Skip to the record
Noosa’s premier civic archive.

Council archive · source document

08/1193 - Operational Works - Access, Car Parking [As Published] · 142008.1193

of 53

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

@ Pes |S Mass lows WW OSKA

@ . - * Street address Lot on plan description Local government area (e.g
ri sweet Street Name and official suburtVlocality name one Lof No. Ak ih eon : tegen, Cais)
‘) | Q) WALSH LASS Keo
WSsh
AND/OR
Table C Coordinates and/or a map of the premises (Appropriate for develooment in remote areas, over part of a bt, in water (e.g. channel dredging in Moreton Bay) etc.)
Coordinates . j
zone Local governrnent area
_ (Nota: place each set of coordinates in a separate row} _ Reference Datum {if applicab fe)
Easting Northing Latitude Longitude
1. C) cpas4 (1 wese4
(J Other
Page 1

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

   

RECEIVED
~9 JUL 2008

Ee - owaatin
Frent Cosater

 
    
     

 

tho DAS Appteatn Fm fect, . This infonnation’ 8, relied upon b E , yr fon assessing sid

deciding this application eed this is ap lication, the Raplcen incor ; ponsibi A i the IPA ny develonment pont oF prakim nary
£.approval that may be Iss i 6 thes "

-Comparty or organisation name (if appicable) \auss | \oeen Roser \oass We

Individual applicant/Contact person (if thera is more than one applicant, provide adedonal applicant details.on an attachment t6 this form).

Tite Ww First nate. Drasrvyn rast 2 Osaccoan

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Contact telephorie huimber Gd.) ¥ > 2 | “vy Mobi phone number! —
‘Facsimile number. Ss tes de a VU &, % On. . e-mail address —

 

 

 

 

 

 

 

 

 

 

1. Identify the premises by completing Table A, or Table B andlor Ta Table C (ensure adequete infortion is given to identify the premises)
Table A it the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then goto 2

 

Name of each focal government area in which the mobile and temporary ERA is proposed'to, dperate

 

 

 

PRU

OR

 

 

TableB Street address for the premises (~ applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
() EJ Street address / lot on plan for the premises (Appropriate for most applications including building applications); or

(ii) (J) Street address Aot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water o. g. jetty, pontoon
efc) (Note: Lot on plan details may be obtained from title documents, a ‘Rate’ notice, of from the local government.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Full text of the other 52 pages

Page 2

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will nol involve any of the
following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)

 

Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (eg. river, creek, fake, cana)
; : : ‘Name of water body, watercourse or aquifer (if known) Sot

 

 

 

 

 

 

 

1. SLA.
Table E Complete if the premises are on Strategic Port Land under the Transport infrastructure Act 1994

i ___Lot on plan description for strategic portland _ ‘Port authority for the lot
1. —_—

 

Table F Complete if the premises are in tidal water

 

Name of local government for the tidal area (if applicable) Name of port authority for the tidal area (if applicable)

 

1. ————

 

 

 

 

 

3. _ Indicate the total area of the premises on which the development is-proposed: (Note: The total area may include land both above and below water)
Total area of premises (land on which the development is proposed) '

* FT {Ole hectares (~ apotcabie uniy

 

 

 

 

 

 

 

 

 

 

 

 

     

 

 

fatten nt oe Se ee - wee cnn a ene
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming efc.) /
BackQacesre  AOTTS S

 

5. Are there any existing easements on the premises? (eg. for vehicular access, electricity, overland flow, water etc.)
No Oo Yes ~ Ensure the type, location and dimensions of each easement are included in plans, submitted with the application

 

 

‘Proposal details

 

on mie tee we ee ese - oe

6. Brief description of the proposal: (e.g. 6 unit apartment building, 30 jot residential subdivision, a bore, aquaculture etc.)

¥ ms 2 =
LWE BWaae KL Wiaearsse DANE wWAY
7. Who. proposal include new building work or operational work (including any services) on the premises?
No Oo Yes ~ Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application

: he wire, nal
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involygS State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

No - Go to Q9 oO Yes - Complete Table G - provide details for each evidence required on @ Separete row, if applicable. Evidence of resource allocation or
entitiement must be submitted with the application. You do not need to answer Q9 - go to the next section.

 

 

 

 

  

Resource entitlement (if applicable) ~ further information is provided in the advice section al the end of the form

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nature of State-owned resource : |
Table G [Nature of evidence required
Allocation/entittement ws igs wr State Goverment Date of | Date oi
reference number Name of authorising officer Position of authorising officer Department issue_| expiry
1.
_-Quuner’s consent (eppcate)- futher irmaton is provident atice sectonaineendofttefimm se TT]

9. Complete Table H for applications involving a material change of use; Teconfiguration of a lot; work on land below high-water mark and not
within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport infrastructure Act 1994 - provide dotaits for each owner on a separate sow, or on an attachment fo this form if applicable.

Table H

 

Premises Owner's name/s Details of the premises owned
and postal address {street address or fot on plan description)

1 [SVE  ONGEAY aN HOLY
— SES SWisves FURS

Date consent
was oblained

SYUlOsO J 2o&

Owner's signature*

 

 

 

 

 

 

 

    

 

 

* Owners Signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provi j@ assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .

Page 2

.

Page 3

%
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

  
  

aan eined

1f incluclig infostiaton regi

   

_ Attachments and’Supporting, inforination’(Commpite Table !~ Use a separate row for eath type of aitactimeiit or

     

 

{his Par). Plaase ensure a documentation submited with tis fr Inlucing other Pats of Ft, oF owner's Consent, 6, are securdlyatacied to tis Prt of tho Form, =
Tabter | ‘Description of attachment or information Title ( applicable) . " Method of delivery fo
(08 CORO TOTEIONEN, Se ta ere? | (eg General Author, Janes SBeet Tre Rept) Date assessment manager

 

WAL

 

 

 

 

 

 

 

 

   

{Portable Long Service Leave (PLSL) levy (Appttabio for ceria bulthig and conshucton wart valled over SOB 00D) 8

Ve ed
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (box if appicable)
Li the application seeks a preliminary approval only; SAX
(1) the application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave)
Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for farming purposes:

land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or
controlling weeds or pests);

(all costs, that relate to the work both directly and indirectly, are less than $80,009, inclusive of GST:.or

(7 the work is being carried out under an owner-builder permit issued under the Queensi/and Building Services Authority Act 1991 -
Complete and submit a Qleave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be sighted by the
assessment manager before a development permit can be given.

@ 1. verment of a PLSL levy applicable to this application? (Refer fo Q10 and the Advice below for more information}
No - End of Part A J Yes - Answer Q12 beow

12. Has the’PLSL levy been paid?

(0 - (NOTE: An application can be lodged prior to payment of the applicable PLSL fevy. However, the fevy must be paid and the receipted form sighted by the
Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit a Notification
and Payment Form to QLeave.) .

O Yes - Complete Table L and submit, with the application, tie ‘yellow’ (Local Govemment's (Counci) / Private Certifier’s) copy of the receipted QLeave Form.

QLeave Project Number
(6 digits, starting witrA, B, E, L or PY

 

Table L - Amount paid | | Date paid

 

 

 

 

 

 

 

 

OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fee ($) Date received ons e Reference
e@ NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER ;
To: Council. | have been engaged as the private certifier for the building work referred to in this application.
Date of engagement ; Name SA Certification license number Building classification/s

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Amount paid : Date receipted form ;
Description of the work QLeave Project Number $) p Date paid sighted by * Name of officer who sighted the form
: . assessment manager > oo

 

 

 

 

 

 

 

 

 

Privacy Statement

The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legistation (including the Freedom of information Act 1992) or
as required by Pariament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.

 

 

 

 

Page 3

 

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

Advice for completing Part A (For more detailed advice, refer to IDAS Guide 1 (Making end IDAS pplication)

 

General advice

Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible for
answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The Assessment Manger
may refuse to receive an application that is not properly made.

The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building Act
1975 only, i.e. those applications requiring the completion of Parts A and B only.

 

.

Applicant details

lithe applicant is a company or organisation, a-contact person must be nominated. The applicant's signature is not required to be provided under the IPA,

 

°
.

Details of the premises

* The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act,

The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is

Situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.

Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only, Instead complete Table A.

The premises may be identified in a number of ways—

¢ Street address and lot on plan are most common and will apply to most applications.

* Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the premises
the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum such as

” Zone Reference or GS84 may be provided.

Strategic Port Land is within a local government area but a local government's planning scheme does not apply on Strategic Port Land. Strategic Port
Land is declared under the Transport Infrastructure Act 1994, For further information go to |IDAS Guide 11 (Development on strategic port land) and the
Queensland Transport (Ports) website.

‘Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is
defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water mark at spring tides)
establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless. provided for under the Local Govemme: I
Act 1993. Unless otherwise provided for by legistation, a local government has no jurisdiction below high water mark. A tidal area for strategic port land is
within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local govemment tidal area.
However, the IPA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal works within the local government tidal area,
and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work). .

 

Resource entitlement

Section 3.2,1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a prescribed State
resource. Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where evidence is
required to be given, and the evidence required to support the application, Link to Integrated Planning Reguiation. Section 3.2.1(10)(a}fi) states an
application cannot be taken to be properly made without the required evidence.

For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same time as the
request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.

For State-controlied roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette
notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.

Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection Agency for
quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark.

 

Owner’s consent

Section 3.2,1(3) of the IPA prescribes that an application must contain, or be Supported by, the written consent of the land owners, if the application
involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal
Protection and Management Act 1995; or work on rail corridor tand defined under the Transport Infrastructure Act 1994,

Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the
processes of the application or in the event of an appeal about the outcome of the application.

‘Owner’ for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the ren| }
for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

Templates are available from the [PA website for the provision of owner's consent as an attachment to this form. However other documentation may be used
for providing owner's consent provided it is clear the documentation relates to the development application for the premises.

Owner's consent, if required, must be provided even if the applicant is the owner. Owner’s consent is not tequired for a mobile and temporary ERA.

 

 

Portable Long Service Leave (PLSL) Levy
«The Building ‘and Construction Industry Portable Long-Service eave Scheme provides tong service feave entitlements to workers in-the. ‘building and -- -

construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the scheme, a Portable
Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out in Queensland, .

The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction industry (Portable
Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and
Construction industry Training Levy.

The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to the
PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines,
fences or earthworks, and works for subdividing, irrigating or draining land.

The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be Paid before a development permit may be issued.
The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be
completed on the QLeave website at www.gleave.ald.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web: www. qleave.qid.gov.au )

 

 

Page 4

Page 5

 

Naluteoftheworks ag

1. Nature of work that requires assessment ana a planning scheme:
(1) Building work - Complete Table A Operational work - Complete Table B
Table A

 

INTEGRATED PLANNING ACT 1997 , Part E, Version 3.1, 3 March 2008

eee

    

   
 

 

Building &/or operational work assessable against a p afining scheme 2008 be

iad .

 

 

 

(i) What is the nature of the building work made assessable in the planning scheme?

(ji) Are there any current approvals associated with this application? (e.g. material change of use)

 

 

 

 

 

 

 

 

 

CINo (1 Yes - Provide details below
List of approval reference/s Date approved Date approval lapses {if known)
[ 1.
Table B '
(i) What is the nature of the operational work made assessable in the planning scheme? ;
[Roadworks LC Stormwater (] Water infrastructure] Clearing vegetation under the planning scheme
(2 Drainage works  ([] Earthworks LO Sewerage infrastructure 1. WE WACL AX G«
C1 Landscaping DO Signage DJ Other - specify ‘SO ASHIAVAG SAT 18 BA

 

(iii) What type of approval is being sought? (NOTE: it you have indicated multiple operational works in question (i) above and your answers fo this question
would be different for different operational work, if may be more appropriate to provide these details in an attachment to this form}

C1 Development Permit LO Preliminary Approvat (1 Both (Specify below)
[Sew SSAU swe |

<
(iv) stp operation work necessary to facilitate the creation of new lots (ie. subdivision)?
No (7) Yes - Specify the number of lots being created

 

 

 

 

 

(v) Arg‘there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a fot)
No C1 Yes - Complete Table B(a)
Table B(a) TS 77 List of approval references _. _., |, .2Date approved”. “:] Date approval lapses (if known)

1.

 

 

 

 

 

 

 

 

 

 

2. Whatis the dollar value of this operational work? (ie. the fotal value including GST, materials and labour)

 

 

 

te oe PM f x

 

  

  
 

 

Configmation of lodgement| Method of lodgemerit

 

 

Plafig, and Specifications if applicable, showing the nature and location of thé proposéd works (etuding the
extent of any cut.end fil!" 7 ieee ao - Confirmed

 

 

 

 

OFFICE USE ONLY

 

fe ars.
Date received

 

 

 

 

 

ike

 

Advice for completing Part E

 

General advice

Part A must also be completed for all IDAS development applications, .
The applicant Is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

 

 

| A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur,

 

Page 1

Page 6

INTEGRATED PLANNING ACT 1997 IDAS Assesgment Checklist, Version 21.3, 9 May 2008

  

Form 1 Development Application

IDAS
Assessment Checklist

IDAS Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act
1997 IPA). Form 1 is made up of various Parts.

  
   
 

Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends on
the nature of the application.

Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.”

Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be completed
for all development applications except those proposed on land in an urban development area, or for building work requiring
assessment against the Building Act 1975 only.

For more information about development applications on land in an urban development area, refer to www.uida.gid.gov.au.
For more advice about building applications refer to Part B of the IDAS Application Form.

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or log onto the DIP website www.dip.qld.gov.au for help

 

For alt (OAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist

 

 

Z
Does the application seek approval to materially change the use of the premises? yes LI No
if yes ~ complete Section 2 of this checklist.
Does the application seek approval to reconfigure a lot? C1 Yes Fea/No

if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government. °

 

Does the application seek approval to carry out operational work? Yes LI Ne
if yes - complete Section 4 of this checklist.

 

Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? C] Yes Ao
Hf yes - complete Section 5 of tts checklist.

 

Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development (7) Yes | No
application?
if yes - complete Section 6 of this checklist.

 

Does the application seek approval to carry out building work requiring assessment against a local government C1 Yes BANo
planning scheme?

lf yes - complete Form 1 Part E. Assessment is by the local govemment.

 

Does the application seek approvat to carry out building work requiring assessment against the Building Act 1975? (J Yes No
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. Assessment is by a
building certifier.

 

 

 

 

 

 
  

  

RECEIVED
—9 JUL 2008

SCRE - Tewantin
Front Covnier

 
    

Page 1

   

Page 7

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

SECTION 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
HERITAGE

1.1A | Is any part of the proposafintended to be carsied out on a Queensland Heritage place under the Queensland Heritage Act 1992?
CI No - Go to.a1.18 Yes

if yes, has an exemption certificate for the proposal'.’ been issued under the Queensland Heritage Act 1992?
Yes No

If no, is the proposed work emergency work for the Queens/and Heritage Act 1992?
(11 Yes (1 No
Hino, is the work being carried out by the State?

Oo Yes oO No - (Complete Form 1, Part C;) This application requires assessment by the Environmental Protection Agency (EPA).
If EPA is not the Assessment Manager for the application, the EPA has jurisdiction as Concurrence Agency.

or LIP Avgwator somadue 2 tate fein ft ce mm NG fon ter

 

 

 
 

 

     

Hoa

 

‘pmecd

 

1.1B | Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered ina

Logal Heritage Register under Part 11 of the Queensland Heritage Act 1992?
No - Gotoar2

Oo Yes - (Complete Form 1, Past C2) This application requires assessment by the relevant local government against the IDAS Code in
the Queensland Heritage Regulation 2003. If the development involves building work and the local goverment is not the
Assessment Manager for the application, the local government has jurisdiction as Concurrence Agency.

ens 4, > AP ley 1 SON thy fon ta Ba

   
   

        

   

1,

g

REMOVING QUARRY MATERIAL; WILD RIVER AREA

1,2 | DggS the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 20007
No-Gotoar3 [] Yes

It yes, is an allocation notice required under the Water Act 2000?
CI No C1 Yes

If yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
Rivers Act 2005?

O No = (Complete Form 1, Part K;) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
. oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must reluse to receive i
(Complete Form 1, Part K;). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Subject to the declaration for the relevant wild river area, assessment is also requited for the purposes of the Wild Rivers Act 2005.

itle 8, der 1 IE Regutauen soued ne 2 table 2 ite OF Ip Ped ne A tert dw

 

 

      

yr Wales 4c! dt), vee Cs

 

 

 

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA

1.3 | Dogs the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
MNo- coarse  C)Yes

If yes, is any part of any ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005?
CNo

If no, is there a code of environmental compliance under the Environmental Protection Regulation 1998 for every aspect of each
proposed ERA?

O No - (Complete Form 1, Part G) This application requires assessment by the Administedng Authority, ft the Administering Authority is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to Q1.4
(1 Yes - Goto at.4

C1 Yes :

Ifyes, is any ERA an item 20 ERA (extracting rock or other material) intended to be located in waters?
C1 Yes .

