastructure
er

_— —

Drainage works _ feartrwork >) Sewerage infrastructure
Vis )

Landscaping Signage Clearing vegetation under the planning
scheme

Other—provide

details
Is the operational work necessary to facilitate the creation of new lots? (E.g.
subdivision.)
No Yes—specify the number of lots
being created
Are there any current approvals associated with this application? (E.g. material
change of use.)
jo Yes—provide details below
List of approval reference/s Date approved (dd/ Date approval lapses (dd/
mm/yy) mm/yy)
What is the dollar value of the proposed building work? $245. OCO.0O
(Inc GST, materials and labour.) a

‘ ‘
What is the dollar value of the proposed operational work? $. . Le
(Inc GST, materials and labour.) C0 ,o79

Mandatory supporting information

4. Confirm that the following mandatory supporting information accompanies this
application
Mandatory supporting information Confirmation Method of
of lodgement
lodgement

All applications involving building work or operational work

IDAS form 6

Page 3

Department of Infrastructure, Local Government and Planning

Asite plan drawn to an appropriate scale (1:100, 1:200 or Confirmed wv -  .
1:500 are recommended scales) which shows the following: Emai

* the location and site area of the land to which the
application relates (relevant land)

* the north point

* the boundaries of the relevant land

* the allotment layout showing existing lots, any proposed
lots (including the dimensions of those lots), existing or
proposed road reserves, building envelopes and
existing or proposed open space (note: numbering is
required for all lots)

* any existing or proposed easements on the relevant
land and their function

* any access limitation strips

* all existing and proposed roads and access points on
the relevant land.

A statement about how the proposed development Confirmed

addresses the local government's planning schemes and

any other planning documents relevant to the application. NA

A statement addressing the relevant part(s) of the State Confirmed

Development Assessment Provisions (SDAP). Not
applicable

Applications for building work (including extensions and demolition that is
assessable development)

Floor plans drawn to an appropriate scale (1:50, 1:100 or Confirmed
1:200 are recommended scales) which show the following: | Not y~

* the north point applicable
* the intended use of each area on the floor plan (for
commercial, industrial or mixed use developments only)
* the room layout (for residential development only) with
all rooms clearly labelled
* the existing and the proposed built form (for extensions
only)
* the gross floor area of each proposed floor area.

Elevations drawn to an appropriate scale (1:100, 1:200 or Confirmed
1:500 are recommended scales) which show plans of all Not
building elevations and facades, clearly labelled to identify applicable

orientation (e.g. north elevation).
+

Plans showing the size, location, proposed site cover, Confirmed

proposed maximum number of storeys, and proposed Not.

maximum height above natural ground level of the applicable

proposed new building work.

Plans showing the extent of any demolition that is Confirmed

assessable development. Not
applicable

Applications for operational work involving earthworks (filling and excavating)

IDAS form 6

Page 4

Department of Infrastructure, Local Government and Planning

Drawings showing: Confirmed 7 -

° existing and proposed contours Not.
* areas to be cut and filled applicable
* the location and level of any permanent survey marks or
reference stations used as datum for the works
* the location of any proposed retaining walls on the
relevant land and their height
* the defined flood level (if applicable)
¢ the fill level (if applicable).

Applications for operational work involving roadworks

Drawings showing: Confirmed
* existing and proposed contours Not
applicable

* the centreline or construction line showing chainages,
bearings, offsets if the construction line is not the
centreline of the road and all intersection points

* information for each curve including tangent point
chainages and offsets, curve radii, arc length, tangent
length, superelevation (if applicable) and curve widening
(if applicable)

¢ kerb lines including kerb radii (where not parallel to
centreline) and tangent point changes (where not
parallel to centreline)

* edge of pavement where kerb is not constructed

* position and extent of channelisation

* location and details of all traffic signs, guideposts,
guardrail and other street furniture

* pavement markings including details on raised

pavement markers

catchpit, manhole and pipeline locations

drainage details (if applicable)

cross road drainage culverts (if applicable)

concrete footpaths and cycle paths

location and details for access points, ramps and invert

crossings

* changes in surfacing material.

Applications for operational work involving stormwater drainage

Drawings showing: Confirmed

* existing and proposed contours Not
* drainage locations, diameters and class of pipe, open _—PPlicable
drains and easements
* manhole location, chainage and offset or coordinates
and inlet and outlet invert levels
* inlet pit locations, chainage and offset or coordinates
and invert and kerb levels.

Applications for operational work involving water reticulation

|

‘

IDAS form 6

Page 5

Department of Infrastructure, Local Government and Planning

Drawings showing: Confirmed
° kerb lines or edge of pavement where kerb is not Not ~~
constructed applicable

¢ location and levels of other utility services where
affected by water reticulation works

pipe diameter, type of pipe and pipe alignment
waiter main alignments

water supply pump station details (if applicable)
minor reservoir details (if applicable)

conduits

location of valves and fire hydrants

location of house connections (if applicable)
location of bench marks and reference pegs.

eee ee eo oo

Applications for operational work involving sewerage reticulation

Drawings showing: Confirmed
* location of all existing and proposed services Not ./
* location of all existing and proposed sewer lines and applicable

manhole locations
* location of all house connection branches
° kerb lines or edge of pavement where kerb is not
constructed
chainages
design sewer invert levels
design top of manhole levels
type of manhole and manhole cover
pipe diameter, type of pipe and pipe alignment
location of house connections (if applicable)
sewer pump station details (if applicable).

Applications for operational work involving street lighting

Drawings showing: Confirmed
* location of all light poles and service conduits Not /

* location of all other cross road conduits applicable
* type of wattage and lighting

* any traffic calming devices

additional plans for roundabouts and major roads (if
applicable)

* details of any variations to normal alignment

* details of lighting levels.

Applications for operational work involving public utility services

Drawings showing: Confirmed

* any existing light poles and power poles Not \7%
* any existing underground services applicable
° details of proposed services

* alteration to existing services.

Applications for operational work involving landscaping works

IDAS form 6

Page 6

Department of Infrastructure, Local Government and Planning

Drawings showing: Confirmed

°

the location of proposed plant species Not |
a plant schedule indicating common and botanical applicable
names, pot sizes and numbers of plants

planting bed preparation details including topsoil depth,

subgrade preparation, mulch type and depth, type of

turf, pebble, paving and garden edge

the location and type of any existing trees to be retained
construction details of planter boxes, retaining walls and

fences

the proposed maintenance period

irrigation system details.

Privacy—Please refer to your assessment manager, referral agency and/or building certifier
for further details on the use of information recorded in this form. ,

 

OFFICE USE ONLY

Date Reference
received numbers

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure, Local
Government and Planning. This form and all other required application materials should be
sent to your assessment manager and any referral agency.

IDAS form 6

Used in these records

About this file

File size
4.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

IDAS form 6 - 61 Morinda Circuit Noosaville.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.