Original source · versioned page text
Appendix E v 2 - Revised Integrated Water Mangement Plan
Attached to the e-mail Revised Integrated Water Management Plan - MCU18/0009.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 34, section 1. The text section number identifies this passage in the reader.
5.0 REFERENCES
1. Brisbane City Council, 1994 “URBS, The BCC Catchment Management Runoff Routing Model,
Version 3.3”
2. Noosa Council Planning Scheme Policies, 2015
3. Queensland Urban Drainage Manual, Third Edition, 2013
Page 9
Brisbane Stormwater Management Pty Ltd Document File: Carramar.Doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.