Application Details - IDAS form 1

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

 

     

You MUST complete ALL questions unless the form indicates devel GpMAsnbGousrteyith ut all

necessary information and documentation will result in yourlapplication not being a properly made appli

. 12 MAR 2010
&
¥ 4 Tewantin

For all development applications, you must:
* complete this form (Application details - IDAS form 1)

. complete any other forms relevant to your application

 

. provide any mandatory supporting information identifie
application.

All terms used on this form have the meaning given i in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

 

cA 3? pede, Fash

sequen

 

 

\

 

 

@ricase note: If there is more than one applicant, Provide additional applicant details by clicking the "Add another
_ applicant! button below.

 

 

 

 

 

 

 

 

 

 

 

 

 

Names (individual or compeny naine in ful PILE-IT PTY LID "
For companies, contact name EMMA REED {
Postal address : PO BOX 299, NOOSAVILLE QLD 4566

Contact phone number 07 5474 3480

Mobile number (non-mandatory 0408 137 526

Fax number (non-mandatory) 107 474 3480 / ®
e-mail address (non-mandatory) [email protected]

 

 

 

1, What is the nature of development proposed? (tick all applicable boxes)"

 

 

 

 

 

 

 

Material change of use of premises
building work

operational work

OWOO

reconfiguring a lot

 

 
Full text of the other 17 pages

Page 2

CIO

2. What type of approval is being sought?

 

 

 

 

development permit
(1 preliminary approval
[1] both - provide details below

 

 

3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?

 

 

XX] No

[] Yes - comptete table A and then go to question 5

 

4. Location of the premises (complete-table.B and/or. tablé’C as applicable. Identify each lot in'a-separate row)..."

 

 

Table B - street address/iot for the premises or street address/lot on pian for the land adjoining or adjacent to the

 

 

 

premises
Street Address Lot on plan
” description
- Local government area
Unit | Street Street name and official Post | ot No Plan type (e.g. Logan, Cairns)
No. | No: suburb/locality name code 1 and plan no.
‘ SHOREHAVEN DRIVE sunshine coast regional
4 153 NOOSAVILLE 4566 {701 RPS907011 council

 

 

 

 

 

 

 

 

 

(]Street address / fot on plan

m Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay) *

 

 

 

 

 

 

Coordinates (note: placé each set of v ‘
coordinates in a separate row) Zone Datum Local government | ,
- 7 ~ - reference area (If applicable) :
Easting Northing Latitude | Longitude a
(] GDA94 : ' :
e 1 LJ] wese4 ‘ Vy dhe
[1] other -

 

 

 

 

 

 

 

 

 

 

5. Total area of the premises on which the development is proposed (indicate, hectares or m?)
763m2

6. Current use/s of the premises (e.g. vacant land; house, apartment building, cane farm;eté.). | 4, 7 =

 

 

 

 

 

 

4 |HOUSE

 

 

 

 

 

7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)

NEW TIMBER JETTY

 

 

 

 

Application Details - IDAS form 1
> Version 1.0 18 December 2009

Page 3

 

 

 

ats: ‘owner's: consent. Fequired. for.this.application? (refer to. notes at the. end of this form for more information),

 

 

[J No

[Yes - complete either table D, table E or table F as applicable

 

Table D (note: do not complete this table if lodging the application on-line using Smart eDA)

 

 

Name of owner/s of the land {CHRIS KRITZINGER 2 Wi

 

  

We, the above-mentioned owner/s of the land, consent

Wa of this application.

 

 
 

 

Signature of owner/s of the land

 

 

Date lfoxfre -

 

 

Table E

 

 

 

." Name: of owner/s of thé land, ”

 

[-] The owner's written consent is attached or will be provided separately to the assessment manager

 

Y 7

Table F

 

 

Name of owner/s of the land

 

 

. a "By. making this appli¢ation, I, the ‘applicant declare that the owner has given written consent to the making of
the, application. a . .

