Council archive · source document
08/1193 - Operational Works - Access, Car Parking [As Published] · 142008.1193
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.3, 9 May 2008
SECTION 3 Section 3 must be completed when the application seeks approval to reconfiguring a lot. 72 s+
Rebuutt tabia’
STATE-CONTROLLED ROAD
3.1
ey part of the premises located in part of a future State-contralled road, or within 100m of a State-controlled road?
No
Ifno, is the proposed reconfiguration listed in Integrated Planning Regulation 1998, schedule 5 and does it exceed the threshold?
O No CJ Yes - The application must be referred to the Department of Main Roads (DMR) as Concurrenoe Agency.
CJ Yes
It yes, will the proposed reconfiguration result in the following?
(i) An increase in the total number of lots LINo (1 Yes
(ii) An increase in the total number of lots abutting the State-controlled road LI No CI Yes
{yes to either or both (i) or (ii) above, is the reconfiguration proposed in a future State-controlled road not defined by route?
Q Yes - This application must be referred to the Department of Main Roads (MR) as Advice Agency
Ol No - This application must be referred to OMR as Concurrence Agency.
I Sageats: poneccie® tute tae IPB wn?
Se te Atha
COASTAL MANAGEMENT DISTRIC
32 A9ery part of the premises within a coastal management district?
No - Go 0.03.3 oO Ye - This application must be referred to the Environmental Protection Agency (EPA) as Concurence Agency.
Phege anon sseage L ? ten’
VEGETATION CLEARING
3.3 | Do the premises include a lot containing the following?
() Acategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) , (] No OO Yes
(ii) If there is no PMAV for a lot, remnant vegetation (No O Yes
If yes to either or both {i} or (ii) above, are 2 or more lots proposed to be created?
(No -Gotoas4 [] Yes’
If yes, is any lot, before the proposed reconfiguration, 2ha or larger?
LINo-Gotoaae 7] Yes
Ityes, is the size of any lot proposed to be created, 25ha or smaller?
Cl No - Go 0 03.4 O Yes - (Complete Form 1, Part J} This application must be referred to the Department of Natural Resources
and Water (NRW} as Concurrence Agency.
Is any part of the premisegsubject to an easement?
[INo-Gotass — f¥] Yes - Answer both (a) and {b} below
rif or supply network under that Act?
(a) Js thgre an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 for a transmission
wf
No Oo Yes - This application must be referred to the entity as Advice Agency.
conétruction or operation of the Moonie to Brisbane strategic pipeline under that Act?
{b) sole an easement in favour of the holder of Pipeline Licence Number 4 issued under the Petroleum Act 1923 for the
No O Yes - This application must be referred to the licance holder as Advice Agency.
IP Reguation. schedule 2. table 2, tem 20ta) feecincty easement, [P Regulation sonedule 2. table 2. rem 32 (pipeline easement)
ELECTRICITY SUBSTATIONS
35
's Any part of the premises situated within 100m of a substation site under the Electricity Act 1994?
No - Go 0 03.6 O Yes - This application must be referred to the entily responsible for the substation as Advice Agency.
Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1193 - Operational Works - Access, Car Parking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.