08/1193 - Operational Works - Access, Car Parking [As Published] · 142008.1193
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
SEQ REGIONAL PLAN (coni)
(iii) For all lots, other than those affected by {i) and (ii) above, is any lot resulting from the subdivision proposed to
have a lot size of less than 100 hectares?
(No -Got0aa12 [[] Yes - Complete Table 3
TABLE 3 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if applicable)
The subdivision:
() Creates a residual lot LINo [] Yes
(ii) Creates the same number or fewer lots than the number of lots being subdivided LINo [1] Yes
(iii) Creates a single additional lot when an existing lot is severed by a road that was gazetted before2 [_]JNo [] Yes
March 2006
{iv) Creates a single additional lot for an emergency services facility oO No [1 Yes
: {v) Creates a single additional lot for a water cycle management infrastructure a No ‘Ll Yes .
(vi} Creates a single additional lot for waste management facility LINce (1 Yes
(vii) Creates a single additional lot for telecommunications infrastructure i) , Oo Yes
(viii) Creates a single additional lot for electricity infrastructure [No [LJ Yes
(x) Creates a single additional lot tor cemetery or a crematorium LJNo [Yes
{x)_ Is being carried out in association with a development approval for a material change of use of LINo -[] Yes
premises that has not lapsed, if the development approval was for a development application that
was made before 31 October 2006
(xi) Is being carried out in association with a development approval for a material change of use of LINo (Yes
premises that -
* was given for development made assessable under SEQ Regional Plan Reguiatory Provisions,
section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
+ — has not lapsed
(xii) Is in a rural village as defined under the SEQ Regional Plan Regulatory Provisions LINo [1] Yes
(xiii) Is for a rural residential purpose for land located in the Mt Lindesay/North Beaudesert Study Areaaand- [_]No ([] Yes
+ the development application or development application (superseded planning scheme) for the
subdivision is properly made before 2 March 2008; and
+ _ the subdivision relates to land located in a zone or equivalent designated area mentioned in a
: notice published in thie gazette by the regional planning Minister : ‘
* (xiv) Is being carried out under - CINo Yes
* an exemption given by the regional planning Minister for an application for exemption lodged
before 30 September 2005; and
+ « adevelopment approval for a development application that is properly made within six months of
the exemption being given by the regional planning Minister
(xv} Involves the extension of an existing lease or licence over land if - LINo [Yes '
* no additional lots are created; and
* any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous tease or licence; and
+ _ the previous tease was obtained before 31 October 2006
(xvi) Creates lots for a purpose or is being carried out in association with development other than those []No [_] Yes
stated in (i) - (xv) above
it yes to other development under {xvi) above - The subdivision is prohibited and an application involving that component cannot be made. Go to
O32
Smaula 2 table 6 ton
Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1193 - Operational Works - Access, Car Parking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.