4. Provide amended plans that remove the stairs to the roof as accessed from the
top level.
A drop-down ladder is only provided for maintenance access to the roof and solar panels.
Considering the harsh salt environment, cleaning of the panels will be required on a
regular basis. No balustrading is provided ontop of the building (for habitable rooftop
terrace use) and is only to be used for maintenance purposes, which will require
appropriate harnessing for Occupational Health & Safety reasons. In this regard, the
applicant is willing to accept a condition for maintenance use only.
5. Provide RPEQ certification that the proposed stormwater arrangement will not
create a worsening of stormwater conditions to any of the neighbouring
properties.
The RPEQ engineer provides a letter outlining that the proposed design will not create a
worsening of stormwater conditions to neighbouring properties (Council’s road reserve).
Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested. It is therefore requested that Council proceed with its
assessment of the development application at their earliest convenience.
If you have any further queries in relation to the above, please do not hesitate to contact
myself.
Regards,
Jack Lewis B.Sc Hons UNSW M.Plan Otago
Planner/Director
Pivotal Perspective Pty Ltd
Page 4 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
response to further advice Pitta.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.