If yes, will the application be accompanied by an allocation notice for that ERA, as defined under the Environmental

Protection Act 1994, section 73AA(9}?
O Yes - Uniess the application is consistent mth any property development plan applying to the land, and the application is accompanied by an
allocation natice, the Assessment Manager must refuse to receive it. (Complete Form 1, Part G). This application requires assessment by the
Administering Authority for the purposes of both the Environmental Protection Act 1994 and. subject to the declaration for the relevant wild river area,
the Wild Rivers Act 2005. Hf the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
oO No - An application for the ERA will be taken to be not propery made and the Assessment Manager must refuse io receive tt.

oO No - Answer the following question/s on the next page

 

 

 

 

 

'' In this IDAS Assessment Checklist. the term proposal refers to the praposed use, work or lot reconfiguration the subject of the application.

Page 2 .

Page 8

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA (cont)
If no, is any part of any ERA intended to be located in a high preservation area?

 

D Yes
If yes, is each proposed ERA one of the following?
{i} ERA, item 15 (sewage treatment) CJNo (Yes
(ii) ERA, item 16 (municipal water treatment plant) CINo (1 Yes
(ii) ERA, item 19 (dredging material) . (no (1 Yes
{iv) ERA, item 20 {extracting rock or other material) located outside waters and the [No (1 Yes

activity is a borrow pit of not more than 10,000m:for -
* — specified works under the Wild Rivers Act 2005; or
« — residential complexes, as defined under the Environmental Protection Act 1994

(v) ERA, item 22 ( screening etc. materials) and carried out outside waters and the activity CINo C) Yes
is for -
« — specified works under the Wild Rivers Act 2005; or
¢ for residential complexes, as defined under the Environmental Protection Act 1994

(vi) ERA, item 11 (crude oil or petroleum product storage) and the activity is - (No [1 Yes
« alevel 2 ERA; and
« for residential complexes, as defined under the Environmental Protection Act 1994; &
* carried out outside a designated urban area, as defined under the Wild Rivers Act
2005

(vil) An exempt environmentally relevant activity, as defined under Environmental Protection ([_]No.([] Yes.
Act 1994, in a designated urban area, as defined under the Wild Rivers Act 2005 :
If yes to any one of (i) - (vii) above - Unless the application is consistent with any property develapment plan applying to the land, and
the application is accompanied by an allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1, Part G). This
application requires assessment by the Administering Authority far the purposes of the Environmental Protection Act 1994. If the
Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Subject to
any limitations in the declaration for the wild river area and the Wild Rivers code, assessment is also required for the purposes of the Wild
Rivers Act 2005. In particular, ERAs 15 and 16 and an ‘exempt environmentally relevant activity’ do not require assessment for the
purposes of the Wild Rivers Act 2005 it the proposed is located in a designated urban area

If 10 to all of (i) ~ (vii) above - An application for the ERA/S will be taken to be not properly made and the Assessment Manager must
retuse to receive it
CNo

Ifo, is any ERA an item 20 ERA (extracting rock or other material) intended to be located outside waters?

Oo No - Unless the application is consistant with any property development plan applying to the land, and the application is accompanied by
an allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1, Part G). This application requires
assessment by the Administering Authonty for the purposes of both the Environmental Protection Act 1994 and the Wild Rivers Act
2005. Hf the Administering Authority is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence
Agency.

(J Yes

Ifyes, does the ERA meet the following?

{i} the activity is located inside a flood management area and a borrow pit of not CINo (] Yes
more than 10,000m? for -
« — specified works under the Wild Rivers Act 2005; or
« — residential complexes, as defined under the Environmental Protection Act 1994

(ii) the activity is located outside a flood management area (No Yes :

 

If yes to either {i) or (ii) above - Unies the application is consistent with any property development plan applying to the land, and
the application Is accompanied by an allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1,
Part G). This application requires assessment by the Administering Authority for the purposes of both the Environmental
Protection Act 1994 and, subject to the declaration for the relevant wild river area, the Wild Rivers Act 2005. If the Administering
Authogty is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

If no to both (i) and (ii) above - An application for the ERA will be taken to be not properly made and the Assessment manager must
: refuse to receive it.

AETIGS Sector TRS eg

 

 

 

 

 

Page 3

Page 9

 

 

INTEGRATED PLANNING ACT 1997 : IDAS Assessment Checklist, Version 21.3, 9 May 2008
WITHIN THE LiMITS OF A PORT
1.4 |ts amy part of the premises within the limits of a port under the Transport infrastructure Act 1994?

No-Gotoars ((] Yes
\f yes, is that part of the premises below high water mark?

{] No

LD Yes - ifanswers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8 - Answer (a} to (c) below. This application requires assessment by the Port Authority for the land. If you answer no to (a), (b) and
(c) below, the Port Authority for the Port has jurisdiction as Advice Agency.

{a) _ ls any part of the proposal within 200m of a shipping channel or an entry and exit shipping corridor for the Port?

 

 

CINo LJ Yes - The Port Authority tor the Port has jurisdiction as Concurrence Agency.
(b) Is any part of the proposal within 1,000m of a swing basin, a commercial fishing wharf, a mooring, anchorage or spoil grounds?
LI No LJ Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
(c) Is any part of the proposal within 1,000m of a planned port facility identified in a land use plan?
CINo LJ Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
OP Ragcstan scaled he & tere 13h fe
DECLARED FISH HABITAT AREA
15 Does any part of the premises adjoin a'declared fish habitat area under the Fisheries Act 1994?
No - Go f0 01.6

UO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8,
this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&-F is not the Assessment
Manager for the application, the agency has jurisdiction as Advice Agency.

IP Seg unaton sched 2 tate 2 ten oe

 

COMMUNITY INFRASTRUCTURE

 

 

 

 

 

 

1.6 egy part of the premises designated for community infrastructure?
No-Gotoat7 £} Yes
If yes, is the community infrastructure intended to be provided by a public sector entity?
[No Yes
it yes, is the land owned by or on behalf of the State?
(7 Yes (No
{fno, is the development for the following?
(i) For the designated purpose LINo [Yes
(ii) Carried out by, or on behalf of, the designator LINo (Yes
{fno to either or both (i) or {ii) above, is the proposed development assessable under the planning scheme?
[1 No (1 Yes - This application must be referred to the Queensland Govemment department administering the Act authorising the
development for the designation as Concurrence Agency.
weg. at wen 2 tee”
WASTE WATER MANAGEMENT
17

Dogs the proposal involve the establishment or expansion of a waste water disposal system?
RY No - End orSection1 [7] Yes

it yes, is any part of the disposal system proposed to be located in an area declared to be a catchment area under the Water Act 2000?
LLINo - End of Section! [_] Yes

If yes, is the proposed waste water disposal system an environmentally relevant activity (ERA) under the Environmental
Protection Act 1994?

(1 Yes - End of Section 1 CONo

tno, is the proposed development involving the waste water disposal system assessable under the planning scheme?

LI No - End of Section 1 (1 Yes - This application requires assessment by the Department of Natural Resources and Water (NRW) as
Concurrence Agency. End of Section 1

 

 

 

 

Page 4

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

SECTION 2 Section 2 must be completed when the application seeks approval to materially change the use of premises.

 

PLANNING SCHEME .

 

21

Is the proposed use assgésable under the planning scheme?

a No ~ Go to 02.2 Yes — Complete Form 1, Part 0 and answer 02.1.1 - 2.1.13 below
If yes, does the application request that the proposal be assessed against a superseded planning scheme?
LJ No C1 Yes - (Complete Form 1 Attachment 1)

 

STATE-CONTROLLED ROAD

 

2.1.1

 

Is phy part of the premises located in part of a future State-controlied road, or within 100m of a State-controlled road?
Yes
Ityes, is the use proposed in a future State-controlled road not defined by route?
Oj Yes - This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
oO No - This application must be referred to DMR as Concurrence Agency.

[No
itno, is the proposed use listed in schedule 5 of the Integrated Planning Regulation 1998 and dogs it exceed the specified threshold?

LINo C1 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

Sip SEO Re RE ee tar eas

 

ACID SULFATE SOILS

 

2.1.2

AcjA Sulfate Soils? :

Is the use proposed in a local government area listed2" in State Planning Policy 2/02: Planning and Managing Development Involving
af -Goro2t3 [Yes

If yes, is the natural ground level of any part of the premises less than 20m AHD?

LINo LD Yes
if yes, will the proposed use involve the following?
(i) Excavating more than 1,000m? of soil or sediment at or below 5m AHD (ino [Yes

(i) Filling the premises with 1,000m% or more of material with an average depth of 0.5m on land, soll [[]No [7] Yes
or sediment at or below 5m AHD

Hf yes to either or both (i) or (if) above - This appiication must be refered to the Department of Natural Resources and Water (NRW) as Advice Agency.

 

Lie) fm Su Ed mks eh ot

   

PAI fo. seper,
Ww AEG fo sere tee

 

COASTAL MANAGEMENT DISTRICT

 

2.1.3

Does the proposed use involve the following? .
(i) Carrying out operational work, completely or partly in a coastal management district Apo O Yes
(ii) Carrying out building work, completely or partly in a coastal management district, that is the : Ene Yes
construction of new premises with a gross floor area (GFA) of at least 1,000m? :
(ii) Carrying out building work, completely or partly in a coastal management district, that is the : : Ave ‘Oo Yes

enlargement of the GFA of existing premises by more than 1,000m2

If yes to any one of (i) — {ili} above - This appication must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.

     

Hecradu < hie tere

 

 

VEGETATION CLEARING

 

2.1.4

 

Do the premises include a lot containing the following?
(i) Acategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) Mao
(ii) {f there is no PMAY for a lot, remnant vegetation Ne

C1 Yes
lo §©6 1) Yes
It yes to either or both (i) or (ii) above, is the size of the premises 2ha or larger?

(LI No -Gotoa215 [_] Yes

If yes, is the existing use of the premises rural or environmental?
0 No Q Yes - (Complete Form 1, Part ¢) This application must be referred to the Department of Natural Resources and Water (NRW) as
Concurrence Agency.

 

 

 

Botgn tt

 

20 AW

rukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,

Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, !sis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Page 5

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

CONTAMINATED LAND - UNEXPLODED ORDNANCE

2.1.5 | Is ay part of the premises in an area for which an area management advice has been given for unexploded ordnance?
No - Go 10. 02.1.6 O Yes - (Complete Form 1, Part N} This application must be referred to the Administering Authority as Concurrence Agency.

” Has fates ert

et PASSENGER TRANSPORT
2.1.6 proposed use of premises listed is in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the specified
thr a

 

 

 

 

hold?
No - Go 10 02.1.7 u Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.

 

 

RAILWAY SAFETY AND EFFICIENCY
2.1.7 {Is the proposed use of premises listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the specified
th ff

 

old?
0 - Go to 02.1.8 O Yes - This application must be referred to Queenstand Transport (QT} as Concurrence Agency.

 

 

 

KOALA CONSERVATION

2.1.8 isfy part of the premises in a koala conservation area or koala sustainability area?
No-Gotoa219 (L] Yes

If yes, is the use for a domestic activity, as defined by the Environmental Protection Act 1994?

 

C1] Yes (No

If no, will the use result in the following?

{i) Clearing of native vegetation over an area greater than 2,500m? oO No : CJ Yes
(i) Anew building and any reasonably associated structure with a total footprint greater than 1,000r? No [[] Yes
(iii) An extension to an existing buitding and any reasonably associated structure if the [J No CJ Yes

extension has a total footprint greater than 1,000m?

(iv) Extracting gravel, rock or sand from an area greater than 5,000m2 No [Yes
(v) Excavating or filling an area greater than 5,000m? [CiNo [Yes
(vi) Additional traffic in a koala conservation area or koala sustainability area between No [Yes

6:00pm on a day and 6:00am on the following day

 

If yes to any one of Ht (vi) above - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.

1 Bling, RECA hee: he

EASEMENTS AND SUBSTATIONS
2.1.9 | Is the use associated with refonfiguring a lot?

 

 

 

(1 Yes - Go to 02.1.10 No - Answer both (a) and (b) below
{a) wyfary part of any structure or work that is the natural and ordinary consequence of the use, be located in an easement?
No C1 Yes - Answer both (i) and fil) below

(i) Is there an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 for a
transmission grid or supply network under that Act?
Oo No oO Yes - This application must be referred to the entity as Advice Agency.

(ii) Is there an easement in favour of the holder of pipeline licence number 1 issued under the Petroleum Act 1923 for
thefonstruction or.operation of the Moonie to Brisbane strategic pipeline under that Act?
No oO Yes - This application must be referred to the licence holder as Advice Agency.

{b) qn. part of the premises situated within 100m of a substation site under the Electricity Act 1994?
O) Yes - This application must be referred to the entity responsible for the substation as Advice Agency.

 

 

RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER AREA

2.1.10} Is Any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
No-Gowo21.t1 (Yes

 

If yes, is the proposed use for residential, commercial or industrial purposes outside a designated urban area, as defined by the
Wild Rivers Act 2005?

oO No oO Yes - Subject to the declaration for the wild river area, assessment by the local govemment is required for the purposes of the

 

 

 

 

 

 

Page6

Page 12

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

WETLAND

f

 

2441

(s the proposal only for te ghnstuction or use of a single residence on a lot and any reasonably associated building or structure?
(J Yes - Go to. 02.1.12 No

If no, do the premises include a lot situated in, or within 100m of, a wetland shown on the ‘Map of referable wetlands’?
C No Ol Yes - This application must be refered to the Environmental Protection Agency (EPA) as Advice Agency.

EPR A SO eT MI

 

HERITAGE

 

2.1.12

Do tHe premises include a lot sharing a common boundary with a Queensland Heritage place under the Queensland Heritage Act 1992?
0 - Go 0 02.1.13 oO Yes — This application mus! be referred to the Environmental Protection Agency (EPA) as Advice Agency.

iP Gequiavan, scheouls 2. ab'e 3 tam 22

 

 

CERTAIN PRELIMINARY APPROVALS

 

 

 

 

 

 

2.1.13 ipetiminry approval sought for the application under the iPA, section 3.1.6?
No - Go to. 02.2 Oo Yes - (Complete Form 1, Attachment 2) This application must be referred to the Department of Infrastructure and) Planning (DIP) as
Advice Agency.
PE see
BROTHEL
2.2

Isfre proposed use a brothel as defined under the Prostitution Act 1999?
No ~ Go to. 02.3 0 Yes

If yes, does one or more of the following apply?

(i) The land is in, or within 200m of the closest point on any boundary of, a primarily residential area []No (1 Yes
or an area approved for residential development or intended to be residential in character

(ii) The land is within 200m of the closest point on any boundary of land on which there is a CINo [1 Yes
residential building, place of worship, hospital, school, kindergarten, or any other facility or place
regularly frequented by children for recreational or cultural activities (measured according to the
shortest route a person may reasonably and lawfully take, by vehicle or on foot, between the, land proposed
for the brothel and other land)

(ii) The land is within 100m of the closest point of any boundary of land on which there is a residential []No ["] Yes
building, place of worship, hospital, school, kindergarten, or any facility or place regularly frequented
by children for recreational or cultural activities (measured in a straight line)

{iv) More than 5 rooms are proposed to be used for providing prostitution O No (Yes
{v) The land is in a town where the Minister for Police and the local government have agreed thatall -_]No [_] Yes
“applications for brothels in the local government area are to be refused

I yes to any one of (i) — (v) above - An application for a brothel must be refused by the assessment manager.

Hf no to all (i) - (v) above - (Complete Form 1, Part H) This aspect of the application is assessed by the local goverment for the purposes of the
Prostitution Act 1999,

ee

 

 

 

STRATEGIC PORT LAND

 

   

 

 

 

 

2.3 | Is afy part of the use proposed on Strategic Port Land under the Transport Infrastructure Act 1994?
No - Go 0 02.4 (1) Yes
It yes, is the proposed use inconsistent with the approved land use plan?
No O Yes - (Complete Form 1. Part i) This application must be referred to Queensland Transport (QT) as Concurrence Agency.
Me 8, Lar) Ge 2 tem 1 IP tes cape, se te 2 fem B
MAJOR HAZARD FACILITY
2.4 | Is fhe proposed use a major hazard factlity or possible major hazard facility under the Dangerous Geods Safety Management Act 2001?

 

No ~ Go to 02.5 O Yes - (Complete Form 1, Part L) This application requires assessment by the Department of Emergency Services (DES). if
DES is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

   

 

 

Page 7

Page 13

INTEGRATED PLANNING ACT 1997 ‘DAS Assessment Checklist, Version 21.3, 9 May 2008

 

CONTAMINATED LAND ~ REGISTERED LAND

 

25

ironmental Protection Act 1994?

Is any part of the land forming the premises on the Environmental Management Register or Contaminated Land Register under the
&
efi - Go to 02.6 0 Yes

If yes, does one or more of the following apply?
(i) A Suitability statement has been given and a site management plan has been approved for the LINo () Yes

proposed use of the land, and the proposed use involves only the following -
+ the fit-out of a building on the land; or
* minor site excavation, including for example, post holes for open-sided non-habitable ‘structures

“(ii) There is currently a notifiable activity on the land and the activity is continuing CINo : OC Yes

‘(ii), The proposed use is industrial and only involves minor site excavation (e.g. post holes for open-sided LINo -( Yes
non-habitable structures) ;

{iv) The land is used for a mining activity or petroleum activity No : C] Yes

If no to alt (i) - (iv) above - (Complete Form 1, Part N} This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IA SOM EE acd MEE PANG ote ratte aahtet etal!

