Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Appendix E v 2 - Revised Integrated Water Mangement Plan

Attached to the e-mail Revised Integrated Water Management Plan - MCU18/0009.

of 53

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 31, section 1. The text section number identifies this passage in the reader.

The model set-up for the post-development scenario is shown in Figure 3, below.. The model structure
has 17 subareas. Subareas 1 to 10 represent areas other than the proposed roofs, whereas subareas 11 to
18 represent the proposed roofs. The runoff from subareas 11 to 18 are conceptually lumped together
before passing through a single conceptual detention volume , before being conjoined with the sum of
the runoffs from subareas 1 to 10.

The corresponding coding of the Urbs catchment file for this post-development scenario can be seen in
Appendix C hereto.



   NORTH
                                                                          1


                                                             11                 12
                                                           VILLA 5            VILLA 6
                                                                      2
   0             SCALE             50 m

                                                            3
   STORMWATER CATCHMENT BDY                                          13
   FOR PROPOSED EXTENSION                                         VILLA 4




                                                  4                  DB       OUT
                               5
                                                      14
                                                  VILLA 3

                         15
                         ENTRY
                 6                   7
                                    LANDSCAPED
                                    PODIUM

                                                  17         8
           9              16
                                               VILLA 2
                          VILLA 1

                                          10

                         COOROY - NOOSA ROAD

Figure 3:      URBS Model Layout For Post-Development Scenario

The pre-development and post-development models shared the same operating parameters – namely, an
alpha parameter of 2.0 and an m parameter of 0.80, with reach factor lengths varying from 1.9 to 2.5 in


                                                                                                Page 6
   Brisbane Stormwater Management Pty Ltd Document File: Carramar.Doc
Log in to download the original file

Appendix E v 2 - Revised Integrated Water Mangement Plan.pdf · 6.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.