Council archive · source document
08/1193 - Operational Works - Access, Car Parking [As Published] · 142008.1193
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
SEQ REGIONAL PLAN (cont)
(b)_ Is any part of the premises within the Regional Landscape and Rural Production Area or in the Investigation Area?
No-Gota312 (1) Yes - Answer (ij - (ii)
(i) _ Is any part of the premises located in a rural precinct or an interim rural precinct and is any jot resulting from the
subdivision proposed to have a fot size smaller than the minimum stated in the relevant planning scheme for the
precinct?
[No - Goto (iif (] Yes - Complete Table 1
TABLE 1 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if applicable}
The subdivision:
(i) Creates a residual lot CINo (Yes
(ii) Creates the same number or fewer lots than the number of !ots being subdivided oO No a Yes
(iii) Creates a single additional lot when an existing lot is severed by a road that was gazetted before2 []No [_] Yes
March 2006 ,
{iv) Creates a single additional lot for an emergency services facility LINo (] Yes
{v) Creates a single additional lot for a water cycle management infrastructure [No [Yes
(vi) Creates a single additional lot for waste management facility LINo (1 Yes
(vil) Creates a single additional lot for tetecommunications infrastructure CINo (Yes
(viii) Creates a single additional tot for electricity infrastructure . LINo (7 Yes
(ix) Creates a single additional lot for cemetery or a crematorium LI No a Yes
{x} _ Is being carried out in association with a development approval for a material change of use of LJNo ‘C1 Yes
premises that has not lapsed, if the development approval was for a development application that
was made before 31 October 2006
(xi) Is being carried out in association with a development approval for a material change of use of [LNo [1 Yes
premises that -
* was given for development made assessable under SEQ Regional Plan Regulatory Provisions,
section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
« has not lapsed
{xii} Is ina rural village as defined under the SEQ Regional Plan Regulatory Provisions LINo [J Yes
(xiii) Is for a rurat residential purpose for land located in the Mt Lindesay/North Beaudesert Study Area ([_JNo [_] Yes
and - ‘
+ the development application or development application (superseded planning scheme) for the
subdivision is properly made before 2 March 2008; and
+ the subdivision relates to land located in a zone or equivalent designated area mentioned in a
notice published in the gazette by the regional planning Minister
{xiv) Is being carried out under - LINe (1 Yes
+ anexemption given by the regional planning Minister for an application for exemption lodged
before 30 September 2005; and
¢ adevelopment approval for a development application that is properly made within six months of
the exemption being given by the regional planning Minister
(xv) Involves the extension of an existing lease or licence over tand if - LJNo LJ Yes :
* no additional lots are created; and :
+ any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous lease or licence; and :
+ _ the previous lease was obtained before 31 October 2006 i
(xvi) Creates lots for a purpose or is being carried out in association with development other than those [No (1 Yes
stated in (i) - (xv) above :
If yes to other development under (xvi) above - The subdivision is prohibited and an application involving that component cannot be made. Go to
(@) on the next page of this Checklist.
Page 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1193 - Operational Works - Access, Car Parking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.