 

 

CONTAMINATED LAND - NOTIFIABLE ACTIVITY

 

26

nofitiable activity?
No - Go to. 02.7 Yes
If yes, does one or more of the following apply?

(i) A suitability statement, removing the land from the environmental management register, hasbeen (] No ‘(_] Yes
given under the Environmental Protection Act 1994 for the existing use, or if there is no existing use,
the last use, and the following both apply -

* —nonew notifiable activity has occurred on the land since the suitability statement was issued;
«the land is not otherwise contaminated by a hazardous contaminant

(ii) A suitability statement has been given and a site management plan has been approved for the LIJNo (J Yes
proposed use of the land, and the proposed use involves only the following -

the fit-out of a building on the land; or
* — minor site excavation, including for example, post holes for open-sided non-habitable structures
(iii) The land is used for a mining activity or petroleum activity CJ No [1 Yes

rol part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for a

ifno to alt (i) - (ili) above - (Complete Form 1, Part N) This application requires assessment by the Environmental protection Agency (EPA). If EPA is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

 

OAT bMS BT: WP Flag

 

 

CONTAMINATED LAND - INDUSTRIAL ACTIVITY

 

27

 

Is ayly part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there is no
exjéting use was it last used for an industrial activity (other than for a mining activity or petroleum activity)?

 

No ~ Go 1002.8 (1 Yes
it yes, is the proposed use for child care, educational, recreationat or residential purposes {including a caretaker residence on
industrial land)?
No oO Yes - (Complete Form 1. Part N) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is
not the Assessment Manager for the application, it has jurisdiction as Concurrence Agency.
WE gerete8 & per", adie? PReypie crete! bie d en 22 .

      

 

 

Page 8

Page 14

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

CONTAMINATED LAND ~ AREA MANAGEMENT ADVICE (NATURAL MINERALISATION OR INDUSTRIAL ACTIVITY)
28 fe part of the premises in an area for which an area management advice has been given for natural mineralisation or industrial

 

agfivity (other than for a mining activity or petroleum activity)?
No - Goto 02.9 LJ Yes
If yes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence on
industrial land)?

Oo No oO Yes - (Complete Form 1, Part N) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is
not the Assessment Manager for the application, the agency has junsdiction as Concurrence Agency.

     

AQUACULTURE; WILD RIVER AREA
2.9 eke proposed use for aquaculture as defined under the Fisheries Act 1994?
No -Gotoo210 = (_} Yes
If yes, is any part of the aquaculture intended to be located in a wild river area declared under the Wild Rivers Act 2005?
CNo
If no, will the proposed aquaculture cause no discharge of waste into Queensland waters and be -
(i) of indigenous freshwater fish species listed in the Fisheries (Freshwater) Management Plan 1999, schedule 6; and
(ii) in a catchment listed in that schedule for that species for aquarium display or human consumption only; and
{iii) carried out in ponds, or using above-ground tanks, that have a total water surface area of no more than Sha
(Yes -Gotoa2.10 CL] No
, If no, will the proposed aquaculture cause no discharge of waste into Queensland waters, be of indigenous freshwater

fish for aquarium display or human consumption only, or nonindigenous treshwater fish for aquarium display only, and
carried out using only above-ground tanks that have -

(i) a floor area, excluding water storage area, of no more than 50m2; and

(ii) a roof impervious to rain water

D1 Yes -Got0a2.10 LNo
If no, will the proposed aquaculture cause no discharge of waste into Queensland waters, be of indigenous
marine fish for aquarium display only and carried out using only above-ground tanks that have a total floor area,
excluding water storage areas, of no more than 50m2?

oO Yes - Go to 02.10 oO No - (Complete Form 1, Part O:) This application raquires assessment by the Department of Primary
Industries and Fisheries (DPI&F), It DPI&F is not the Assessment Manager tor the application, the
agency has jurisdiction as Concurrence Agency. "

 

 

 

OC Yes
If yes, is any part of the aquaculture intended to be located in a wild river high preservation area?

] No - Unless the application is consistent with any property development plan applying to tha land, the Assessment Manager must refuse to
receive it. (Comptete Form 1, Part O,) This application requires assessment by the Department of Primary Industries and Fisheries
(DPI&F). Subject tp the declaration for the relevant wild river area, assessment may also be required for the purposes of the Wild Rivers
Act 2005. if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

oO Yes - An application for the aquaculture will be taken to be nat properly made and Ihe Assessment Manager must refuse to receive it.

 

bee S pratt) FioIe e F abs Fact 1990, in F6DA
4,

AGRICULTMRAL AND ANIMAL HUSBANDRY ACTIVITIES IN A WILD RIVER AREA
2.10 isfy part of the premises in a wild river area declared under the Wild Rivers Act 2005?

 

 

 

No - Go [email protected] Yes
It yes, is the proposed use for the following?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 0 No (] Yes
(ii) Animal husbandry activities as defined under the Wild Rivers Act 2005 (7 No {] Yes

if yes to either (i) or (i!) above, is any part of the premises in the high preservation area in the wild river area?
Yes - An application for the use will be taken to be not properly made and the Assessment Manager must refuse to receive it.

LD No .

if no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
O Yes - An application for the use will be taken to be not properly made and the assessment manager must refuse to receive it.

O No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part Q if agriculture). (Complete Part A if animal husbandry) Subject to the relevant deciaration for the
wild river area; this application requires assessment by the Department of Natural Resources and Water (NRW). It NRW is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

 

Se Wis Mevars AD

 

 

 

 

 

Page 9

Page 15

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

SEQ REGIONAL PLAN

2.11A isfy part of the premises within the-South East Queensland (SEQ) Regional Plan area?
No -Gotoa2118 [_] Yes

If yes, are the premises within one or more of the following areas?

 

* A Major Development Area in the Urban Footprint LINo [J Yes - (Answer {a} to (c) below)
« The Regional Landscape and Rural Production Area LI No LO Yes - (Answer {d) below)

© The Rural Living Area CINo  [) Yes - (answer (2) betow)

© The Investigation Area [No [) Yes - (Answer (t) and (g) below)

For the part of the premises within the Major Development Area (Questions (a) - (c))

(a) Does the application involve intensive animal husbandry as defined under the SEQ Regional Plan Regulatory Provisions?

Oo No oO Yes - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this
checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also}, This application must be
referred to the Department of infrastructure and Planning (DIP) as Concurrence Agency.

(b) Does the application invoive residential development involving a rural residential purpose as defined under the SEQ
Regional Plan Regulatory Provisions? .
(INo (1 Yes — The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this

checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also). This application must be
referred to the Department of Infrastructure and Planning {DIP} as Concurrence Agency.

' (c) Does the application involvevan urban activity as defined under the SEQ Regional Plan Regulatory Provisions?
CINo -Endot(a)-() (1) Yes

if yes, are the premises included in a structure plan as defined under the SEQ Regional Plan Regulatory Provisions?

Cl Yes

Ityes, does the IPA, section 3.1.6 apply to the application?

[] No - End of fo} (1 Yes - The SEQ Regional Plan makes this usa assessable under the planning scheme. (Ensure
Questions 2.1 in this checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be
answered also), This application must be referred to the Department of Infrastructure and
Planning (DIP) as Concurrence Agency.

LI No
If no, does the following apply?
“{i) Impact assessment is required under the planning scheme C1 No oO Yes
(i) The IPA, section 3.1.6 applies to the application [No £1 Yes
(iii) The premises exceed 10,000m? CINo [1] Yes
{iv) The gross floor area, as defined under the SEQ Regional Plan Regulatory (No (7 Yes

Provisions, on the premises will exceed 10,000m? -

If yes to any one of (i) - (iv) above - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure
Questions 2.1 in this checklist is answered ‘yes’, This requires Questions 2.1.1 ~ 2.1.13 fo
be answered also}. This application must be referred to the Department of infrastructure
and Planning (DIP) as Concurrence Agency.
For the part of the premises within the Regional Landscape and Rural Production (RLRP) Area (Question (d))
(d) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?
CL Yes

Wi yes, is every urban activity in the application excluded from being assessable for the purposes of the SEQ Regional
Pian in the RLRP Area?
O Yes - End of (0) O No - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Question 2.1

in this checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also). This application
must be referred to the Department of Infrastructure and Planning (DIP} as Concurrence Agency.

LINo
Ifno, does the application involve residential development involving a rural residential purpose as defined under
the SEQ Regional Plan Regulatory Provisions?
(No - Eng of (9) (Yes

If yes, are the premises located in the Mt Lindesay/North Beaudesert Study area?

oO No - The SEQ Aagional Plan makes this use assessable under the planning scheme. (Ensure Question 2.1 in this checklist is answered
yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also). This application must ‘be referred to the Department of
infrastructure and Planning (DIP) as Concurrence Agency.

i Yes - Goto the first question on the next page of this Checklist

 

 

 

 

Page 10

Page 16

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

SEQ REGIONAL PLAN

 

lf yes, are the premises in a zone or equivalent designated area mentioned in a notice published by the
regional planning Minister? .
(1) Yes - End of ¢} [_] No - The SEQ Ragional Plan makes this use assessable under the planning scheme. (Ensure Question
2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also).
This application must be referred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.

For the part of the premises within the Rural Living Area (Question (e))

(e) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?
(C1 No - End of fe) C1 Yes

If yes, is every urban activity in the application excluded from being assessable for the purposes of the SEQ Regional

Plan in the Rural Living Area?

(Yes - End of (e) (CI No - The sea Regional Plan makes this use assessable under the planning scheme. (Ensure Question 2.1
in this checklist is answered Yes’, This requires Questions 2.1.1 ~ 2.1.13 to be answered also). This
pplication must be referred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.

* For the part of the premises within the investigation Area (Question (f) - (g))
(f) Does the application involve intensive animal husbandry as defined under the SEQ Regional Plan Regulatory Provisions?
0 No -End of (f} QO Yes - The SEQ Regional Plan makes this use assessable under tha planning scheme. (Ensure Question 2.1 in this
Checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also). This application must be
relerred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.

{g) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?
C] Yes

If yes, is every urban activity in the application excluded from being assessable for the purposes of the SEQ Regional ,
Plan in the Investigation Area? :
(2 Yes - Gotoa212 [[] No - The SEQ Regiona! Plan makes this use assessable under the planning scheme. (Ensure Question 2.1 in
this checklist is answered ‘yas’, This requires Questions 2.1.1 - 2.1.13 to be answered also). This
application must be referred to the Department of infrastructure and Planning (DIP) as Concurrence Agency.

[] No

}f no, does the application involve residential development involving a rural residential purpose as defined under
the SEQ Regional Plan Regulatory Provisions?
CINo-Goto212 (1) Yes

It yes, are the premises located in the Mt Lindesay/North Beaudesert Study area?

No - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is

answered Yes‘, This requires Questions 2.1.1 - 2.1.13 to be answered also). This application must be referred to the Department :
of Infrastructure and Planning (DIP) as Concurrence Agency. .

(1 Yes

If yes, are the premises in a zone or equivalent designated area mentioned in a notice published by the
regional planning Minister?

C1 Yes - Go to 02.12 {_] No - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure
Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13
to be answered also). This application must be referred to the Department of
infrastructure and Planning (DIP) as Concurrence Agency.

 

 

 

 

 

Page 11

Page 17

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS)??
2.118 | Is avy part of the premises within a designated region under Schedule 1 of the draft regulatory provisions?
No-Gotoa212 {_] Yes

If yes, are the premises within one or more of the following areas?

 

«  Amaster planned area in the Urban Footprint [No [1] Yes - (Answer (a) to (c) betow)
* The Regional Landscape and Rural Production Area [No (1 Yes - Answer (a) below)

¢ The Rural Living Area CINo (1 Yes - (Answer (e) below)

© The Investigation Area [No [1 Yes - (Answer (f) and (g) balow)

For the part of the premises within a master planned area (Questions (a) - (c))

(a) Does the application involve an activity as defined under section 2.2(1) of the draft regulatory provisions?

No O Yes — The dratt regulatory provisions for the designated region make this use assessable under the planning scheme.
(Ensure Question 2.1 in this checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also).
This application must be referred to the Department of infrastructure and Planning (DIP} as Concurrence Agency.

{b) Does the application involve residential development involving a rural residential purpose as defined in Schedule 2 of
the draft regulatory provisions?
| No oO Yes - The draft regulatory provisions for the designated region make this use assessable under the planning scheme.

{Ensure Question 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also).
This Application must be referred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.

{c) Does the application involve an urban activity as defined in Schedule 2 of the draft regulatory provisions?
CINo -Endot(a}-() (] Yes

It yes, are the premises included in a structure plan as defined under IPA, Schedule 10

(Yes
Ifyes, does the IPA, section 3.1.6 apply to the application?
| No - End of (c} | Yes - The draft regulatory provisions for the designated region make this use assessable under the
planning scheme. (Ensure Question 2.1 in this checklist is answered ‘yes’ This requires
Questions 2.1.1 ~ 2.1.13 to be answered also). This application must be referred to the
: Department of infrastructure and Planning (DIP) as Concurrence Agency.
No
'f no, does the following apply?
(i) Impact assessment is required under the planning scheme {No ‘(1 Yes
: (ii) The premises exceed the number stated in section 2.1(b){ii) of the draft C)No CL) Yes
regulatory provisions

(ii) The gross floor area, as defined in Schedule 2 of the draft regulatory provisions, [] No [J Yes
on the premises will exceed the number stated in section 2.1(b)(iii) of the draft
regulatory provisions

If yes to any one of (i) — (iii) above - The craft regulatory provisions for the designated region make this use assessable under
the planning scheme. {Ensure Question 2.1 in this checklist is answered yes’. This
requires Questions 2.1.1 - 2.1.13 to be answered also). This application must be referred
to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.

For the part of the premises within the Regional Landscape and Rural Production (RLRP) Area (Question (d))
(d) Does the application involve an urban activity as defined in Schedule 2 of the draft regulatory provisions?
(Yes
If yes, is every urban activity in the application excluded from being assessable under section 2.4(2) of the draft
regulatory provisions?
(J Yes - End of (a) Oo No - The draft regulatory provisions for the designated region make this use assessable under the planning
scheme. (Ensure Question 2.1 in this checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13

to be answered also). This application must be referred to the Department of Infrastructure and Planning
(DIP) as Concurrence Agency.

(No

{fno, does the application invoive residential development involving a rural residential purpose as defined in
Schedule 2 of the draft regulatory provisions?

CI No - Eng of (a) UO Yes

 

 

 

 

22 State Planning Regulatory Provisions (Regional Plans) are the draft regulatory provisions

Page 12

Page 18

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.3, 9 May 2008

 

If yes, does the following apply?
(i) The development application or development application (superseded [3 No [] Yes
planning scheme) is properly made within two calendar years from the day
the draft regulatory provisions for the designated region took effect
(i) The premises is located in a zone listed in Schedule 1 Table 3 for the LINo [£) Yes
designated region
If no to either of (i) or (ii) above - The draft regulatory provisions for the designated region make this use assessable under the
planning scheme. (Ensure Question 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered
also). This application must be referred to the Department of infrastructure and Planning (DIP) as Concurrence Agency.
For the part of the premises within the Rural Living Area (Question (e)
{e) Does the application involve an urban activity as defined in Schedule 2 of the draft regulatory provisions?

CINo - End of fe) C Yes
If yes, is every urban activity in the application excluded from being assessable under section 2.8(2) of the dratt
regulatory provisions?

QO Yes - End of (e) O No The draft regulatory provisions for the designated region makes this use assessable under the planning
Scheme. (Ensure Question 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 -
2.1.13 to be answered also). This application must be referred to the Department of infrastructure and
Planning (DIP) as Concurrence Agency.

For the part of the premises within the Investigation Area (Question (f) - (9})
: (f) Does the application involve an activity as defined under section 2.14 of the draft regulatory provisions?
| No - End of (f) oO Yes - The dratt regulatory provisions for the designated region make this use assessable under the planning scheme.
(Ensure Question 2.1 in this checklist is answered yes’. This requires Questions 2.1.1 ~ 2.1.13 to be answered also),
. This application must be referred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.
(g) Does the application involve an urban activity as defined in Schedule 2 of the dratt regulatory provisions?
Yes
if yes, is every urban activity in the application excluded from being assessable under section 2.10(2) of the draft
regulatory provisions?

oO Yes - Go to 02.12 CO No - The draft regulatory provisions for the designated region make this use assessable under the planning
schame, (Ensure Question 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to
be answered also). This application must be reterred to the Department of Infrastructure and Planning (DIP)
as Concurrence Agency.

