Council archive · source document
08/1193 - Operational Works - Access, Car Parking [As Published] · 142008.1193
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS) (cont)
{ii}, For any part of the premises, does the relevant planning scheme state a minimum lot size of greater than the
number stated in section 3.2(1)(a) of the draft regulatory provisions and is any lot resulting from the subdivision
proposed to have a lot size less than that stated size?
LI No - Go #0 fii) (1 Yes - Complete Table 2 .
TABLE 2 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if applicable)
The subdivision:
(i) Creates a residual lot as‘defined in Schedule 2 of the draft regulatory provisions (1No [1 Yes
(ii) Creates a single additional lot under section 3.2(2)(b) of the draft regulatory provisions (ino [] Yes /
(iii) Creates a single additional lot for an emergency services facility CINo [J Yes
(iv), Creates a single additional lot for water cycle management infrastructure (MNo (Yes
(v) Creates a single additiona! lot for a waste management facility LI No Oo Yes .
‘Wi Creates a single additional lot for telecommunications infrastructure (No L Yes
(vil) Creates a single additional lot for electricity infrastructure CINo [1] Yes
(vill) Creates a single additional lot for cemetery or a crematorium [No Llves !
(ix) Is being carried out in association with a development approval for a material change of use of Cno (Yes
premises that has not lapsed, if the development approval was for a development application that '
was made before the day the draft regulatory provisions for the designated region took effect
(x) Is being carried out in association with a development approval for a material change of use of CMINo [Yes
premises that - 1
+ — was given for development made assessable under the draft regulatory provisions, section 2.4,
2.6, 2.8, 2.10, 2.12, or 2.14; and
« has not lapsed
(xi) Is in a rural village as defined in Schedule 2 of the draft regulatory provisions [INo [1] Yes ,
(xti) Is for a rural residential purpose as detined in Schedule 2 of the draft regulatory provisions and - CINo (Yes
+ _ the development application or development application (superseded planning scheme) for the
subdivision is properly made within two calendar years from the day the draft regulatory
provisions for the designated region took effect ; and
. * the subdivision relates to land located in a zone listed in Schedule 1 Table 3 of the draft
regulatory provisions for the designated region
(xiii) Involves the extension of an existing lease or licence over land if - ‘CINo (Yes
: * no additional lots are created; and
* — any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous lease or licence; and
+ _ the previous lease was obtained before the day the draft regulatory provisions for the designated
region took effect
(xiv) Is development that is - LINo () Yes
« — declared to be a significant project under section 26(i}(a) of the State Development and Public
Works Organisation Act 1971 or located in a State development area; and
* — confirmed in writing by the Regional Planning Minister to be exempt from these draft regulatory
provisions
(xv) Creates ‘. for a purpose or is being carried out in association with development other than those = [_] No CG Yes °
stated in {i} - (xiv) above ‘
If yes to other development under (xv) above - The subdivision is prohibited and an application involving that component cannot be made. Go to
(i)
Page 23,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1193 - Operational Works - Access, Car Parking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.