 

a

 

9. “Does the: aplication involve a state resource? e. g. the application invowves state land,or Tang quarry".
ie oh .
Oe gay

   

 

(]Yes - complete table G

 

 

 

 

ittify if any’of the following apply'to the premises (tick applicable Box/es) >» ede

 

 

—X] adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
[J _ on strategic port land under the Transport Infrastructure Act 1994 - complete table |

O in a tidal water area - complete table J

 

Table H Name of water body, watercourse or aquifer

 

4 |NOOSA WATERS CANAL

 

 

 

 

11. Are’ there. any existing easements on the Premises? (e.g. for vehicular access, electricity, overland flow,
. ws : eS th ge

 

 

 

 

 

[XJNo_ [{_] Yes - ensure the type, location and dimension of each easement is included in the plans submitted

 

" , Application Details, - IDAS form 1
Version 1.0 18 December 2009

 

Page 4

aa

 

12. Does:the proposal include new building work or operational work on the premises? (including any
- services) * ¥

 

 

[No {1 Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

 

13. Is the payment of a portable long service eave levy applicable to this application? (refer to the notes at the

 

end of this form for more information)

 

 

{X} No - Go to question 15 C Yes

 

15. Has the local government agreed to apply a superseded planning scheme to this application under

 

section 96 of the Sustainable Planning Act 20097 .--- e,

 

 

& No

LJ Yes - provide details below

 

16. List below all of resto forms and supporting information that accompany this application (include all IDAS

 

 

 

 

 

 

 

 

 

 

~ Description of attachment or title of attachment Method of lodgement to
m _ : * assessment manager
1. |FORM6 over the counter
2 | CHECKLIST over the counter
’ 3 |JOHN NORDEN PLANS over the counter
17. Applicant's declaration “a > kt mn

    

 

 

 

Sd By making this application, | declare that all information in this application is true and correct (note: it is
cs untawful to provide false or misleading information).

 

 

 

Application Details - IDAS form:1
Version 1.0 18 December-2009

Boe
oy
'

 

 

Page 5

ae , “al

ooo | "

Notes for completing this form

Question 8:
e Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required

for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.

e Owner's consent is not required for a mobile and temporary ERA.

Question 9:

¢ Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and, the evidence required, to support the application.

Quéstion 13: :

¢ = The Building and ‘Construction Industry: ‘(Portable Long Sérvice Leave) Act 1991 prescribes when the portable
long service: leave levy is payable. ,

* The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

, @rarestion 14:

e The portable jong service leave levy need not be paid when.the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development

_ permitisissued. |

° ‘Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.gleave.qld.gov, au. For further information contact QLeave on 1800 803 481 or www.gleave.aqld.gov.au.

 

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be. retained ‘ as § required, by’ the Public Records Act 2002.

 

OFFICE USE ONLY

 

 

 

 

 

 

Date received (>| 3 | 12 Reference numbers lo| 34 w : ‘y

 

 

@yorrication OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

 

 

 

 

. Council. | have been engaged as the private certifier for the
To: ran oe age
building work referred to in this application.
" {Date of BSA Certification Building
Name : eats
engagement | . _ |license number classification/s

 

 

 

 

 

 

 

Application Details - IDAS form 7. |
Version 1.0 18 December 2009

 

Page 6

OO

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Description of the work

QLeave Project
Number

Amount
paid ($)

Date paid

Date receipted
form sighted by |Name of officer who
assessment sighted the form

manager

 

 

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral

agencies.

 

 

"Application Details - IDAS form 1 Seal

 

 
 

Page 7

 

 

 

 

 

 

 

 

ri Se 28

 

Building or operational work assessable
against a planning scheme - IDAS form 6

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

 

This form must be completed for development applications for building work al work assessable against
a planning scheme. Deverspni ent Coun er

You MUST complete ALL questions unless the form indicates picaton Incomplete or t MAAR without all:

 

necessary information and documentation will result in your application not being a proper! rab ahlbatio
For all development applications, you must. 7 ¢ de
* complete Applicant details - IDAS form 1 a“ Tewa ntin

 
 

 

 

* complete any other forms relevant to your application

e provide any mandatory supporting information identified on the forms as being required to accompany your
application.