CI No
If no, does the application involve residential development involving a rural residential purpose as defined in
Schedule 2 of the draft regulatory provisions?
CINo -Got00212 (] Yes
If yes, does the following apply?
{i) The development application or development application (superseded CINo (1 Yes
planning scheme) is properly made within two calendar years trom the day
the draft regulatory provisions for the designated region took effect . :
(ii) The premises is located in a zone listed in Schedule 1 Table 3 for the CINo D)Yes ':
designated region :

If no to either of (i) or (ii) above - The draft regulatory provisions for the designated region make this use assessable under the
planning scheme. (Ensure Question 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered
also). This application must be referred to the Department of infrastructure and Planning (DIP) as Concurrence Agency.

 

Hy aenget ig 3A

 

She Pane ng Reguelon Pov sige s (Begiong! Banco

 

 

 

Page 13

Page 19

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.3, 9 May 2008

 

 

 

 

 

 

 

CONSERVATION ESTATE
2.12 ie proposal for urban purposes, as defined under the IPA?
No -Goo213  [] Yes
If yes, is the use proposed on a lot situated in, o within 100m of. any of the following?
(i) A protected area, forest reserve, critical habitat or area of major interest under the Nature Conservation [No [1 Yes
Act 1992
{ii) A State forest or timber reserve under the Forestry Act 1959 LCINo () Yes.
(iii) A marine park under the Marine Parks Act 2004 LINo [1] Yes
(iv) A recreation area under the Recreation Area Management Act 1988 LINo (Yes
_(v) Aworld heritage area listed under the World Heritage Convention No D1 Yes.
(vi) Brisbane forest park under the Brisbane Forest Park Act 1977 (No [1] Yes
If yes to any one of (i) - (vi) above - This application must be referred to the chief executive under the relevant Act mentioned as Advice Agency.
i Pee ened 2 fade. ter af
REMOVAL /DESTRUCTION OR DAMAGE OF A MARINE PLANT
2.13

Oges the proposed use involve the removal, destruction or damage of marine plants under the Fisheries Act 1994?
No End of Section2 {_] Yes
If yes, is the proposed operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b} below)
(i) The removal, destruction or damage of dead marine wood on unallocated State land, other than ina LINo (Yes.
wild river area, for trade or commerce :
(ii) The maintenance of existing structures, including, for example, the following structures, if they were | [[]No [] Yes
constructed in compliance with ail the requirements, under any Act, relating to a structure of that type -
* boat ramps, boardwakks, drains, fences, jetties, roads, safety signs, swimming enclosures and weirs;
+ existing drainage structures;
« existing powerlines or associated powerline infrastructure
{iii} Educational or research purposes or for monitoring the impact of development on marine plants (No (7) Yes
(iv) The construction or placement of structures, including. for example, swimming enclosures, safety signs, aids [_]No [_] Yes
fo navigation, fences, pontoons, public boat ramps and pipelines, if-
+ the extent of the removal, destruction or damage is minor; and
+ the structures were constructed in compliance with all the requirements, under any Act, relating to a
structure of that type

(v) The construction of runnels for mosquito control, removal of Lyngbya, seed collection for site rehabilitation or {"] No (_] Yes
the collection of marine plants for fishing bait, or handicraft

(a) {f yes to one or more of (i) — (v) above, does all of the proposed operational work comply with any applicable Department
of Primary Industries and Fisheries (DPI&F) self-assessable code?
LJ Yes - A permit is not required for that aspect of the proposed operational work. End of Section 2 CI No - Go to (6)

(b) tf no to all of {i) — (v) or no to (a) above, does a development permit exist for that proposed operational work?
(J Yes - End of Section2 [J No

Ifn0, has approval been sought in a separate application?

oO Yes - End of Section 2 Ol No - This application is aiso taken Io be an application for operational work for removing, destroying or
damaging marine piants under the Fisheries Act 1994. (Complete Section 4 of this checklist).

 

 

 

 

 

Page 14

Page 20

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.3, 9 May 2008

SECTION 3 Section 3 must be completed when the application seeks approval to reconfiguring a lot. 72 s+

 

Rebuutt tabia’

 

STATE-CONTROLLED ROAD

 

3.1

ey part of the premises located in part of a future State-contralled road, or within 100m of a State-controlled road?
No

Ifno, is the proposed reconfiguration listed in Integrated Planning Regulation 1998, schedule 5 and does it exceed the threshold?

O No CJ Yes - The application must be referred to the Department of Main Roads (DMR) as Concurrenoe Agency.
CJ Yes
It yes, will the proposed reconfiguration result in the following?
(i) An increase in the total number of lots LINo (1 Yes
(ii) An increase in the total number of lots abutting the State-controlled road LI No CI Yes

{yes to either or both (i) or (ii) above, is the reconfiguration proposed in a future State-controlled road not defined by route?
Q Yes - This application must be referred to the Department of Main Roads (MR) as Advice Agency
Ol No - This application must be referred to OMR as Concurrence Agency.

I Sageats: poneccie® tute tae IPB wn?

Se te Atha

 

 

COASTAL MANAGEMENT DISTRIC

 

 

 

 

32 A9ery part of the premises within a coastal management district?
No - Go 0.03.3 oO Ye - This application must be referred to the Environmental Protection Agency (EPA) as Concurence Agency.
Phege anon sseage L ? ten’
VEGETATION CLEARING
3.3 | Do the premises include a lot containing the following?

()  Acategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) , (] No OO Yes
(ii) If there is no PMAV for a lot, remnant vegetation (No O Yes

If yes to either or both {i} or (ii) above, are 2 or more lots proposed to be created?
(No -Gotoas4 [] Yes’

If yes, is any lot, before the proposed reconfiguration, 2ha or larger?
LINo-Gotoaae 7] Yes

Ityes, is the size of any lot proposed to be created, 25ha or smaller?

Cl No - Go 0 03.4 O Yes - (Complete Form 1, Part J} This application must be referred to the Department of Natural Resources
and Water (NRW} as Concurrence Agency.

 

 

 

Is any part of the premisegsubject to an easement?
[INo-Gotass — f¥] Yes - Answer both (a) and {b} below

rif or supply network under that Act?

(a) Js thgre an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 for a transmission
wf
No Oo Yes - This application must be referred to the entity as Advice Agency.

conétruction or operation of the Moonie to Brisbane strategic pipeline under that Act?

{b) sole an easement in favour of the holder of Pipeline Licence Number 4 issued under the Petroleum Act 1923 for the
No O Yes - This application must be referred to the licance holder as Advice Agency.

IP Reguation. schedule 2. table 2, tem 20ta) feecincty easement, [P Regulation sonedule 2. table 2. rem 32 (pipeline easement)

 

ELECTRICITY SUBSTATIONS

 

35

 

's Any part of the premises situated within 100m of a substation site under the Electricity Act 1994?
No - Go 0 03.6 O Yes - This application must be referred to the entily responsible for the substation as Advice Agency.

 

 

 

 

Page 15

Page 21

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

CONTAMINATED LAND - REGISTERED LAND

 

3.6

Enffronmental Protection Act 1994?
No-Gowoa7 () Yes
It yes, does one or more of the following apply?

(i) A suitability statement has been given and a site management plan has been approved for the CINo [1 Yes
proposed use of the land, and the proposed use involves only the following -
+ _ the fit-out of a building on the land; or
* minor site excavation, including for example, post holes for open-sided non-habitable structures

{ii} There is currently a notifiable activity on the land and the activity is continuing CiNno (Yes

(ii) The proposed use is industrial and only involves minor site excavation (e.g. post holes Yor open-sided [L]No (_] Yes
non-habitable structures)

ef part of the land forming the premises on the Environmental Management Register or Contaminated Land Register under the

If no to all of (i) - {iii) above - (Complete Form 1, Part N) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is
N6t the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

I Regie ot te nae

 

 

CONTAMINATED LAND ~ NOTIFIABLE ACTIVITY

 

3.7

notable activity?

oe of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for a
No-Gotoa3s (1) Yes

If yes, does one or more of the following apply?

(i) A suitability statement, removing the land from the environmental management register, has been CINo [1 Yes
given under the Environmental Protection Act 1994 for the existing use, or if there is no existing use, .
the last use, and the following both apply -
* no new notifiable activity has occurred on the land since the suitability statement was issued;
+ _ the land is not otherwise contaminated by a hazardous contaminant

(ii) A suitability statement has been given and a site management plan has been approved for the CINo [] Yes
proposed use of the land, and the proposed use involves only the following -
« the fit-out of a building on the land; or
+ minor site excavation, including for example, post holes for open-sided non-habitable ‘structures

It no to both (i) and (ii) above - (Complete Form 1, Part N} This application requires assessment by the Environmental Protection Agency (EPA). If EPA
. iS not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

sche

 

 

CONTAMINATED LAND ~ INDUSTRIAL ACTIVITY

 

38

io Axisting use was it last used for an industrial activity (other than for a mining activity or petroleum activity)?
No-Gotoaa9 [J Yes

If yes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence on industrial land)?
oO No oO Yes - (Complete Form 1, Part N) This application must be reterred to the Environmental Protection Agency (EPA) as Concurrence Agency.

wf part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there is
n

 

 

 

CONTAMINATED LAND ~ AREA MANAGEMENT ADVICE (NATURAL MINERALISATION OR INDUSTRIAL ACTIVITY)

 

3.9

actfMity (other than for a mining activity or petroleum activity)?
No-Gotoa310 {_] Yes

tyes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence on industrial land)?
oO No O Yes - (Complete Form 1, Part N) This application must be referred the Environmental Protection Agency (EPA) as Concurrence
Agency.

ls any part of the premises in an area for which an area management advice has been given for natural mineralisation or industrial

  

I Beagesat i

 

 

 

CONTAMINATED LAND - AREA MANAGEMENT ADVICE (UNEXPLODED ORDNANCE)

 

3.10

 

 

Is pA par of the premises in an area for which an area management advice has been given for unexploded ordnance?
No - Go to 03.11 Oo Yes: (Complete Form 1, Part N) This application must be referred to the Environmental Protection Agency (EPA) as
Concurrence Agency.

 

 

 

 

Page 16

Page 22

INTEGRATED PLANNING ACT 1997 iDAS Assessment Checklist, Version 21.3, 9 May 2008

 

SEQ REGIQHAL PLAN

341A isfy part of the premises within the South East Queensland (SEQ) Regional Plan area?
No -Goto.03.118 [1] Yes

It yg, is the application seeking approval for subdivision? '?
No -Go1003.12  ([] Yes - Answer both (a) and (b) below

 

the ZEQ Regional Plan Regulatory Provisions?
No- Goto) [] Yes

If yes, indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if appkcabie)

(a) inp of the premises located within a Major Development Area and not included in a structure plan as defined under

The subdivision:
{i) Creates lots with a size greater than 100 hectares LJNo [Yes
(i) Creates a residual lot CJNo [J Yes
(ii) Creates the same number or fewer lots than the number of lots being subdivided CIJNo [Yes
(iv) Creates a single additional {ot when an existing lot is severed by a road that was CINo [1] Yes
gazetted before 2 March 2006
() Creates a single additional lot for an emergency services facility CINo LlYes
{vi) Creates a single additional lot for a water cycle management infrastructure LINo (C1 Yes
‘(wii Creates a single additional lot for waste management facility oe O No ‘og Yes
(vill) Creates a single additional lot for telecommunications infrastructure LINo (Yes
(ix) Creates a single additional lot for electricity infrastructure [No (Yes
(x) Creates a single additional lot for cemetery or a crematorium CINo [) Yes

(xi) Is carried out in association with a development approval for a material change of use of [_]No [} Yes
premises that has not lapsed, if the development approval was for a development
application that was made before 31 October 2006

{xii) Is carried out in association with a development approval for a material change of use of [_]No '(] Yes
premises that - '
* was given for development made assessable under SEQ Regional Plan Regulatory
Provisions, section 2.1 or 2.2; and
+ — has not lapsed

(xiii) Creates lots fora purpose or is being carried out in association with development other _(_]No (] Yes
than those stated in (i) - (xii) above

If yes to other development under (xiii) above - This application must be referred to the Department of Infrastructure and Planning
{OIP) as Concurrence Agency. Answer (b) on the next page of this Checklist

 

 

 

 

31 For tha purposes of the SEQ Regional Plan, subdivision means — {a) creating a lot by subdividing another tat; or (b) dividing land into parts by agreement (other than a lease for a
term, including renewal options, not exceeding 10 years) rendering different parts of a lot immediately available for separate disposition or separate occupation}

Page 17

Page 23

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

SEQ REGIONAL PLAN (cont)

(b)_ Is any part of the premises within the Regional Landscape and Rural Production Area or in the Investigation Area?
No-Gota312 (1) Yes - Answer (ij - (ii)

 

(i) _ Is any part of the premises located in a rural precinct or an interim rural precinct and is any jot resulting from the
subdivision proposed to have a fot size smaller than the minimum stated in the relevant planning scheme for the
precinct?

[No - Goto (iif (] Yes - Complete Table 1

TABLE 1 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if applicable}

The subdivision:

(i) Creates a residual lot CINo (Yes
(ii) Creates the same number or fewer lots than the number of !ots being subdivided oO No a Yes
(iii) Creates a single additional lot when an existing lot is severed by a road that was gazetted before2 []No [_] Yes

March 2006 ,

{iv) Creates a single additional lot for an emergency services facility LINo (] Yes
{v) Creates a single additional lot for a water cycle management infrastructure [No [Yes
(vi) Creates a single additional lot for waste management facility LINo (1 Yes
(vil) Creates a single additional lot for tetecommunications infrastructure CINo (Yes
(viii) Creates a single additional tot for electricity infrastructure . LINo (7 Yes
(ix) Creates a single additional lot for cemetery or a crematorium LI No a Yes
{x} _ Is being carried out in association with a development approval for a material change of use of LJNo ‘C1 Yes

premises that has not lapsed, if the development approval was for a development application that
was made before 31 October 2006
(xi) Is being carried out in association with a development approval for a material change of use of [LNo [1 Yes
premises that -
* was given for development made assessable under SEQ Regional Plan Regulatory Provisions,
section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
« has not lapsed

{xii} Is ina rural village as defined under the SEQ Regional Plan Regulatory Provisions LINo [J Yes
(xiii) Is for a rurat residential purpose for land located in the Mt Lindesay/North Beaudesert Study Area ([_JNo [_] Yes
and - ‘

+ the development application or development application (superseded planning scheme) for the
subdivision is properly made before 2 March 2008; and
+ the subdivision relates to land located in a zone or equivalent designated area mentioned in a
notice published in the gazette by the regional planning Minister
{xiv) Is being carried out under - LINe (1 Yes
+ anexemption given by the regional planning Minister for an application for exemption lodged
before 30 September 2005; and
¢ adevelopment approval for a development application that is properly made within six months of
the exemption being given by the regional planning Minister
(xv) Involves the extension of an existing lease or licence over tand if - LJNo LJ Yes :
* no additional lots are created; and :
+ any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous lease or licence; and :
+ _ the previous lease was obtained before 31 October 2006 i
(xvi) Creates lots for a purpose or is being carried out in association with development other than those [No (1 Yes
stated in (i) - (xv) above :

If yes to other development under (xvi) above - The subdivision is prohibited and an application involving that component cannot be made. Go to
(@) on the next page of this Checklist.

 

 

 

 

Page 18

Page 24

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

SEQ REGIONAL PLAN (cont)

{ii) For any part of the premises, does the relevant planning scheme state a minimum lot size of greater than
100ha and is any lot resulting from the subdivision proposed to have a lot size less than that stated size?
(C1 No - Go to fii) CA Yes - Complete Table 2

TABLE 2 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if applicable)

 

The subdivision:
{i) Creates a residual lot LINo [1] Yes
{ii} Creates the same number or fewer lots than the number of lots being subdivided LINo (Yes
(iii) Creates a single additionat lot when an existing lot is severed by a road that was gazetted before2 []No [_] Yes
March 2006
(iv) Creates a single additional lot for an emergency services facility OO Yes
(v). Creates a single additional lot for a water cycle management infrastructure _ Dp Yes
(vi) Creates a single additionai fot for waste management facility Cl yes |
(vil) Creates a single additional lot for telecommunications infrastructure Oo Yes
(vill) Creates a single additional lot for electricity infrastructure OO Yes /
{ix) Creates a single additional lot for cemetery or a crematorium 0 Yes
{x) Is being carried out in association with a development approval for a material change of use of (J Yes

 

premises that has not lapsed, if the development approval was for a development application that i
was made before 31 October 2006 :
(xi) Is being carried out in association with a development approval for a material change of use of [No (1) Yes :
premises that -
* was given for development made assessable under SEQ Regional Plan Regulatory Provisions,
section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
« — has not lapsed

Is in a rurat village as defined under the SEQ Regional Plan Regulatory Provisions CINo (Yes

(xiii) ts for a rurat residential purpose for land located in the Mt Lindesay/North Beaudesert Study Area and- [_]No (] Yes
+ the development application or development application (superseded planning scheme) for the
subdivision is properly made before 2 March 2008; and
+ _ the subdivision relates to land located in a zone or equivalent designated area mentioned in a
/ notice published in the gazette by the regional planning Minister ;
(xiv) Is being cartied out under - CINo [Yes
+ an exemption given by the regional planning Minister for an application for exemption lodged
before 30 September 2005; and
¢  adevelopment approval for a development application that is properly made within six months of
the exemption being given by the regional planning Minister
(xv) Involves the extension of an existing lease or licence over land if - LINo (CiYes -
* no additional lots are created; and
* — any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous lease or licence; and
* _ the previous lease was obtained before 31 October 2006

(xvi) Creates lots for 2 purpose or is being carried out in association with development other than those -[]No :(] Yes
stated in (i) - (xv) above

(xi

If yes to other development un under (xvi) above - The subdivision is prohibited and an application involving that component cannot be made. Go to
{i on the next page of this Checklist.

