INTEGRATED PLANNING ACT 1997 ‘DAS Assessment Checklist, Version 21.3, 9 May 2008
CONTAMINATED LAND ~ REGISTERED LAND
25
ironmental Protection Act 1994?
Is any part of the land forming the premises on the Environmental Management Register or Contaminated Land Register under the
&
efi - Go to 02.6 0 Yes
If yes, does one or more of the following apply?
(i) A Suitability statement has been given and a site management plan has been approved for the LINo () Yes
proposed use of the land, and the proposed use involves only the following -
+ the fit-out of a building on the land; or
* minor site excavation, including for example, post holes for open-sided non-habitable ‘structures
“(ii) There is currently a notifiable activity on the land and the activity is continuing CINo : OC Yes
‘(ii), The proposed use is industrial and only involves minor site excavation (e.g. post holes for open-sided LINo -( Yes
non-habitable structures) ;
{iv) The land is used for a mining activity or petroleum activity No : C] Yes
If no to alt (i) - (iv) above - (Complete Form 1, Part N} This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IA SOM EE acd MEE PANG ote ratte aahtet etal!
CONTAMINATED LAND - NOTIFIABLE ACTIVITY
26
nofitiable activity?
No - Go to. 02.7 Yes
If yes, does one or more of the following apply?
(i) A suitability statement, removing the land from the environmental management register, hasbeen (] No ‘(_] Yes
given under the Environmental Protection Act 1994 for the existing use, or if there is no existing use,
the last use, and the following both apply -
* —nonew notifiable activity has occurred on the land since the suitability statement was issued;
«the land is not otherwise contaminated by a hazardous contaminant
(ii) A suitability statement has been given and a site management plan has been approved for the LIJNo (J Yes
proposed use of the land, and the proposed use involves only the following -
the fit-out of a building on the land; or
* — minor site excavation, including for example, post holes for open-sided non-habitable structures
(iii) The land is used for a mining activity or petroleum activity CJ No [1 Yes
rol part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for a
ifno to alt (i) - (ili) above - (Complete Form 1, Part N) This application requires assessment by the Environmental protection Agency (EPA). If EPA is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
OAT bMS BT: WP Flag
CONTAMINATED LAND - INDUSTRIAL ACTIVITY
27
Is ayly part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there is no
exjéting use was it last used for an industrial activity (other than for a mining activity or petroleum activity)?
No ~ Go 1002.8 (1 Yes
it yes, is the proposed use for child care, educational, recreationat or residential purposes {including a caretaker residence on
industrial land)?
No oO Yes - (Complete Form 1. Part N) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is
not the Assessment Manager for the application, it has jurisdiction as Concurrence Agency.
WE gerete8 & per", adie? PReypie crete! bie d en 22 .
Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1193 - Operational Works - Access, Car Parking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.