All terms used on this form have’ the ' meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009. : :

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994,

 

 

1. What is the nature’of the work that requires assessment against.a planning scheme? (tick applicable box/es)

 

 

Ol building work - complete table A’ X] operational work - compiete table B
- ene Ta 7 * .
Table B’ :

Y me

What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)

{[] road works C) stormwater XX] water infrastructure
§ (1) drainage Works (] earthworks ([] sewerage infrastructure “T. > co
(-] landscaping - E] signage (J clearing vegetation under the planning scheme ee

(J other - please specify below

What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)

X development permit. LJ preliminary approval [1] both - specify below

Is the operational work necessary to facilitate the creation of new lots? jag subdivision)

No L Yes - specify the number of lots being created

Are there any current approvals associated with this application? (e.g. material change of use)

—] No (J Yes - provide details below

 

 

 

 

 

 

 

 

 

 

Page 8

is
ed
4
¥
BS

 

OOO

 

 

2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ 11,242

 

 

 

 

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009

 

Page 9

LILO

 

3. Confirm the following mandatory supporting information accompaniés this application-—----—  —_. _. _.

 

Confirmation

of lodgement

Method of lodgement

 

All applications for operational works

 

site plans drawn to scale which show the following:

* the location and site area of the land to which the application relates
{relevant land)

s the north point

e the boundaries of the relevant land

e the.allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves,
building envelopes and existing or proposed open space (note:
numbering is required for alf lots)

Je any existing or proposed easements on the relevant land and their

function ,

any access limitation strips :

all existing and proposed roads and access points on the relevant land

XI confirmed

over the counter

 

statement about how the proposed development addresses the local

government's planning schemes and.any other planning documents

relevant to the application’ ” “ hen

E}ec confirmed

 

Applications, for operational works involving earthworks {filling ‘and excavating)

 

drawings showing:

. existing and proposed contours

*. areas to be cut and filled

"le" -the focation and level of any permanent survey marks or reference

 

 

position and extent of channelisation

location and details of all traffic signs, guideposts, guardrail and other
street furniture

pavement markings including details on raised pavement markers
catchpit, manhole and pipeline locations

drainage details (if applicable)

cross road drainage culverts (if applicable)

concrete footpaths and cycle paths

location and details for access points, ramps and invert crossings
changes in surfacing material

 

 

__, Stations used as datum for the works [confirmed
“Je “the location. of any proposed retaining: walls on the relevant land and
“their height” .
e the defined flood level (if applicable)
e the defined fill level (if applicable)
Applications for operational works involving roadworks
Aidrawings showing: .
¢: existing and proposed contours :
« the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points
e . information for each curve including tangent point chainages and
‘offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)
¢ kerb lines. including kerb radii (where not parallel to centreline) and ,
tangent point changes (where not parattel to centreline) “ ‘
edge of pavement where kerb is not constructed (confirmed :

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6

Version 1.0 18 December 2009

 

 

 

Page 10

oo Ol

 

Confirmation
of lodgement

Method of lodgement

 

Applications for operational works involving stormwater drainage

 

drawings showing:

existing and proposed contours

drainage locations, diameters and class of pipe, open drains and
easements

manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels

inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels

(| confirmed

 

Applications for operational works invoiving water reticulation

 

drawings showing: , Coon

kerb lines or edge of pavement where: kerb i is not constructed
location and levels of other utility services where affected by water
reticulation works

pipe diameter, type of pipe and pipe alignment _

water main alignments .

water supply pump station details (if applicable)

minor reservoir details (if applicable)

conduits

location of valves and fire hydrants

location of house connections (if applicable)

location of bench marks and reference pegs

‘{L_] confirmed . |

 