 

 

 

 

Page 19

Page 25

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

SEQ REGIONAL PLAN (coni)

 

 

 

 

(iii) For all lots, other than those affected by {i) and (ii) above, is any lot resulting from the subdivision proposed to
have a lot size of less than 100 hectares?

(No -Got0aa12 [[] Yes - Complete Table 3
TABLE 3 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if applicable)
The subdivision:
() Creates a residual lot LINo [] Yes
(ii) Creates the same number or fewer lots than the number of lots being subdivided LINo [1] Yes

(iii) Creates a single additional lot when an existing lot is severed by a road that was gazetted before2 [_]JNo [] Yes
March 2006

{iv) Creates a single additional lot for an emergency services facility oO No [1 Yes

: {v) Creates a single additional lot for a water cycle management infrastructure a No ‘Ll Yes .
(vi} Creates a single additional lot for waste management facility LINce (1 Yes
(vii) Creates a single additional lot for telecommunications infrastructure i) , Oo Yes
(viii) Creates a single additional lot for electricity infrastructure [No [LJ Yes
(x) Creates a single additional lot tor cemetery or a crematorium LJNo [Yes
{x)_ Is being carried out in association with a development approval for a material change of use of LINo -[] Yes

premises that has not lapsed, if the development approval was for a development application that
was made before 31 October 2006
(xi) Is being carried out in association with a development approval for a material change of use of LINo (Yes
premises that -
* was given for development made assessable under SEQ Regional Plan Reguiatory Provisions,
section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
+ — has not lapsed

(xii) Is in a rural village as defined under the SEQ Regional Plan Regulatory Provisions LINo [1] Yes

(xiii) Is for a rural residential purpose for land located in the Mt Lindesay/North Beaudesert Study Areaaand- [_]No ([] Yes
+ the development application or development application (superseded planning scheme) for the
subdivision is properly made before 2 March 2008; and
+ _ the subdivision relates to land located in a zone or equivalent designated area mentioned in a
: notice published in thie gazette by the regional planning Minister : ‘
* (xiv) Is being carried out under - CINo Yes
* an exemption given by the regional planning Minister for an application for exemption lodged
before 30 September 2005; and
+ «  adevelopment approval for a development application that is properly made within six months of
the exemption being given by the regional planning Minister
(xv} Involves the extension of an existing lease or licence over land if - LINo [Yes '
* no additional lots are created; and
* any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous tease or licence; and
+ _ the previous tease was obtained before 31 October 2006

(xvi) Creates lots for a purpose or is being carried out in association with development other than those []No [_] Yes
stated in (i) - (xv) above

it yes to other development under {xvi) above - The subdivision is prohibited and an application involving that component cannot be made. Go to
O32

Smaula 2 table 6 ton

 

 

Page 20

Page 26

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 21.3, 9 May 2008

 

STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS)*2

3.11B | Is ghy part of the premises within a designated region under Schedule 1 of the draft regulatory provisions?
No-Gotoa312 [_) Yes

 

It'yes. is the application seeking approval for subdivision as defined in Schedule 2 of the draft regulatory provisions?
QO No - Go to 03.12 oO Yes — Answer both (a) and (b) below

{a) |s any part of the premises located within a master planned area and not included in a structure plan, to which section
3.1(1) of the draft regulatory provisions apply?
CINo- Goto’ LJ Yes

If yes, indicate whether or not the folowing circumstances apply to the subdivision proposal - (Tick if applicable)
The subdivision:

(i) Creates lots with a size greater than the number stated in section 3.1(2){a) of the draft CINo [Yes
regulatory provisions?

(ii) Creates a residual lot as defined in Schedule 2 of the draft regulatory provisions , CINo 0 Yes

(iii) Creates a single additional lot under section 3.1(2)(c) of the draft regulatory provisions CINo [1 Yes

(iv) Creates a single additional lot for an emergency services facility LINo .C] Yes
(v) Creates a Single additional lot for water cycle management infrastructure CiNno Yes
(vi) Creates a single additional lot for a waste management facility CI No (Yes
{viil) Creates a single additional lot for telecommunications infrastructure Oo No ‘d Yes
{vili) Creates a single additional lot for electricity infrastructure (No , (C1 Yes
(ix) Creates a single additional lot for cemetery or a crematorium CINo £1 Yes

(x) Is carried out in association with a development approval for a material change of use of [_]No (_] Yes
premises that has not lapsed, if the development approval was for a development
application that was made before the day the dratt regulatory provisions for the
designated region took effect

(xi) Is carried out in association with a development approval for a material change of useof [LJNo [] Yes
premises that -
* — was given for development made assessable under the draft regulatory provisions,
section 2.1 or 2.2; and
+ — has not lapsed

‘ (xii) Creates lots for’a purpose or is being carried out in association with development other LINo (Yes
than those stated in (i) ~ (xi) above

lf yes to other development under (xii) above - This application must be referred to the Department of infrastructure and Planning
{DIP) as Concurrence Agency. Answer (6) on the next page of this Checklist

 

 

 

 

42 State Planning Regulatory Provisions (Regional Plans} are the draft regulatory provisions

Page 21

Page 27

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS) (cont)

(b) Is any part of the premises within the Regional Landscape and Rural Production Area or in the Investigation Area?
(No -Got%o312 (2) Yes - Answer (i) - (ii)

 

{i) Is any part of the premises located in a planning precinct as defined in Schedule 2 of the draft regulatory
provisions, and is any fot resulting from the subdivision proposed to have a lot size smaller than the minimum
stated in the relevant planning scheme for the precinct?

[No - Goto fi) (1) Yes - Complete Table 1

TABLE 4 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if applicable)

The subdivision:
(i) Creates a residual lot as defined in Schedule 2 of the draft regulatory provisions ‘CINo [Yes
“(i Creates a single additional lot under section 3.2(2)(b) of the draft regulatory provisions CNo CT Yes
(iii) Creates a single additional lot for an emergency services facility ‘Tino (1 Yes
{iv} Creates a single additional lot for water cycle management infrastructure (No [1] Yes
(v) Creates a single additional lot for a waste management facility CJNo (1) Yes
(vi) Creates a single additional lot for telecommunications infrastructure LINo (1) Yes
(vii) Creates a single additional lot for electricity infrastructure Lino Ces ,
(viii) Creates a single additional lot for cemetery or a crematorium . LINo .L Yes
(ix) Is being carried out in association with a development approval for a material change of use of CINo O Yes

premises that has not lapsed, if the development approval was for a development application that
was made before the day the draft regulatory provisions for the designated region took effect

(x) Is being carried out in association with a development approval for a material change of use of CINo L1Yes |
premises that -
« — was given for development made assessable under the draft regulatory provisions, section 2.4,
2.6, 2.8, 2.10, 2.12, or 2.14; and
« has not lapsed

{xi) Is in a rural village as defined in Schedule 2 of the draft regulatory provisions (No (Yes

(xii) Is for a rural residential purpose as defined in Schedule 2 of the draft regulatory provisions, and- [_]No (_] Yes
+ — the development application or development application (superseded planning scheme) for the
subdivision is properly made within two calendar years from the day the draft regulatory
provisions for the designated region took effect; and
« _ the subdivision relates to land located in a zone listed in Schedule 1 Table 3 of the draft
regulatory provisions for the designated region

(xiii) Involves the extension of an existing lease or licence over tand if - {No {J Yes
* no additional lots are created; and : :
« any use permitted by a subsequent lease or licence is consistent with a use perrnitted by the
previous tease or licence; and
* _ the previous lease was obtained before the day the draft regulatory provisions for the
designated region took effect

(xiv) is development that is - [No (Yes
« — declared to be a significant project under section 26(i)(a) of the State Development and Public '
Works Organisation Act 1971 or located in a State development area; and
_ * confirmed in writing by the Regional Planning Minister to be exempt from these draft regulatory
provisions

(xv) Creates lots for a purpose or is being carried out in association with development other than those =[]No -(] Yes
stated in (i) ~ (xiv) above :

 

 

 

If yes to other development under (xv) above - The subdivision is prohibited and an application involving that component cannot be made. Go to (ii)

 

Page 22

Page 28

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS) (cont)

{ii}, For any part of the premises, does the relevant planning scheme state a minimum lot size of greater than the
number stated in section 3.2(1)(a) of the draft regulatory provisions and is any lot resulting from the subdivision
proposed to have a lot size less than that stated size?

 

LI No - Go #0 fii) (1 Yes - Complete Table 2 .
TABLE 2 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if applicable)
The subdivision:
(i) Creates a residual lot as‘defined in Schedule 2 of the draft regulatory provisions (1No [1 Yes
(ii) Creates a single additional lot under section 3.2(2)(b) of the draft regulatory provisions (ino [] Yes /
(iii) Creates a single additional lot for an emergency services facility CINo [J Yes
(iv), Creates a single additional lot for water cycle management infrastructure (MNo (Yes
(v) Creates a single additiona! lot for a waste management facility LI No Oo Yes .
‘Wi Creates a single additional lot for telecommunications infrastructure (No L Yes
(vil) Creates a single additional lot for electricity infrastructure CINo [1] Yes
(vill) Creates a single additional lot for cemetery or a crematorium [No Llves !
(ix) Is being carried out in association with a development approval for a material change of use of Cno (Yes

premises that has not lapsed, if the development approval was for a development application that '
was made before the day the draft regulatory provisions for the designated region took effect

(x) Is being carried out in association with a development approval for a material change of use of CMINo [Yes
premises that - 1
+ — was given for development made assessable under the draft regulatory provisions, section 2.4,
2.6, 2.8, 2.10, 2.12, or 2.14; and
« has not lapsed

(xi) Is in a rural village as defined in Schedule 2 of the draft regulatory provisions [INo [1] Yes ,

(xti) Is for a rural residential purpose as detined in Schedule 2 of the draft regulatory provisions and - CINo (Yes
+ _ the development application or development application (superseded planning scheme) for the
subdivision is properly made within two calendar years from the day the draft regulatory
provisions for the designated region took effect ; and
. * the subdivision relates to land located in a zone listed in Schedule 1 Table 3 of the draft
regulatory provisions for the designated region

(xiii) Involves the extension of an existing lease or licence over land if - ‘CINo (Yes
: * no additional lots are created; and
* — any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous lease or licence; and
+ _ the previous lease was obtained before the day the draft regulatory provisions for the designated
region took effect

(xiv) Is development that is - LINo () Yes
« — declared to be a significant project under section 26(i}(a) of the State Development and Public
Works Organisation Act 1971 or located in a State development area; and
* — confirmed in writing by the Regional Planning Minister to be exempt from these draft regulatory
provisions

(xv) Creates ‘. for a purpose or is being carried out in association with development other than those = [_] No CG Yes °
stated in {i} - (xiv) above ‘

If yes to other development under (xv) above - The subdivision is prohibited and an application involving that component cannot be made. Go to
(i)

 

 

 

 

Page 23,

Page 29

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS) (cont)

 

(iii) For all lots, other than those affected by {i) and (ii) above, is any lot resulting from the subdivision proposed to
have a lot size of less than the number stated in section 3.2(1)(c) of the draft regulatory provisions?

(CINo -Gotoa3.12 (1 Yes - Complete Table 3
TABLE 3 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if applicable)

The subdivision:

{i) Creates a residual lot as defined in Schedule 2 of the draft regulatory provisions CINo [Yes
{ii) Creates a single additional lot under section 3.2(2)(b) of the draft regulatory provisions, CINo (Yes
(iil) Creates a single additional fot for an emergency services facility oO No [] Yes
(iv) Creates a single additional tot for water cycle management infrastructure O No [_] Yes
(v) Creates a single additionalot for a waste management facility (ONo [Yes
‘(vi) Creates a single additional lot for telecommunications infrastructure ‘CINo [Yes :
(vii) Creates a single additional lot tor electricity infrastructure CINo ‘Oo Yes
(viii) Creates a single additional lot for cemetery or a crematorium ‘No (1 Yes
(ix) Is being carried out in association with a development approval for a material change of use of CINo [] Yes

premises that has not lapsed, if the development approval was for a development application that
was made before the day the draft regulatory provisions for the designated region took effect

{x) 1s being carried out in association with a development approval for a material change of use of ‘Gono Ces '
premises that -
« — was given for development made assessable under the draft regulatory provisions, section 2.4,
2.6, 2.8, 2.10, 2.12, or 2.14; and
« — has not lapsed

(xi) Is in a rural village as defined in Schedule 2 of the draft regulatory provisions LINo (J Yes

(xii) 1s for a rural residential purpose as defined in Schedule 2 of the draft regulatory provisions and - LINo (] Yes
+ — the development application or development application (superseded planning scheme) for the
subdivision is properly made within two calendar years from the day the draft regulatory
provisions for the designated region took effect; and
« — the subdivision relates to tand located in a zone listed in Schedule 1 Table 3 of the draft
regulatory provisions for the designated region

' (xiii) Involves the extension of an existing lease or licence over land if - CINo [Yes °
* no additional lots are created; and ,
* — any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous lease or licence; and
“« — the previous lease was obtained before the day the draft regulatory provisions for the designated
tegion took effect

{xiv) !s development that is ~ CONo (C1 Yes
+ — declared to be a significant project under section 26(i)(a) of the State Development and Public :
Works Organisation Act 1971 or located in a State development area; and
+ confirmed in writing by the Regional Planning Minister to be exempt from these draft regulatory
provisions

(xv) Creates lots for a purpose or is being carried out in association with development other than those [[}No [7] Yes
stated in (i) - (xiv) above

if yes to other development under (xv) above - The subaivision is prohibited and an application involving thal component cannot be made. Go to Q
3.2

 

 

 

 

 

LUO eMuie 2. “abi 2 weir hs

 

Page 24

Page 30

INTEGRATED PLANNING ACT 1997 ° IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

KOALA CONSERVATION

3.12 isa part of the premises in a koala conservation area or koala sustainability area?
No-Gotoa313  [[] Yes

It yes, will the proposed reconfiguration result in the following?
(i) An increased number of lots LJNo [1] Yes

 

(ii) Clearing of native vegetation over an area greater than 2,500m? (Jno ()] Yes

If yes to either or both of (i) or (ii) above - ihis application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.

FB Raey set ha Fee vis
CANAL DEVELOPMENT
3.13 ye proposed reconfiguration in connection with the construction of a canal?

No - Go 10. 03.14 O Yes - (Complete Form 1, Part M} This application must be referred to the Environmental Protection Agency (EPA) as Concurrence
Agency.

 

 

 

1B Renpuratian, soracute 2.13

DECLARED CATCHMENT AREA

3.14 | 4s t¥e proposed reconfiguration in an area declared to be a catchment area under the Water Act 2000?
No-Gowa315 (] Yes

 

 

 

 

If yes, is any lot resulting from the reconfiguration proposed to be less than 16ha?
Oo] No Oo Yes - This application must be referred to the Department of Natural Resources and Water (NRW) as Concurrence Agency.

    

ruler we 2 Hema

PUBLIC PASSENGER TRANSPORT

3.15 | Is th proposed reconfiguration listed in schedule 13A of the Integrated Planning Regulation 1998 and does it exceed the specified threshold?
No -Gotoa3.1¢ (_] Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.

 

 

 

   

YP Steps one."

RAIL TRANSPORT
3.16 fe proposed reconfiguration listed in schedule 13B of the Integrated Planning Regulation 1998 and does it exceed the specified threshold?
No - Go to 03.17 Oo Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
JP Fige Oe
WETLAND; CONSERVATION ESTATE
3.17 bofs the proposed reconfiguration result in more than 10 lots or any lot less than 5hain area? +
No ~Gotoa3.18 [[] Yes - Answer (a) and (b) below
(a) Does the proposed reconfiguration involve a lot situated in, or within 100m of, a wetland shown on the ‘Map of referable
wetlands’? .
oO No oO Yes - This application must be referred to the EPA as Advice Agency.
{b) Does the reconfiguration involve a lot situated in, or within 100m of, the following?
{i} Aprotected area, forest reserve, critical habitat or area of major interest under the Nature

  

fanve 2 den 1S IP Regs ios

 

 

 

tenia 2. too) 34, IP Reeritzre. enedule 158

 

 

 

Conservation Act 1992 CINo [1 Yes
(ii) A State forest or timber reserve under the Forestry Act 1959 LINo : C1 Yes
(iii) A marine park under the Marine Parks Act 2004 (LJ No (Yes
(iv) A recreation area under the Recreation Area Management Act 1988 CINo (Yes
(v) A world heritage area listed under the World Heritage Convention CINo (] Yes
(vi) Brisbane forest park under the Brisbane Forest Park Act 1977 LJNo : CJ] Yes

If yes to any one of (i) - (vi) above - this application must be referred to the Queensland Govemment department administering the relavant Act
mentioned as Advice Agency

(P Heguss
HERITAGE
3.18 | Does thé proposed reconfiguration involve a jot sharing a common boundary with a Queensland Heritage place under the

 

 

 

   

0 - End of Section 3 oO Yes - This application must be referred to the Environmental Protection Agency (EPA) as Advice Agency. - End of
Section 3

 

   

 

WILD RIVER AREA - Atthough legislation provides for assessment of lot reconfiguration tor the purposes of the Wild Rivers Act 2005, currently no declarations for any of
the wild river areas apply the Wild Rivers code to that type of development.

