08/1193 - Operational Works - Access, Car Parking [As Published] · 142008.1193
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.3, 9 May 2008
i
WILD RIVER/AREA
4.15
Is ghy of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No-Gotoas16 (] Yes
: If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
| assessable?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 LJ No (1 Yes
(ii) Animal husbandry activities as defined under the Wild Rivers Act 2005 (No CO Yes
If yes to either (i) or (ii) above, is any part of the premises in the wild river high preservation area?
CI Yes - An application for the operational work will be taken to be not properly made and the Assessmeni Manager must refuse to receive it.
(1 No
If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
a) Yes - An application tor the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
OJ No - Unless the application is consistent vith any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Qif agriculture. Complete Form 1, Part R if animal husbandry) Subject to the declaration for the
relevant wild rivet area, this application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
we (GP Re
je Sard ME er se
he ow, er eM tb Baars AD sae ALA
STATE-CONTROLLED ROAD
4.16
Is ay part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No -Endofsectong {_] Yes
It yes, is the proposed operational work associated with any of the following? (Tick applicable box/es)
{i) A material change of use that is assessable under the planning scheme [CINo [] Yes
(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number of lots [_JNo (_] Yes
abutting the State-controtled road
If no to either or both (i) or (ii) above, and answers to questions in this section of the checklist indicate the proposed
Operational work is assessable under IPA, schedule 8 - Answer (a) - (cj below.
(a) Is any of the proposed operational work associated with access to a State-controlled road?
Oo No Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
LI No (Yes
aye is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMR} as Concurrence Agency.
oO Yes - This application must be referred to the OMR as Advice Agency.
{c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
LNo C Yes
Ifyes, is the operational work proposed in a future State-controlled road not defined by route?
oO No - This application must be reterred to the Department of Main Roads (OMR) as Concurrence Agency.
oO Yes - This application must be referred to the DMR as Advice Agency.
pot ote ed te
Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1193 - Operational Works - Access, Car Parking [As Published]Related documentApplication case desk ↗