Applications for operational works involving sewerage reticulation

 

diawings showing:
“location of all existing and proposed services
' location of all existing and proposed sewer lines and manhole locations

location of all house connection branches

kerb lines or edge of pavement where kerb is not constructed
chainages

design sewer invert levels

design top of manhole ‘levels

type of manhole and manhole cover

pipe diameter, type of pipe and pipe alignment

location of house connections (if applicable)

sewer pump station details (if applicable)

[_]confirmed

 

Applications for operational works involving street lighting

 

eonpeeseee

 

drawings showing:

location of all light poles and service conduits

location of all other cross road conduits ©

type of wattage and lighting

any traffic calming devices

additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment

details of lighting levels

[]confirmed

 

 

 

 

 

Building and operational work assessable against a planning scheme - DAS form 6

Version 1.0 18 December 2009

 

Page 11

“a

 

 

 

 

 

 

 

 

 

 

 

oe Poe
Aare
ooo :
of lodgement Method of lodgement ~%
Applications for operational works involving public utility services
drawings showing:
« any existing light poles and power poles
« any existing underground services [Cleonfirmed
© details of proposed services
e alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
« -the location of proposed plant species
e aplant schedule indicating common and botanical names, pot sizes
and numbers of plants
e planting bed preparation details including topsoil depth, subgtade
preparation, mulch type and depth, type of turf, pebble, paving and (confirmed
garden edge
the location and type of any existing trees to be retained
¢ construction details of planter boxes, retaining walls and fences
‘the proposed. maintenance period
ie irrigation system details .
Notes for completing this form:
‘© This form can ‘also be used for development applications for building works or operational works assessable
. against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
Bo "mentioned, take it to mean the land use plan for the airport land.
na Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form. , won,
meg

OFFICE USE ONLY

 

 

 

Date Received Reference Numbers

 

 

 

 

 

 

g. Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.

tet

 

Building and operational work assessable against a planning scheme - DAS form 6
Version 1.0 18 December 2009

 

Page 12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operational Works - IDAS Checklist 4

(Sustainable Planning Act 2009, version 1.0, 18 December 2009) . 1 d MAR 2010

This checklist only appties when the development application seeks approval for bpefational “Fewa ni 4
You should complete all questions unless the checklist indicates otherwise. uA

All pian

yr Rate

 

 

 

 

 

 

Develcoment Counter

 

 

ning and development applications require applicants to complete the following:

e Applicant details --IDAS form 1

. any forms or mandatory supporting information identified as forming part of your application.

If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of
Infrastructure and Planning's website, www.dip.qid.gov.au.

The checklist and relevant sections do not need to be completed for applications relating only to building work

requirin

g assessment against the Building Act 1975.

 

Gan -General-questions

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.1. “ Ig the proposed operational work assessable under the planning scheme? ta .
(No /
. You must complete Building and operational work assessable against a planning scheme - IDAS
i] Yes form 6
° Continue on to question 1.3
1.3.. » Is any part of the premises located i in part ofa future state-controlled road or within 100 metres of a
_*_, State: -controlled road? poe Be : :
Ix] No ° It is recommended that you complete part 2 (starting from question 2.1) of this checklist.
(J Yes . It is recommended that you complete part 2 (starting from question 2.2) of this checklist.
1.4 Does State Planning Policy 2/02: Planning and Managing Development involving Acid Sulfate’ Soils
$ . apply to the development? °° * ee a . / .
{X] No
oO Yes . It is recommended that you complete part 3 of this checklist.
1.5 Is there any proposed opérational work for filling or excavation?
XJ No ° It is recommended that you complete part 4 (starting from question 4.5) of this checklist.
[J Yes ° It is recommended that you complete part 4 (starting from question 4.1) of this checklist.