 

 

 

Page 25

Page 31

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

Page 26

Page 32

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

SECTI O N 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME

41 ls gfy of the proposed operational work assessable under a planning scheme?

 

 

 

 

No - Go to 04.2 (1 Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.

STATE-CONJROLLED ROAD

414 Ay part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No

If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?

(No (1 Yes - This application must be referred to the Depariment of Main Roads (DMA) as Concurrence Agency.

Ces

If yes, is all of the proposed operational work associated with the following?
(i) Amaterial change of use that is assessable under the planning scheme CINo [7] Yes

(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number of lots [-]No (] Yes
abutting the State-controlled road

If no to either or both (i) or (ii) above - Answer (a) - (c) below

(a) 1s any of the proposed operational work associated with access to a State-controlled road?

No oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
CNo Yes .

If yes, is the operational work proposed in a future State-controlled road not defined by route?
Oo] No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency
D Yes - This-application must be referred to OMR as Advice Agency.

(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,

through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlied road?
[LINo Yes

It yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
O Yes - This application must be relerred to OMR as Advice Agency.

IP Aegulahc scPedute 2 tate 5 tert 3 4P Reawlanon, seneawe 2 tate 3.185 1,0)

ACID SULFATE SOILS
4.1.2 oye the operational work proposed in a focal government area listed* in State Planning Policy 2/02: Planning and Managing

 

 

Dgfelopment Involving Acid Sulfate Soils?
No -Gotoa4.1.3 ([] Yes

It yes, is the natural ground level of any point where work is being carried out less than 20m AHD?

CI No C1 Yes
it yes, does the proposed operational work involve the following? .
(i) Excavating more than 1,000m: of soil or sediment at or below 5m AHD (No (1 Yes

(ii) Filling the premises with 1,000m? or more of material with an average depth of 0.5m on [No (1 Yes
land, soil or sediment at or below 5m AHD

If yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Water (NRW) as
Advice Agency

mH ig Poot y 2 Oo Porsing.

Rey G0 owe =

 

ter S. State Por

 

 

 

Wp 99 Dene rement te gh

 

Bu te Svs

   

 

 

«1 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervay Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Mornington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsvilte, Whitsunday

Page 27

Page 33

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

EASEMENTSAND SUBSTATIONS

 

4.13

Ary of the proposed operational work for filling or excavation?
No -Gotoaa14 (_] Yes

It yes, is the filling or excavation associated with reconfiguring a lot?
LI Yes (J No - Answer both (a} and (b) below

(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994?
[No (Yes

If yes, is any of the operational work proposed to be located in any part of the easement?
(LINo [1 Yes - this application must be referred to the entity as Advice Agency.

{b) Is any of the operational work proposed to be focated within 10m of a substation site under the Electricity Act 1994?
(No LD Yes - this application must be referred to the entity responsible lor the substation as Advice Agency.

!P Sequtubon. sched Mex FOr, ¢ hee 8S ae 3 den 7D

 

444

Is afy part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
Agt 1923.for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No -Goteas15 [1 Yes

If yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated with
reconfiguring a lot?

LJ No O Yes
It yes, is any of the operational work proposed to be located in any part of the easement?
No CD Yes - rhis application must be referred to the licence holder as Advice Agency.

   

fon egnegy'sL

Biter iF |

 

PUBLIC PASSENGER TRANSPORT

 

415

sfecitied threshold?
No ~ Go 10 04.1.6 (1 Yes - This application must be referred to Queensiand Transport (QT) as Concurrence Agency.

iP Gegu

ls fs of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the

 

. Scheuuse @ labie 3 Rem 14.

 

RAILWAY SAFETY AND EFFICIENCY

 

4.16

specified threshold?

ee of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
No ~ Go 0 04.1.7 (77 Yes - This application mus! be referred to Queensland Transport (OT) as Concurrence Agency.

AP Re idisOn SONA. e 2 tabi 3 fan i$

 

KOALA CONSERVATION

 

4.17

ary part of the premises in a koala conservation area or koala sustainability area?
No - Go 0.04.2 C1 Yes

If yes, is all of the proposed operational work associated with a material change of use or reconfiguring a lot for which referral
is required in relation to koala conservation (i.e. did you answer ‘yes to all questions in either Q2. 1.8 or Q 3.12)?
LD Yes - Go 04.2 CINo

{f no, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 1994?
(Yes -Gotoas2 [No

If no, will the activity result in the following?

{i} Clearing of native vegetation over an area greater than 2,500m? ‘CNo [Yes
(ii) Extracting gravel, rock of sand from an area greater than 5,000m? CINo [1 Yes
{iil} Excavating or filling an area greater than 5,000m? : CINo : L Yes

Hf yes to one or more of (i} — (iii) above - This application must be referred to the Environmental Protection Agency (EPA} as
Concurrence Agency.

iP Beg alan soho gen Fe OE

 

 

 

 

 

 

WILD RIVER AREA - although legislation provides tor assessment of operational works for residential, commercial and industrial development for the purposes of the
Wild Rivers Act 2005,currently na declarations for any of the wild river areas apply the Wild Rivers code to that type of development.

 

 

Page 28

Page 34

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

AREA

ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER

f<-

 

42

ify of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
No-Gowos3 [J Yes

if yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?

oO No - (Complete Form 1, Part E) The operational work associated with reconfiguring is assessed by the local goverment,

0 Yes

It yes, is the proposed operational work for residential, commercial or industrial purposes outside a designated urban area,
as defined by the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part E) The operational work associated with reconfiguring is assessed by the local government.

oO Yes (Complete Form 1, Part E} The operational work associated with reconfiguring is assessed by the focal govemmeni, and subject to the
declaration for the relevant wild river area, assessment by the focal govemment is required for the purposes of the Wild Rivers Act 2005.

        
    

PUNE 1p a,

   

COMA BRIE

    

we

 

 

VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA

 

4.3

 

Is Any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999 applies?
No-Gotoasa [1] Yes

If yes, is the proposed clearing assessable (i.e. not an exception) under schedule 8, part 1, table 4 of the IPA?
LINo-Gowass (Cy) Yes

” Ityes, is the proposed vegetation clearing a relevant purpose under the Vegetation Management Act 1999, section 22A
for one or more of the following?
(i) Approject declared to be a significant project under the State Development and Public Works [_]No [] Yes
Organisation Act 1971, section 26

(ii) Necessary to control non-native plants or declared pest LINo (Yes
(iii) To ensure public safety ; CINo [1] Yes
{iv) For establishing a necessary fence, firebreak, road or vehicle track, or for constructing [JNo [_] Yes

necessary built infrastructure, if there is no suitable alternative site for the fence, firebreak,
road, track or infrastructure

{v) Anatural and ordinary consequence of other assessable development for which a No [Yes
development approval as defined under the Planning Act was given, or a development !
application as defined under the Planning Act was made, before 16 May 2003

“(vi) For fodder harvesting ‘CUNo :(] Yes
“(vil). For thinning . CINo ‘ClYes
(viii) For clearing of encroachment CINo Oo Yes .
(ix) For an extractive industry LJ No (7 Yes
(x) For clearing regrowth on leases issued under the Land Act 1994 tor agriculture or grazing CNo ‘(} Yes
purposes
{xi) For clearing regrowth on freehold land, or indigenous land, in a wild river high preservation [[}No ((] Yes
area,

If no to alll (i} ~ (xi) above - The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application.

If yes to any one of (i) ~ (xi) above, is the proposed clearing associated with a material change of use or reconfiguring a
lot for which referral is required in relation to clearing vegetation (ie. did you answer Yes’ to all questions in either 02.1.4 or Q 3.3)?
1 Yes - Goto. 04.4

oO No — Answer (a) {b} and (c) on the next page of this Checklist

 

 

 

Page 29

Page 35

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checktist, Version 21.3, 9 May 2008

 

VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA (cont)

(a) 1s any of the proposed clearing in an area declared as an area of high nature conservation value (other than a
wild siver high preservation area) or an area vulnerable to land degradation under the Vegetation Management
Act19997
O No ~ Complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and Water (NRW). if

NRW 1s not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.

Yes
It yes, is any of the proposed clearing for {v), (vi), (ix) or (x) above?
G No - Complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and Water
(NRW). if NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
Oo Yes - The clearing is not a relevant purpose and ihe Assessment Manager must refuse to receive the application

(b) Is any of the proposed clearing in the high preservation area of a declared wild river area?

Oo No - Complete Form 1, Part J. This application requires assassment by the Department of Natural Resources and Water (NRW), If
NAW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.

 

(1 Yes
\t Yes, is any of the proposed clearing for the following purposes?
(i) For (i), (vi), (vil) or {ix) above (CINo [1 Yes
(ii) For (x) or (xi) above and in a high preservation area outside of a CINo [Yes
registered area of agriculture as defined under the Vegetation
Management Act 1999

if no to either or both (i) or (ii) above - Subject fo the dectaration for the relevant wild river area, the application
requires assessment for the purposes of the Wild Rivers Act 2005 - Complete Form 1, Part J. This application
requires assessment by the Department of Natural Resources and Water (NRW). ff NRW is not the Assessment
+ Manager, the agency has jurisdiction as Concurrence Agency.
If yes to either or both (i) or (ii) above, is there a property development plan approved under the Wild
Rivers Act 2005 applying to the land?

| No - The clearing 1s not a relevant purpose and the Assessment Manager must refuse to receive the application.

oO Yes - Unless the application is consistent with any approved property development plan applying to the land, the
Assessment Manager must refuse to receive it. Subject to the declaration for the relevant wild river area, the
application requires assessment for the purposes of the Wild Rivers Act 2005 — if an application is made
complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.

(c) Is any of the proposed clearing in a koala conservation area or koala sustainability area?
(No - Go 04.4 0 Yes
If yes, is any of the proposed clearing associated with reconfiguring a lot for which referral is required in
telation to proposed clearing in a koala conservation area or koala sustainability area (i.e, did you answer
‘yes’ to all questions in Q3.12)?
1 Yes-cotass [No :
If no, is any of the proposed clearing over an area greater than 2,500m2?

CINo - Go 044
(Yes - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence
Agency.

 

 

 

 

 

Page 30

Page 36

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

TAKIN

G OR INTERFERING WITH WATER; WILD RIVER AREA

 

4.4

fs any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under the Water
Agt 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?

No-Gotoass  (] Yes - Answer (a) and (b) below
(a) Are the operations mentioned as self-assessable development in the following?
(i) A water resource plan under the Water Act 2000 J No C1 Yes
(ii) A wild river declaration under the Wild Rivers Act 2005 [CI No (Yes
(iii) A regulation under the IPA or the Water Act 2000 LNo OD Yes

It no to all of (i) to (iii) above - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to (b}

(b) ts any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act 2005?

0 Yes

If yes, is the work for the following?
(i) Awater pump CINo = (1) Yes (Complete Form 1, Part K2)
(ii) Water storage CINo = (1) Yes (Comptete Form 1, Part Ks)
{iii) Gravity diversion from a watercourse CINo = (1) Yes (Complete Form 1, Part Ky}
(iv) Watercourse diversion CINo = (1 Yes (Complete Form 1, Part Ke)
(v) Other work for taking or interfering with water CINo =] Yes (Complete Form 1, Part Ks)

If yes to any one of {i) to (v) above - i any part of the proposal relates to operational work that interferes with water in a high preservation
area, or in a nominated waterway (other than for a dam or weir), the application will be taken to be not properly made and the Assessment
Manager must refuse to receive it. All other proposals are subject to the declaration for the relevant wild river area, and assessment may
be required for the purposes of the Wild Rivers Ac! 2005. The application will require assessment by the Department of Natural Resources
and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has junsdiction as Concurrence Agency.
(Complete the relevant Form 1, Part K as indicated in the table above if an application is made.)

CI No .
If1no, is the work for the following?
(i) Awater pump ‘ CINo = (1) Yes (Complete Form 1. Part Ka)
(ii) Water storage CINo [1 Yes (Complete Form 1, Part Ka)
(ii) Gravity diversion from a watercourse LINo = (7) Yes (Complete Form 1, Part Ki)
(iv) Watercourse diversion [No (1 Yes (Compete Form 1, Part Ka)
(v) Other work for taking or interfering with water [No [J Yes (Complete Form 1, Part Ks)
If yes to any one of (i) to (v) above ~ The application will require assessment by the Department of Natural Resources and Water (NRW). If NAW

is nol the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(Complete the relevant Form 1, Part K as indicated in the table above.)

1 tA Hg

     

       

on SERA tH ier

 

a i ¥

 

45

 

ls any/of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
terfering with artesian water (other than using a water truck to pump water)?

10 - Go to 04.6 oO Yes - (Complete Form 1, Part K,} This application requires assessment by the Departmeat of Natural Resources and Water (NRW). If
NRWis not the Assessment Manager for the application. the agency has junsdiction as Concurrence Agency.

 

 

 

 

Page 31

Page 37

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)

 

       
 

 

  
 

46 l Is anyfof the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
No-Go10as7 (1) Yes - Answer (a) and (bj below
{a) Are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 [No (Yes
(ii) A regulation under the IPA or the Water Act 2000 (No LJ Yes
It yes to either or both of (i) or (ii) above - (Complete Form 1, Part Ka). This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
(b) Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
siver area declared under the Wild Rivers Act 2005?
| No oO Yes ~ if any part of the proposal relates to operational work in a high preservation area other than works stated in a wild river
declaration for the area to be assessable development for which a development application may be made, the application will
be taken to be not propery made and the Assessment Manager must reluse to receive it, All other proposals are subject to the
declaration for the relevant wild river area, and assessment may be required for the purposes of the Wild Rivers Act 2005.
(Complete Form 1, Part Kaif an application is made.)
Z 4 LEN OST ue kT Zi awe
Ay Wr ascian wan ‘ng Py OOF
4.7 | \s Any of the proposed operational! work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
No-Gotoass [_] Yes
If yes, are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 CONo C1 Yes
(ii) A regulation under the IPA or the Water Act 2000 [CINo (1 Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kx) This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. .
HAS PRIME ADEE BS,
SUM AMES A WELT)
48

 

 

 

Dog any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for interfering
with overland flow water (other than using a water truck to pump water)?

No-Gowa49 — [[] Yes - Answer both (a) and (b) betow

{a) Is the proposed operational work to be carried out in a floodplain management area of a wild river area declared under the
Wild Rivers Act 2005?

Yes
If yes, indicate what the proposed operational work relates to
{i) Specified works for the area C1 No CJ Yes
(i) Work state in the relevant wild river declaration to be L] No C1 Yes

assessable development for which an application may
be lodged

Ifyes to either or both of (i) or (ii) above - (Complete Form 1, Part Kie Subject to the declaration for the relevant wild river area, assessment
may be required for the purposes of the Wild Rivers Act 2005)
if no to both (i) and (ii} above -~ the application will be taken to be not properly made and the Assessment Manager must refuse 10 receive il.

LINo

Ifno, are the operations mentioned as assessable development in the following?
(iii) A water resource plan under the Water Act 2000 LINo OO Yes
(iv) A regulation under the IPA or the Water Act 2000 (No LD Yes

It yes to either or both of (i) or (ji) above - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.

(b) 1s the interfering with overtand flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?
LINo

o Yes - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural Resources and Water
(NAW). if NRW is not the Assessment Manager for the apptication, the agency has jurisdiction as Concurrence Agency.

DART eked Ree Se afi

 

 

Nites “cur i aeed bee 24

At ca et agar

 

 

 

Page 32

Page 38

\NTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continuea)

4.9 |I\s the proposed operational work for the following?

(i) For the construction of a referable dam as defined under the Water Act 2000 LINo (Yes
{ii) To increase the storage capacity of a referable dam by more than 10% Lino [1] Yes

 

lf yest to either or both of (i) or {ii} above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NAW). If NRW is not the Assessment Manager for the appication, the agency has jurisdiction as Concurrence Agency.

TIDAL WORK; WILD RIVER AREA

4.10 nf of the proposed operational work tidal work, other than excluded work defined under the IPA?
No -Gotoa411  [_] Yes - Answer (a) and (b) below

    

 

 

(a) _ Is any of the proposed tidal work prescribed tidal work?

