Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Appendix E v 2 - Revised Integrated Water Mangement Plan

Attached to the e-mail Revised Integrated Water Management Plan - MCU18/0009.

of 53

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

Callaghan & Toth
    Civil, Environmental &
    Hydraulic Engineers


[OCR of page images]
 

A_landscaped areas [M TCHMENT A_Villa4, 5 & &

e

‘3x 14,000 litre RWT

(CATCHMENT (C_Villa 3 [Mi

(CATCHMENT B.

Receiving Node - Tributary of Wooroi Ck

eG

CATCHMENT B_Cafe Roof [Mi rT
14, litre RV

Podium [Mi 8

& 14,000 litre RWT-

‘TCHMENTB_ Villa 1&2

Biopod 3.

(\TCHMENT D_Exposed Carpark Areas (eastern end) [M
Biopod 1

CATCHEMNT F-

CATCHMENT E_Existing driveway and 3 carparks [Mixed]

 

 

 

project

Callaghan & Toth | PROPOSED CARTWRIGHT VILLAGE MUSIC MODEL FOR
Civil, Environmental & | EXTENSION — CARRAMAR PROPOSED DEVELOPMENT

Hydraulic Engineers
8/41 Sunshine Beach Road 186 COOROY NOOSA ROAD,

woos ie 2305 TEWANTIN .
Ph: 54749081 Fax: 54749041 Fig ure 4.1

 

 

www.callaghanandtoth.com.au

 

Scale:NTS

 

 
Log in to download the original file

Appendix E v 2 - Revised Integrated Water Mangement Plan.pdf · 6.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.