 

 

 

 

 

 

 

 

 

Page 13

DIO

 

 

 

 

 

1. 6. Is any of the proposed operational work listed in-schedule. 12:of.the Sustainable Planning Regulation
4 2009 and does it exceed the specified threshold? Ft oe me een
i} No
Cre . This application requires assessment by the Department of Transport and Main Roads as a
s concurrence agency

 

 

 

Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, item 14

 

1.7 ‘ts any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation
_ «2009 and does it exceed thespecified threshold?

 

 

KX] No

 

. This application requires assessment. by the Dépariment of Transport and Main Roads as a
concurrence agency  ®

(7 Yes

 

 

 

 

Section reference:
e Sustainable Planning Regulation 2009, schedule 7, table 3, item 15

 

Istany; part of the premises’ in-an ‘interim, koala habitat ‘protection area a idefitified
_ Queensland Koala State planning regulatory brovisions (SEG Koala SPRP)?.." we

     

der: theiSouth Fast

  

 

 

BN

 

{tis recommended that you complete part 5 of this checklist.

Cy Yes’ |e

 

 

 

ny of. the: propesed. operational work associated with reconfiguring a lot and the: ‘reconfiguration i is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     
   

Water Act 2000; for taking or Interfering With: ‘water from a watercourse, ‘take, or spring (other. than.

. 1X} No
= Yes ° It is recommended that you complete part 7 of this checklist.
i {ls any of the proposed operational work for any thing. constructed or ‘installed. that allows, under the € r

( vor.from adam constructed ona ‘watercourse. or ‘lake? ‘ wo ag

 

 

X] No

- It is recommended that you complete part 8 (starting from question 8.8) of this checklist.

 

(1 Yes

 

It is recommended that you complete part 8 (starting from question 8.1) of this checklist.

 

AD tae

 

1412

Is any of the proposed operational work tidal’ work, other than excluded '
Sustainable Planning ‘Regulation’ 2009? on Vg ny ra

  

rk défiried under the ‘
me ES

 

 

 

{X] No

 

 

(Yes

 

It is recommended that you complete part 9 of this checklist.

 

 

 

Operational works - IDAS checklist 4 .
Version 1.0 December 2009 ‘ng

Page 14

LILI

 

113°

Is any of the operational Work proposed -to- be carried. out within a coastal management district?

 

 

—X] No

 

C1 Yes

* It is recommended that you complete part 10 of this checklist.

 

 

1.14

Is any of the proposed operational work for constructing or raising waterway barrier works under the
Fisheries Act 19947

 

 

X] No

 

(Yes

. {t is recommended that you compiete part 11 of this checklist.

 

 

 

ie

“4!

Was

,|s,any of the proposed perational work'to. be: ‘carried. out completely ‘ or partly within, a declared fish |
c habitat atea under the Fisheties'Act 19942) 4206s" 4. Mp 38 % :

      

   

 

 

—X] No

 

 

[Yes

 

 

 

 

 

 

 

(1 Yes .

 

It is recommended that-you complete part 13 of this checklist.

 

 

TAI:

Ree

  

\ Rivers. Act 2005? ° ee ey vt a

‘Is any ‘of the operational work proposed to'be carried out ina wild river area declared under the Wild.

 

 

 

 

 

 

 

 

 

° it is recommended that you complete part 14 of this checklist.

 

 

 

 

X] No

 

[7] Yes

° {t is recommended that you complete part 15 of this checklist.

 

 

 

Seinze State-controlled ‘roads: .. *: .,".

a a a
re

  

 

 

 

 

 

 

 

 

 

2.1. - Is'the proposed operational work for filling or excavating listed inthe. Sustainable Planning
” ‘Regulation: 2009 schedule: 14. and does it exceed the threshold or combined threshold?
—X] No ° End of part 2 of this checklist.
C1 Yes . This application requires assessment by the Department of Transport and Main Roads as a
concurrence agency. —_
. End of part 2 of this checklist. 8
Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2
Part 4 - Easements and Substations | '

 

 

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

¥

Loe tagt

 

 

Page 15

LL

 

 

Ltr

oi any y part “of the: premises subject-to.an.easement in favour of the holder.of Pipeline Licence Number
“4 issued under the Petroleum Act 1923 for the construction or >r Operation ‘of the Moonie to Brisbane ~~

strategic pipeline?