0 Yes
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
(No
{f1no, is the work proposed in a canal? .
C1 No
It1no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
0 No ~ (Complete Form 1, Part P). it the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transpon (Maritime Satety Qid) as Concurrence Agency.
Oo Yes - (Complete Form 1, Part P}. if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensiand
Transport (Maritime Satety Qid) as Concurrence Agency and Qid Fire and Rescue Service as Advice Agency.
C1 Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - (Complete Form 1, Part P}. This application must be referred to Queensland Transport (Maritime Safety Qld) as
Concurrence Agency.
oO Yes - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qld) as
Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
C1 Yes

If yes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?

(_] No - An application tor the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it,

LD Yes

If yes, is the work proposed in a canal?
CLINo

 

if no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

oO No - Uniess the application is consistent with any property development plan applying to the land, the Assessment
-Manager must refuse to receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA} is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensiand Transport (Maritime Safety Qid) as Concurrence Agency
and assessment for the purposes of the Wild Rivers Act 2005,

oO Y@s - Uniess the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it, (Complete Form 5, Part P) It the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensiand Transport (Maritime Safety Qid} as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the
application also requires assessment for the purposes of the Wild Rivers Act 2005.

0 Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

Oo No — Unless the application is consistent with any property development plan applying to the iand, the Assessment
Manager must reluse io receive it. (Complete Form 1, Part P) This application must be referred to Queensland
Transport {Maritime Safety Qld} as Concurrence Agency. Subject to the declaration for the relevant wild river
area, the application also requires assessment for the purposes af the Wild Rivers Act 2005.

oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Form 1. Part P) This application must be referred to Queensland
Transport (Maritime Safety Qid) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
The application also requires assessment for the purposes of the Wild Rivers Act 2005,

 

 

Oo No - Go fo the first question on the next page of this Checklist

 

 

Page 33

Page 39

INTEGRATED PLANNING ACT 1997

iDAS Assessment Checklist, Version 21.3, 9 May 2008

 

TIDAL WORK; WILD RIVER AREA (continued)

 

(b)

 

 

Note: The answers you provide in (i) — (v) above may affect who the Assessment Manager is for the application.

  

If no, is any of the proposed tidal work to be carried out in a wild river area declared under the Wild Rivers Act 2005?

LC] Yes

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

LJNo - An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
(Yes

It yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

Oo No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager
must refuse to receive it (Complete Form 1, Part M} This application requires assessment by the Environmental Protection
Agancy (EPA). if EPA is not the Assessment? Manager for the application, the agency has jurisdiction as Concurrence
Agency, The application alse requires assessment by Queensland Transport (Martime Safety Qld) as Concurrence Agency
and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005.

CI Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager
must refuse to receive it. (Complete Form 1, Part M) This application requires assessment by the Environmental
Protection Agency (EPA). If EPA is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency, The application also requires assessment by Queensiand Transport (Mantime Safety Qld) as
Concurrence Agency and Old Fire and Rescue Service as Advice Agency. Subject to the deciaration for the relevant wild
river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.

LINo

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

LI No - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensiand Transport (Maritime Safety Qid) as Concurrence Agency.

oO Yes - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency {EPA). if EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport {Maritime Safety Old) as Concurrence Agency) and Qid Fire and

Rescue Service as Advice Agency.
Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?
{i) One only local government tidal area LINo [) Yes
(ii) Starting in one local government tidal area and extending into another local government tidal [No [1 Yes
area (but in no strategic port tidal area)
(iii) In two or more local government tidal areas but not starting in either local government tidal area ]No ((] Yes
(iv) One only strategic port tidal area LINe [1 Yes

(v) A tidal area that is not a strategic port tidal area or a local government tidal area LINo (Yes

ry Zig 4 Pham oe role a ak

 

 

aa cags

 

 

 

Page 34

Page 40

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA

 

411

ls agfy of the operational work proposed to be carried out within a coastal management district?
No-Gotoos12 (} Yes

If yes, is the proposed operational work for the following?

(i) interfering with quarry material on State coastal land above high-water mark LINo (Yes
{ii) Disposing of dredge spoil or other solid waste material in tidal water LCINo [1 Yes
(iii) Draining or allowing drainage or flow water or other matter across State costal land above high-water CINo [1 Yes
mark
.{iv) Constructing or installing works in a watercourse where the works are not assessable under IPA, CiNo [J Yes :
schedule 8, part 1, table 4, items 3 or 4
‘(v) Reclaiming land under tidal waters ; (No (Yes
‘(vi) Constructing an artificial waterway, other than a canal, associated with reconfiguring a tot [INo C1 Yes ,
(vii) Constructing an artificial waterway that is a canal, associated with reconfiguring a lotu LINo ; J Yes /
(vill) Constructing an artificial waterway not associated with reconfiguring a lot on land, other than State CINo (1 Yes

coastal land, above high-water if the maximum surface area of water on the waterway is at least 5,000m?2

(ix) Constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, go No (1 Yes
above high-water mark

(x) Removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion CINo (Yes .
prone area and above high-water mark og
If yes to one or more of (i) - (x) above, is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act
2005?
oO No. + (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. If yes, above, to any shown bold and marked with the symbol,
the application also requires assessment by Queensland Transport (Marine Safety Qld) as Concurrence Agency.

0 Yes

{f yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

oO YeS - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it
{Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment
Manager for the application, the agency has jurisdiction as concurrence Agency. I! yes, above, to any shown bold and marked with the symbol 4, the
application also requires assessment by Queensland Transport (Marine Safety Oid) as Concurrence Agency. Subject to the declaration for the relevant
wild river area, the application also requires assessment for the punposes of the Wild Rivers Act 2005.

oO No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.

 

4 fers ad ed B Codsin Pr steot ar ang Monayerent

 

 

WATERWAY BARRIER WORKS; WILD RIVER AREA

 

4.12

 

\s Any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No -Gotoi3 (Yes

It yes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
CINo

If no, is all of the operational work for constructing or raising waterway barrier works - tick applicable box/es and answer (a) and/or (b) below

(i) temporary [Jno (Yes
(ii) minor DINo (1 Yes
(ill) rebuilt on a regular basis [No C Yes

(a) If yes to one or more of {i) - (iii) above, does alt the proposed operational work comply with any applicable Department
of Primary Industries and Fisheries (DPI&F) self-assessable code?
CO Yes ~ A permit for that aspect of the operational work is not required. Go to 04.13 O No - Go to (b)
{b) If no to all of (i) - (iii) or no to (a) above - (Complete Form 1, Part O3) This application requires assessment by the Department of Primary
industries and Fisheries (DPI&F). if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(Yes

It yes, is any of the proposed operational work to be carried out in a wild river high preservation area?

oO No - Uniess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part Os} This application requires assessment by the Department of Primary Industries and Fishenes (OPI&F}. and,
‘Subject (0 the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if DPI&F is not the
Assessment Manager tor the application, the agency has jurisdiction as Concurrence Agency.

C Yes - An application for the operational work will be taken to be not property made and the Assessment Manager must refuse to receive it

 

 

 

 

Page 35

Page 41

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkist, Version 21.3, 9 May 2008

 

DECLARED FISH HABITAT AREA; WILD RIVER AREA

 

4.13

 

 

 

\s afy of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries
Agt 1994.

No-Gotoast¢ {| Yes

If yes, is the operational work reaSonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)
{i) The maintenance of existing structures, including for example the following structures, if the structures [_]No [] Yes
were constructed in compliance with all the requirements, under any Act, relating to a structure of that
type -
» Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs;
+ Existing powerlines or associated powerline infrastructure
(ii) Educational or research purposes relating to the fish habitat area ; . No (] Yes.
{ii) Monitoring the impact of development on the declared fish habitat area OONo (1 Yes
(iv) The construction or placement of structures, including for example, safety signs, swimming enclosures [_]No [_] Yes
and aids to navigation, if -
¢ The impact on the area is minor; and
« The structures are constructed in compliance with all the requirements, under any Act, relating to a
Structure of that type
(v) Public benefit works, including, for example, the construction of runnels for mosquito control, the CINo [1 Yes
removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is minor

(a) If yes to one or more of {i) - (v) above, does all the proposed operational work comply'with any applicable Department of
Primary Industries and Fisheries (DP1&F) self-assessable code?

Ol Yes -A permit for that aspect of the operational work is not required. Go to 04.14 0 No - Go to (b)
(b) If no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?

oO No - (Complete Form 1, Part O2) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not
Oo the Assessment Manager for the application. the agency will have junsdiction as Concurrence Agency.
Yes

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

Oo Yes - Unless the application is consistent with any property development plan applying to the and. the Assessment Manager must refuse to
receive il. (Complete Form 1, Part O2} This application requires assessment by the Department of Primary industries and Fisheries
(OPI&F) and assessment for the purposes of the Wild Rivers Act 2005. if DPI&F is not the Assessment Manager for the application, the
agency has jurisdiction as Concurrence Agency.

CONo

Itno, is any of the proposed operational work to be carried out in a wild river high preservation area?

O No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse
to receive it. (Complete Form 1, Part Oz} This application requires assessment by the Department of Primary Industries and
Fisheries (DPI&F) and, subject to the declaration for the retevant wild river area, assessment for the purposes of the Wik Rivers
Act 2005, if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

Oo Yes - An application for the operational work will be taken to be not properly made and the assessment manager must refuse to
receive it. .

 

 

Page 36

Page 42

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA

4.14 | \s afy of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
No-Gotwos15  {_] Yes

 

If yes, is the proposed operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)

(i) The removal, destruction or damage of dead marine wood on unallocated State land, other than in a CINo (Yes
wild river area, for trade or commerce

(ii) The maintenance of existing structures, including, for example, the following structures, if the CONo (1) Yes
structures were constructed in compliance with all the requirements, under any Act, relating toa
structure of thattype— *
+ — boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and
weirs;
+ — existing drainage structures;
.* existing powerlines or associated powerline infrastructure

(iii) For educational or research purposes or for the monitoring the impact of development on marine CINo : oO Yes
plants

{iv) For the construction or placement of structures, including, for example, swimming enclosures, safety []No ([] Yes
signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if -
¢ The extent of the removal, destruction or damage is minor; and
« The structures were constructed in compliance with all the requirements, under any Act, relating
to a structure of that type

(v) For the construction of runnels for mosquito control, removal of Lyngbya, seed collection for site a No O Yes : :
rehabilitation or the collection of marine plants for fishing bait, or handicraft

(a) If yes to one or more of (i) ~ (v) above, does all the proposed operational work comply with any applicable ‘Department of
Primary Industries and Fisheries (DP1&F) self-assessable code?
oO Yes ~ A permit for that aspect of the operational work is not required. Go to 04.15 | No - Go to (0

{b) if no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?

C No - (Complete Form 1, Part O2) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
C1 Yes

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
| Ye - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries
(OPI&F) and, subject to the declaration for the relevant wild river area, assessment for the pumposes of the Wild Rivers Act 2005. It
DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

CINo

if no, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or

infrastructure required to support other development for which a development permit is not required or, if a

development permit is required, the permit is held or has been applied for?

oO YS - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part O2) This application requires assessment by the Department of Primary Industries and Fisheries

(DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
OPI&F is not the Assessment Manager for the appiication, the agency has jurisdiction as Concurrence Agency.

O No - An application for the operational work will be taken 10 be not property made and the Assessment Manager must refuse to receive it.

 

 

 

 

 

Page 37

Page 43

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.3, 9 May 2008
i
WILD RIVER/AREA

4.15

 

 

Is ghy of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No-Gotoas16 (] Yes

: If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
| assessable?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 LJ No (1 Yes

(ii) Animal husbandry activities as defined under the Wild Rivers Act 2005 (No CO Yes

If yes to either (i) or (ii) above, is any part of the premises in the wild river high preservation area?
CI Yes - An application for the operational work will be taken to be not properly made and the Assessmeni Manager must refuse to receive it.
(1 No

If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
a) Yes - An application tor the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
OJ No - Unless the application is consistent vith any property development plan applying to the land, the Assessment Manager must refuse to

receive it (Complete Form 1, Part Qif agriculture. Complete Form 1, Part R if animal husbandry) Subject to the declaration for the

relevant wild rivet area, this application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

we (GP Re

 

je Sard ME er se

he ow, er eM tb Baars AD sae ALA
STATE-CONTROLLED ROAD
4.16

   

 

 

Is ay part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No -Endofsectong {_] Yes

It yes, is the proposed operational work associated with any of the following? (Tick applicable box/es)

{i) A material change of use that is assessable under the planning scheme [CINo [] Yes
(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number of lots [_JNo (_] Yes
abutting the State-controtled road

If no to either or both (i) or (ii) above, and answers to questions in this section of the checklist indicate the proposed
Operational work is assessable under IPA, schedule 8 - Answer (a) - (cj below.

(a) Is any of the proposed operational work associated with access to a State-controlled road?
Oo No Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

(b) Is any of the proposed operational work for filling or excavation?
LI No (Yes

aye is the operational work proposed in a future State-controlled road not defined by route?

No - This application must be referred to the Department of Main Roads (DMR} as Concurrence Agency.
oO Yes - This application must be referred to the OMR as Advice Agency.

{c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,

through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
LNo C Yes

Ifyes, is the operational work proposed in a future State-controlled road not defined by route?
oO No - This application must be reterred to the Department of Main Roads (OMR) as Concurrence Agency.
oO Yes - This application must be referred to the DMR as Advice Agency.

 

 

pot ote ed te

 

 

Page 38

Page 44

INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 21.3, 9 May 2008

SECTION 5 The following question only applies when the application is seeking approval to carry out building work to the

L. extent the work is in a declared fish habitat area.

 

DECLAREDAISH HABITAT AREA

 

5.1

 

NI

Isfhe proposed building work in a declared fish habitat area under the Fisheries Act 1994?
No - End of Section 5 (Yes
It yes, is the proposed building work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)
{i} The maintenance of existing structures, including for example the following structures, if the ONno (1 Yes
structures were constructed in compliance with all the requirements, under any Act, relating toa
structure of that type -
« Boat ramps, boardwatks, drains, fences, jetties, roads, safety signs, swimming enclosures and

weirs;
« — Existing powerlines or associated powerline infrastructure ,
(ii) Educational or research purposes relating to the fish habitat area . CINo : (J Yes
(iti) Monitoring the impact of development on the declared fish habitat area . LINo (Yes

(iv) The construction of structures, including, for example, safety signs, swimming enclosures and aids []No [_] Yes
to navigation, if -
« The impact on the areais minor; and
+ The structures are constructed in compliance with all the requirements, under any Act, relating to
a structure of thattype -

(a) If yes to one or more of (i) - (iv) above, does all the proposed building work comply with any applicable Department of
-Primary Industries and Fisheries (DPI&F) self-assessable code?
oO Yes - A pemit for that aspect of the building work is not required. End of Section 5 CJ No - Go to (b)

(b) if ne to all of (i) - (iv) or no to (a) above, is that proposed building work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?

O No - (Complete Form 1, Part 02) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if OPI8F is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. End of Section 5
OO Yes

If yes, is all of the building work for specified works under the Wild Rivers Act 2005?

oO YeS - Unless the application is consistent with any propery development pian applying io the land, the assessment manager must reluse to
receive il. (Complete Form 1, Part O2) This application requires assessment by the Department of Primary industries and Fisheries
(DPI&F) and, subject to the deciaration for the relevant wild river area, assessment for the purposes of the Wild River Act 2005. if
DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. End of Section 5

LNo .
It no, is any of the proposed building work to be carried out in a wild river high preservation area?

oO No - Unless the application is consistent with any property development plan applying to the land, the assessment manager must
refuse to receive it, (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries
and Fisherles (DPI&F} and, subject to the declaration for tha relevant wild river area, assessment for the purposes of the Wild
River Act 2005. if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency. End of Section 5

O Yes - An application for the building work will be taken to be not properly made and the assessment manager must refuse to receive
it. End of Section 5

 

 

 

 

- Page 39

Page 45

INTEGRATED PLANNING ACT 1997

Page 40

IDAS Assessment Checklist, Version 21.3, 9 May 2008

Page 46

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 21.3, 9 May 2008

SECTION 6 Complete Section 6 if you have received a referral agency response about an aspect of your proposal prior to
making an application.

PRE APPLICATION REFERRAL AGENCY RESPONSE

6.1 REFERRAL MATTERS FOR WHICH A REFERRAL AGENCY RESPONSE HAS HAVE YOU SATISFIED ANY CONDITIONS STATED

BEEN RECEIVED UNDER IPA S3.2.2 - list a separate matter in each row IN THE RESPONSE?

0 Yes Ono | CF Noconditions

 

 

 

 

 

O) Yes (No | ( Noconditions

 

OJ Yes | (1) No | CJ Noconditions

 

O Yes | (J No | (J Noconditions

 

O Yes | C1 No | CD Noconditions

 

© Yes | (No | C Noconditions

 

©) Yes |) No | CO Noconditions

 

 

 

 

 

 

if yes for any of the referral matters listed in the table above - A referral for this matter is not required, and the relevant Part identified in the IDAS Assessment
Checklist is not required to be completed. A copy of the referral agency response and evidence of how you have
Satisfied any conditions stated in the response must be attached to your application.

