Appendix E v 2 - Revised Integrated Water Mangement Plan

Attached to the e-mail Revised Integrated Water Management Plan - MCU18/0009.

of 53

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 40, section 1. The text section number identifies this passage in the reader.

                        ecoAID®

                        Technical Data
                        Chamber Volume (m3)                             0.516m3

                        Min Installed Storage
                        (incl. 150mm rock bedding                       0.822m3
                        and cover layer) ps = 0.40
                        Chamber Physical Length                          1.00m
D
                        Chamber Installed Length                         0.97m
    B
                        Chamber Width                                    1.16m
                        Chamber Height                                   0.68m
                        Min Installed Storage Height
                        (incl. 150mm rock bedding                        0.98m
                        and cover layer)



                        LEGEND:
                            A.   ecoAID® EC1000 Chamber
                            B.   ecoAID® EC1000 End Cap
                            C.   bidim® A24 non-woven geotextile surround
                            D.   bidim® Filter Wrap (over C-A-R)
                            E.   40kN Woven geotextile (along base of C-A-R)

                            1.   Finished surface layer as specified by design engineer
                            2.   Backfill material as specified by design engineer
                            3.   20-50mm Ø drainage rock/RCC/scoria
                            4.   Subgrade
                            5.   150mm – 625mm Ø (OD) inlet pipe
                            6.   Connecting pipe network
        min < H > max
                            7.   Manhole inlet structure
                            8.   100mm – 150mm Ø optional inspection/ventilation pipe
                            9.   100 – 150mm Ø optional lateral equalisation pipes

                        * The rock component provides additional storage and it's porosity
                           (typically 40%) is used when calculating the tanks overall storage
                           capacity.
                        * The ecoAID® system can be installed in a single or double layer
                           configuration.
                        * Please refer to our ecoAID® standard detail drawings for more 		
                          information.




                           ecoAID® COVER REQUIREMENTS
                        NOT SUBJECT TO                     Hmin      Hmax
                        VEHICLE LOADING
                         eg - Public open space            300       2500
                        SUBJECT TO VEHICLE LOADING
                           not in roadway                  450       2500
                           in sealed roadway               600       2500
                           under unsealed roadway          750       2500
                        		
                         minimum required values                      maximum allowable values
Log in to download the original file

Appendix E v 2 - Revised Integrated Water Mangement Plan.pdf · 6.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.