 

 

 

 

 

No e¢ * — End of part 4 of this checklist.
(Yes . This application requries assessment by the pipeline licence holder as an advice agency.
Section reference:

Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9(b) and 17

 

Part 8 - Taking. or interfering with water.

 

 

 

 

 

 

. You must complete Taking artesian or sub-artesian water - IDAS form 12.
. This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

for the construction of a referable dam as defined under the Water Supply (Safety © Yes 1 No
and Reliability) Act 2008
to increase the storage capacity of a referable dam by more than 10 per cent & Yes (0 No

 

 

 

If yes to any of the above you must complete Referable dam - IDAS form 16.

This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be asa
concurrence agency and you must give DERM a copy of the application

 

Operational works - iDAS checklist 4
Version 1.0 December 2009

 

 

a
4

 

Page 16

at!
“tes

ooo

Section reference: ~
. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4 4

° Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
° Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11
° Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering

with subartesian water as assessable)
Wild Rivers Act 2005, section 43A

. Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
artesian water)
. Relevant wild river declarations

Notes for completing this form:

e Applicant details - IDAS form 1 and Development application assessment - IDAS checklist 1 must be
completed for all development applications to be considered.
° The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

Privacy - please refer to the assessment manager for further details on the use of information recorded in
this form. sey tl

isclaimer:
g the Department of Infrastructure and Planning (DIP) believes that the information contained on this form ‘and
rovided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation : and application of the applicable
legislation to your circunistances. ’ Loa eg Lye, .

 

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
“ negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.

   

 

Operational works - IDAS checklist 4
“ Version 1.0 December 2009

 

Page 17

 

1Su nshine Coast - LAND USE SECTION FEES

Regional Council

 

CIVICA TYPE RECEIPT TYPE

SALE OF DOCUMENTS : .
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111

APPLICATION. FEES
Material Change of Use - Code/lmpact MCU

 

 

 

 

 

 

Consistent ~ ot 521
Inconsistent , 521
Assessment under Superseded Planning Scheme : . 521
. Modification to a Development Permit ‘MOB DP : _ §21
Extension of a Currency Period , oo , §21.
Lot Reconfiguration - Lo RECONFIG . 521
@ .. Bldg Work assessable against the PlanningSchemé ~~ = * . 521 .
PRE LODGEMENT REVIEW .
' Half Hour . ' : 522 :
One Hour — ; 522 "
ADVERTISING . oo :
+” Purchase Advertised Applications 523
JETTIES, oo, :
” Jetty Application Fee , 920 524
s+ JettyBond wore, . Seo -  ° 51
' . . r. / / ‘(Category 4)
BONDS m . '
a Performance Bond . : , , ’ 51
oo . (Category 9)
SEARCH FEE /
. Search of Land Use Section file : ‘ 112
@ Liquor Licensing Request “ 113
TOTAL $ '~2o
NAME: | Cee NM weerkzw aon
ADDRESS: Co bore Is J a, .
NOOSA HLe SHH : os
FILENO: — (o/ 3677 | __ pate: AS] 3 fro

 

RECEIPTNO: | GI SoC] “Signature of TP Officer: [PD Aree —<
AUTHORITY NO: , & )
iS23 Sorcha,

‘

IH] reve/ 2671 . . _

Page 18

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT

Details of Development

Consistent 1.0
Inconsistent 3.0

>

FEE CALCULATION

oF

 

OPERATIONAL WORKS
Details of Development |

FEE CALCULATION

 

 

 

 

TOTAL FEES

 

 

Used in these records

About this file

File size
884 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0367 - Op Works - Transport Type 5 [As Published].pdf · 884 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.