Jf no for any of the referral matters listed in the table above - The relevant Part identified in the IDAS Assessment Checklist is required to be completed, The
application must be referred to the relevant referral agency, unless the referral agency is the Assessment
Manager.

 

 

 

 

Page 41

Page 47

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

Page 42

Page 48

INTEGRATED PLANNING ACT 1997

APPENDIX 1

IDAS Assessment Checklist, Version 21.3, 9 May 2008

Below is a list of the referrals triggered under the Integrated Planning Regulation 1998, schedule 2 that can apply to an application for building
work assessable against the Building Act 1975. This appendix is pravided for advice only.

This appendix is not required to be completed and lodged where an application involves building work made assessable under the Integrated
Planning Act 1997, schedule 8 for assessment against the Building Act 1975 only.

 

Special fire services - generatly 1.
For more information go to schedule 2 table 1 and
Schedute 2A of the IP Regulation -
hitpwww.legislation.qld.gov.awAgis SleAgls SL ttm

Assessment period 15 days. No response is a deemed
refusal,

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the
building work requires special fire services mentioned in schedule 2A part 1 of the integrated
Planning Regulation 1998 (IP Regulation) or includes an alternative solution assessed against
the performance requirements of the Building Code of Australia.

 

Fire satety tor budget accommodation 2
For more information go to schedula 2 of tP Reguiation - |"
if IA

An application may trigger referral to Qld Fire and Rescue.Services as an advice agency if the
building work the subject of the application requires the installation of a fire safety system for a
budget accommodation building.

 

 

For mote information go to schedule 2 of the IP
Regutatian -
hitpyAvww.leqistation.olfgov.awActs SLs/Acis SL_I.htn|

Spray painting 3. , An application may trigger referral to the Department of Industrial Relations (DIR) as a

For more information go to schedule 2 of the IP 4 gee . a we

Regulation « concurrence agency if the application involves a workplace incorporating spray painting.
btovAyny leqsiaton.qid gov.awAcis SLs/Acts SL I.num .

Ratail meat premises 4. An application may trigger referral to Safe Food Qid as a concurrence agency if the application

involves a retail meat premises.

 

Private health facilities 5
For more information go to schedule 2 of the IP .
Regulation -

http Awww. legislation.qld.gov awActs_SLs/Acts SL_l.Atm

An application may trigger referral to the Department of Health as a concurrence agency if the
application involves a private health facility.

 

 

 

 

Horace area ton ort shoal doltelP 6. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice
Regulation - agency if the application involves a work place area less that 2.3m?.

tov legisiatiog. gi ACE EN tun
girs contiguous te Sahai pal 4, 7. An application may trigger referral to the Department of Main Roads as a concurrence agency
Regulation - or advice agency if the application involves land contiguous to a State-controlled road.

ry

npJAwww legislation. w.awActs Sis/Acts SL ihn
formor Florratoc ge sae aottho 8. An application may trigger referral to the Department of Industrial Relations (DIR) as a
Regulation - concurrence agency if the application involves pastoral workers accommodation.

tpi Ke WV. zh Lnim
For mow nlonraton goto sched 2 ofthe P 9. An application may trigger referral to the Department of Communities as a concurrence agency
Ragulation « . it the application involves a childcare centre.

stati . Hf Lyn}

 

Coastal development

For more information go to schedule 2 of the IP
Regulation -

httovAwwwJegistanon.aki gov. au/Acs Slsfacts SL_Lhym

10. . An application may trigger referral to the Environmental Protection Agency (EPA) as a

concurrence agency if the application involves land completely or partly seaward of a coastal
building line’.

 

integration of land use and public transport

For more information go to schedule 2 of the IP
Regulation -

http www legislation.gld.qov.awAcis SLs/Acts SL_Lhtm

11.

An application may trigger referral to Queensland Transport as a concurrence agency if the
application involves existing or future public transport corridors, or airport operational airspace’.

 

 

 

Raitway safety and efficiency 12. An application may trigger referral to Queensland Transport as a concurrence agency if the
For mare information go to schedule 2 of the IP lication invol fu itway land.

Regulation - application involves future railway land.

https? istation. wWAcis SLs/Acts SUI him

 

 

structure (15), no response is taken to be a deemad approval,

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

‘The focal goverment, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescnbed time, For applications relating to design and
siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all other applications the assessment period is 15 days. Ifno response is received from the
local goverment for an appfication, it is taken to be a deemed refusal However for amenity and aesthetics impact o! particular building work for a single detached class ta or class 10 building or

 

Amenity and aesthetic impact of particutar building
work for single detached ctass 1 building or class 10
building or structure

For more information go to schedule 2 table 1 of the IP
Regulation -

http/iww.Jeasstation.qid.gov au/Ac's SlsfActs SL_Lhtm
Assessment period 15 days. No response is a deemed
approval.

 

 

13. An application will trigger a referral to the local government if it is :

* fora single detached class 1 building or class 10 structure; and
« the local government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the
amenity of the locality; and
— the appearance of the building or structure would be in extreme conflict with the

 

 

 

7 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
* Operational airspace ts as defined under State Planning Policy 1/02 “Development in the Vicinity of Certain Airports and Aviation Facilities”.

APPENDIX 1, Page 1

Page 49

 

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

character of the locality.

 

Whether particutar buildings may be occupied for
residential purposes

For more information go to schedule 2 table 1 of the IP
Regutston -

fitpJAaww.legisiation.gld. gov.auActs SLe/Acts SL ILhtm
Assessment period 15 days. No response is a deemed
refusal.

. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes

may trigger a referral to the local government as the concurrence agency.

 

 

buildings

For more information go to schedule 2 table 1 of the IP
Regulation -

hnpJAyww legislation gid.cav au/Acis SLeActs SL_Lhin

Assessment period 15 days. No respanse is a deemed
refusal.

Design and siting 15. An application may trigger referrat to the local government as the concurrence agency if the

Pega omation go to schedule 2 table | ofthe IP building work does not comply with the performance criteria of parts 11 and 12 of the

hte islalion.ald.gov.auiActs SLs/Acts SL_Lhe Queensland Development Code.

‘Assessment period 5 days. No response isa deemed | 16. An application may trigger referral to the local government as the concurrence agency if the

refusal. building work does not comply with the qualitative statement for building clearance and site
cover.

17. An application may trigger referral to the local government as the concurrence agency if the

building work does not comply with the qualitative statement for performance criteria 4, 5, 7,8
or 9 of the Queensland Development Code, part 11 or 12.

Fire safety in particular budget accommodation 18. An application may trigger referral to the local government as the concurrence agency to

determine the building will comply with the fire safety standard under the Building Act 1975
when the building work has been completed.

 

Higher risk personal appearance services

For mora information go to schedule 2 table 1 of the IP
Regulation -

htovAnwnw Jegislapon.gki. gov awAc's SlsfAcis Sl Lhim
and the QOC part 15.

Assessment period 15 days. No response is a deemed
refusal

19.

An application may trigger referral to the local government as the concurrence agency to
* determine if the building work
© — complies with the performance criteria of the Queensland Development Code, part 15; and

© — the work does not comply with an acceptable solution stated in the part.

 

Building work for residential service
Far more information go to schedule 2 table 1 of the IP

Regulation -
hito/Awwy Jegislation.qld.gov.au/Acts Sls/Acts SL_Lhtm
and the QDC part 20.

Assessment period 15 days. No response is a deemed
refusal.

20.

An application for building work for premises in which residential care service under the
Residential Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be
conducted, will trigger referral to the local government as the concurrence agency.

 

Buitding work for removal or rebuilding

For mere information go to schedule 2 table 1 of tha IP
Regulation -

hip leqislanon aki cov.auActs Sls/Acis Lnsm;

Assessment period 5 days. No response is a deamed
refusal.

i.

An application for the removal and/or rebuilding at another site of a building or other structure,
will trigger referral to the local government as the concurrence agency.

 

Building work for rainwater tank in designated
rainwater tank area

For more information ga to schedule 2 table 1 of the IP
Reguitation -

hitovAvw legislation. qlt.gov.awActs Sls/Acis SL Litm
and the QDC part 25.

Assessment period 15 days. No response is a deemed
relusal.

 

 

22.

An application may trigger referral to the focal government as the concurrence agency to
determine if the building work or structure complies with the relevant performance criteria if -
- © Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of
relevant building work, in a designated rainwater tank area; and
- © Under the Queensland Development Code, part 25, the rainwater tank does not include an
acceptable solution for a relevant performance criterion.

 

 

Disclaimer:

While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by faw DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
teliance on this process and the information contained on this form.

 

 

APPENDIX 1, Page 2

 

Page 50

 

        

'HALSE LODGE"

  
 

 

 

     

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

EXISTING BAYS 15-16

 

 

 

 

 

        

INSTALL PAINTED.CENTRE
LINE FOR PASSING AND
STORAGE IN ACCORD
WITH MUTCD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

  

IN ACCORDANCE WITH MUTCD.
PROPOSED BAYS 2-4
45° ANGLE, 2.6m WIDE, 5:2m DEPTH
AISLE WIDTH 3.7m MIN ,

45° ANGLE, 2.5m WIDE, 5.2m DEPTH
AISLE WIDTH 3.7m MIN
DETAILSAS PER AS 2890.1

 

 

 

 

  

 

 

 

In Association with: DETALS AS PER AS 260.

 

 

 

ous ~ q en dcod

Me Vegen

 

TRAFFIC ENGINEERING CONSULT.

  

EXISTING BAYS 10-14 (REVERSE IN)
(REVERSE 1N) 2m DEEP x EXSTING WIDTH
bam DEEP XEXISTING WIDTH my “e storage to be removed)
fen at } - ~ "NO PARKING” SIGN FIXED
— = SC ce ee ' TO RETAINING WALL 1500 HIGH
0 — a a > |
hee 4 ”
i | 8
tty i 1 ; ,
EXISTING ROCK WALL ows ~ a nite 5 Ct o ”
f 4 5 | “~ 1 Any & i
= 4° 16 A : =
, . * Bam { - * .
“505m EXISTING : os ee
eg A —
= A, a
Boo ‘RROVIDE PAINTED CHEVRON
t | *, ‘ MARKING:T@-FURNING BAY ~——
5 4 OK ACCORDANCE WITH MUTCD
: “F b ose *" en
ronson}
ROPOS WIDE, 4.4m 0
PROPOSED BAYS 5-6 30° ANGLE, 2-3 WIDE, 4.4m

AISLEWIDTH'3.0m MIN a

NOOSA SHIRE COUNCIL

   

 

 

 

 

PROPOSED CAR PARKING

 

CONTOUR

 

 

 

 

 

AT HALSE LODGE, NOOSA HEADS

Consulting Engineers"

 

 

AGN. 62 117 061 659

 

FOR DIANNE HAYES

 

 

 

 

 

 

 

TS Ouryiga Onur bus fy prveras 0 ou Stic Do cache seectbes eer a Cuong AX co nasal ttcmy

 

 

 

 

 

ares ceoee hence spore oan mabe par aEMER porate W Cartes Conan Eng Te
aad fe raamcicn eit ster aay aswel

 

 

 

' _ | . PLANS APPROVED
SIGNATURE: NG mn
fe 6 232i Bo
Be joo
}
COMMENT . oY PUAN OfTaas, -panTme .
DAREENG BAY 1 REMOVED, MOTH OF PAPECNG BAYS 2304: A ara we [pRoPoseD P: ING BAY LAYOUT
ae oo 14
oan w-os-06 7)
"Cecan Ta Beer ‘ome 0140-P0! nevson A oem to
a

 

 

en

 

Page 51

    

       

EXITING BAYS 10- 14
(REVERSE IN)

5.4m DEEP x EXISTING WIDTH

o 15 3 48 6

7.5m

SCALE 1:150 A3

SSE

      
  

EXITING BAYS 15-16
5.4m DEEP x EXISTING WIDTH
(CURRENT STORAGE TO BE REMOVED)

 
  

 

 

 

 

 

 

 

 

 

 

 

 

5.0

 

 

 

 

 

 

 

 

 

 

      

TRAFFIC ENGINEERING CONSULTANT

=
"As

rE

In Association with:

%. CONTOUR

_ Consulting Engineers
. ABN. 62 117 061 659

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

°
m EXISTING
te
~ 4
. ook L
4.4m t
4.4m ' ~ i “
rT > , . i
— | oa Sea aa
1 re. | | _ | ] Lo
~ NOB, ai.
REVERSE TURNING PATH REVERSE TURNING PATH pro SHIRE Curie
FOR BAYS I0.- 14 FOR TURNING BAY Ns APPR
SIGNATURE, ‘ eo
Dare, oD ™ Steer.
TE eS he
an
PROPOSED CAR PARKING een = a ns : PROPOSED PARKING BAY LAYOUT
AT HALSE LODGE, NOOSA HEADS Src as | TYPICAL TURNING PATHS
FOR DIANNE HAYES a |
G2 ;
Oe Oe tee eet ote spar re or Sa a eet Rwy oy

 

 

 

 

 

 

 

 

AAR BAe

 

Page 52

    

 

 

 

    

In Association with:

sag 2

(REVERSE IN)

EXITING BAYS 10- 14

5.4m DEEP x EXISTING WIDTH

 

 

 

 

 

 

 

4.4m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REVERSE TURNING PATH

CONTOUR
Consulting Engineers
. ABN. 62 117 061 659 .
ep FE i:
Ra

FOR BAYS 10 - 14

PROPOSED CAR PARKING

AT HALSE LODGE, NOOSA HEADS
FOR DIANNE HAYES

     

 

 

 

        

Qo 15 3 45

SCALE 1:150 A3

EXITING BAYS 15-16
5.4m DEEP x EXISTING WIDTH

  

 

 

 

 

 

 

 

REVERSE TURNING PATH
FOR TURNING BAY

 

 

 

 

 

 

© Tri pana Copyright Oar ts orb purponee of are itr © tm conve poner under bu Coprigt AA co pant ey hay boar by

(yan be reproduced. Dora: faa review Bysien or txnacled wit Pe pier wellan porriaalon of Caracur Conwuling Enghtwert. Tha flan sa nck

 

 

 

 

 

 

 

 

 

 

 

 

| PLAN TITLe

PROPOSED PARKING BAY LAYOUT
- TYPICAL TURNING PATHS
°

 

ws ACAN AAA

Page 53

 

 
  

   

DEVE
(Cashie’

Sunshine Coast

Regional Council __
APPLICATION AND GENERAL FEES

   
   
   
    

 
 
   
   
  
 

"AMOUNT |
Road / Drainage Plan Exam
Road / Drainage Field Inspection
Legal Document Examination

728

  

 

MENT FEES & CONTRIBUTIONS
ase Retum to Admin Officer, Development)
| RECEIPT TYPE | BONDS - Bond Refund Details

Application Fees [Payes Namen

 

Sealing Fee - Survey Plans, Legal Documents

 

 
  
   

  

    

 
 

 

 

Sale of Documents, Policy Lists, Misc

 

 

Bonding Admin Fee (Contributions, uncompleted works)

 

Closed Circuit TV Inspection

 

 

   
  

Pre-lodgement Meeting Fee
CONTRIBUTIONS _

Developer Contribution Landscaping _

 
   
  
 
  
  

 

 

  

Developer Contribution - Road Other than PSP

 

Developer Contribution - Drainage Other than PSP

 
   

 

  
 
  

Developer Contribution ~ Pathway Other than PSP

Developer Contrib. — tn Lieu Off St Parking (PSP13 Car parking)

Developer Contribution - Other Parks and Community ee ee

  
 
  

 
 

ROADWORKS CONTRIBUTIONS __

     

 

 

 

ICS - Community Land (Not currently active) | ———s—s—s«dT 860 Catchment:
ICS - Public Transport 561
ICS - Sewerage (PSP Rural) 557 Road/Section:

 

  
    

 

 

 

 

    
 

 

 

  

 

   

 

 
 

 

  

ICS ~ Sewerage (PSP Coastal) {| 613

ICS — Sewerage - South Peregian (PSP Maroochy) 681 | APPLICATION DETAILS _ __ “i
ICS - Water Supply (PSP) 614 Payee Name: j4 arse Loo ce Coect Hose Pu.

ICS - Sport and Recreation Land (PSP Parks) 559 Address: lm

ICS - Drainage (PSP Noosaville Master & Ward Street) 581 ct © Peocson

ICS - Road (CMRNICP) If BA not entered then use 594 583 2 Nalse Ia

ICS - Pathway (PSP) 584 Woosa years

  

4567

 

 
     
 

Total of Fees Paid (Excluding Bonds)

CPI Date:

Security Deposits/PerformancelMaintenance/ Uncompieled Works Bond

    
   
 

 

    

Total of Fees Paid (Including Bonds)

  
 
 
 

    
     
 
  

— Location:

File Numbers or Reference:
i4 -2005 NAS -)
Date application properly made:

ReceiptNo: 408

 

 
 

  
 

[Receipt Dates 977771 _|

 

 

PsALand DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc

 

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1193 - Operational Works - Access, Car Parking [As Published].pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.