Council archive · source document
10/0367 - Op Works - Transport Type 5 [As Published] · 142010.367
LILO
3. Confirm the following mandatory supporting information accompaniés this application-—----— —_. _. _.
Confirmation
of lodgement
Method of lodgement
All applications for operational works
site plans drawn to scale which show the following:
* the location and site area of the land to which the application relates
{relevant land)
s the north point
e the boundaries of the relevant land
e the.allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves,
building envelopes and existing or proposed open space (note:
numbering is required for alf lots)
Je any existing or proposed easements on the relevant land and their
function ,
any access limitation strips :
all existing and proposed roads and access points on the relevant land
XI confirmed
over the counter
statement about how the proposed development addresses the local
government's planning schemes and.any other planning documents
relevant to the application’ ” “ hen
E}ec confirmed
Applications, for operational works involving earthworks {filling ‘and excavating)
drawings showing:
. existing and proposed contours
*. areas to be cut and filled
"le" -the focation and level of any permanent survey marks or reference
position and extent of channelisation
location and details of all traffic signs, guideposts, guardrail and other
street furniture
pavement markings including details on raised pavement markers
catchpit, manhole and pipeline locations
drainage details (if applicable)
cross road drainage culverts (if applicable)
concrete footpaths and cycle paths
location and details for access points, ramps and invert crossings
changes in surfacing material
__, Stations used as datum for the works [confirmed
“Je “the location. of any proposed retaining: walls on the relevant land and
“their height” .
e the defined flood level (if applicable)
e the defined fill level (if applicable)
Applications for operational works involving roadworks
Aidrawings showing: .
¢: existing and proposed contours :
« the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points
e . information for each curve including tangent point chainages and
‘offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)
¢ kerb lines. including kerb radii (where not parallel to centreline) and ,
tangent point changes (where not parattel to centreline) “ ‘
edge of pavement where kerb is not constructed (confirmed :
Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0367 - Op Works - Transport Type 5 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 884 KB (small file)
- File type
No other editions are linked here.