OPW12/2009 Development Application part 1 Application Letter & IDAS Form 1 and 6 and Checklist · OPW12/0009
Place barcode here 11111111
B0434562
THIS IS THE FIRST PART OF A
MULTIPLE PART RECORD
Checklist 1 Part / Of
(Please Circle)
Application number:
7
T-V&AMV3CS IAAfVNFORMATION MANAGFN1E•NTRF.CORDS MANAGENENICoauol of Records\FDRJ ISVduhi Put Record Cover Sheet FIRST PART do{
14
RECAVEO
02 25 JAN D12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 13 pages
Page 2
f Jla 000
I Integrated Development Assessment System form
Application Details - IDAS form 1
(Sustainable Planning Ad 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete this form (Application details - IDAS form 1)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Name/s (individual or company name in full) PILE-IT PTY LTD T/A NOOSA JETTY BUILDERS
For companies, contact name DANNY REED
Postal address PO BOX 299 NOOSAVILLE QLD 4566
Contact phone number 0408 137 526
Mobile number (non-mandatory)
Fax number (non-mandatory) 07 5474 3480
e-mail address (non-mandatory) [email protected]
11. What is the nature of development proposed? (tick all applicable boxes)
q material change of use of premises
q building work Development Counter
operational work
q reconfiguring a lot
2 0 JAN 2012
Tewantin
Department of Infrastructure and Planning QPIan 7
k Qoeernmend
Page 3
2. What type of approval is being sought?
® development permit
q preliminary approval
q both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
No
q Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Lot on plan
Street Address description
Local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Cairns)
Lot No
No.
No. No. suburb/locality name code and plan no.
sunshine coast regional
1
r. 19
q Street address / lot on plan
I Seamount Quay, Noosaville 4566 111 rp842151
council
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
re ference area ( If app li ca ble )
Easting Northing Latitude Longitude
q GDA94
q WGS84
1
q other
5. Total area of the premises on which the development is proposed (indicate hectares or m2)
950m2
6. Current usels of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
1 house
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
timber jetty Boatlift
Page 4
Iu
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
q No
Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land LF & P Robertson
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
Table E
Name of owner/s of the land
The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
By making this application, I, the applicant, declare that the owner has given written consent to the making of
q the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
® No q Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
on strategic port land under the Transport Infrastructure Act 1994 - complete table I
in a tidal water area - complete table J
Table H Name of water body, watercourse or aquifer
1 Noosa Waters Canal
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
No q Yes - ensure the type, location and dimension of each easement is included in the plans submitted
rplication Details - IDAS form 1
Version 1.018 December 2009
Page 5
12. Does the proposal include new building work or operational work on the premises? (including any
services) __
No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
® No - Go to question 15 Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
® No
0 Yes - provide details below
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
I
1 Form 6 over the counter
2 Checklist over the counter
3 John Norden Plans over the counter
17. Applicant's declaration
® By making this application, I declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).
Page 6
Notes for completing this form
Question 8:
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www gleave.gld.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave.gld.gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers Or
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
Council. I have been engaged as the private certifier for the
To:
building work referred to in this application.
Date of BSA Certification Building
Name
engagement license number classification/s
Page 7
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
)placation Details - IDAS form 1
Version 1.0 18 December 2009
Page 8
Integrated Development Assessment System form
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Applicant details - IDAS form 1
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
M building work - complete table A fl operational work - complete table B
Table A
What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?
jetty
What type of approval is being sought? (if you have indicated multiple works in the above question, please generate
another Table A to detail each approval request)
® development permit preliminary approval
Are there any current approvals associated with this application? (e.g. material change of use)
® No Yes - provide details below
2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ 18,500
Department of Infrastructure and Planning QPlan
Page 9
3. Confirm the following mandatory supporting information accompanies this application
Confirmation
Method of lodgement
of lodgement
All applications for operational works
site plans drawn to scale which show the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, confirmed over the counter
building envelopes and existing or proposed open space (note:
numbering is required for all lots)
• any existing or proposed easements on the relevant land and their
function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents q confirmed over the counter
Irelevant to the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing:
• existing and proposed contours
• areas to be cut and filled
• the location and level of any permanent survey marks or reference
stations used as datum for the works q confirmed electronic
• the location of any proposed retaining walls on the relevant land and
their height
• the defined flood level (if applicable)
• the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
• existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points
• information for each curve including tangent point chainages and
offsets, curve radii, arc length. tangent length, superelevation (if
applicable) and curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed q confirmed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
street furniture
• pavement markings including details on raised pavement markers
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material
itional work assessable against a planninu scheme - IDAS form 6
Version 1.0 18 December 2009
Page 10
l Confirmation
Method of lodgement
of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and
easements E] confirmed
• manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels
Applications for operational works involving water reticulation
drawings showing:
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments E) confirmed
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages confirmed
• design sewer invert levels
• design top of manhole levels
type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
L] confirmed
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of any variations to normal alignment
• details of lighting levels
planning scheme - IDAS form 6
Version 1.0 18 December 2009
Page 11
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving public utility services
drawings showing:
• any existing light poles and power poles
• any existing underground services Oconfirmed
• details of proposed services
• alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
• the location of proposed plant species
• a plant schedule indicating common and botanical names, pot sizes
and numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and confirmed
garden edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details
Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY
Date Received Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
perational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009
Page 12
Integrated Development Assessment System Checklist
Development assessment checklist - IDAS
checklist 1
(Sustainable Planning Act 2009, version 1.0 18 December 2009)
This checklist applies to the carrying out of development generally.
You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:
• whether you need to make a development application for the proposed development
• if a development application is required, the relevant IDAS forms you need to complete as part of your application
• whether you need to give a copy of your application to any referral agencies.
If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational
works - IDAS checklist 4, as applicable.
If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website at www.dip.gld.gov.au.
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
I Part I - General questions
1.1 Have you received a referral agency response in relation to this proposed development prior to making
an application?
No
To assist you in preparing your application, completing Referral agency responses - IDAS checklist
q Yes
6 is recommended
1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?
® No
You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
q Yes form 2 and give this notice to the relevant local government. If the local government agrees to
your request. details must be provided in Application details - IDAS form 1
1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
1notice is required under the Water Act 2000?
No
0 Yes It is recommended that you complete part 2 of this checklist
1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under,
the Queensland Heritage Act 1992?
® No
fl Yes It is recommended that you complete part 3 of this checklist
Department of Infrastructure and Planning QPlan
Page 13
1.5 Does the proposal involve development on a local heritage place?
® No
[] Yes It is recommended that you complete part 4 of this checklist
11.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
(activity or a chapter 5A activity?
X No
Yes It is recommended that you complete part 5 of this checklist
1 1.7 Is any part of the development on strategic port land or airport land (other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land
No
q Yes It is recommended that you complete part 6 of this checklist
11.8 Is any part of the development on land below a high water mark within the limits of a port under the
Transport Infrastructure Act 1994?
® No
q Yes It is recommended that you complete part 7 of this checklist
1.9 Is any part of the premises designated for community infrastructure?
FZ No
Yes It is recommended that you complete part 8 of this checklist
1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?
No
IF-1 Yes It is recommended that you complete part 9 of this checklist
1.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 1994?
® No
q Yes I It is recommended that you complete part 10 of this checklist
Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.
ment checklist - IDAS checkli
Version 1.0 18 December 2
Page 14
OFFICE USE ONLY
Date received Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.
Version 1.0 18 December 2009
Used in these records
OPW12/2009 Development Application part 1 Application Letter & IDAS Form 1 and 6 and ChecklistRelated documentApplication case desk ↗