Skip to the record
The gold standard in government transparency.

Council archive · source document

08/1193 - Operational Works - Access, Car Parking [As Published] · 142008.1193

of 53

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

Naluteoftheworks ag

1. Nature of work that requires assessment ana a planning scheme:
(1) Building work - Complete Table A Operational work - Complete Table B
Table A

 

INTEGRATED PLANNING ACT 1997 , Part E, Version 3.1, 3 March 2008

eee

    

   
 

 

Building &/or operational work assessable against a p afining scheme 2008 be

iad .

 

 

 

(i) What is the nature of the building work made assessable in the planning scheme?

(ji) Are there any current approvals associated with this application? (e.g. material change of use)

 

 

 

 

 

 

 

 

 

CINo (1 Yes - Provide details below
List of approval reference/s Date approved Date approval lapses {if known)
[ 1.
Table B '
(i) What is the nature of the operational work made assessable in the planning scheme? ;
[Roadworks LC Stormwater (] Water infrastructure] Clearing vegetation under the planning scheme
(2 Drainage works  ([] Earthworks LO Sewerage infrastructure 1. WE WACL AX G«
C1 Landscaping DO Signage DJ Other - specify ‘SO ASHIAVAG SAT 18 BA

 

(iii) What type of approval is being sought? (NOTE: it you have indicated multiple operational works in question (i) above and your answers fo this question
would be different for different operational work, if may be more appropriate to provide these details in an attachment to this form}

C1 Development Permit LO Preliminary Approvat (1 Both (Specify below)
[Sew SSAU swe |

<
(iv) stp operation work necessary to facilitate the creation of new lots (ie. subdivision)?
No (7) Yes - Specify the number of lots being created

 

 

 

 

 

(v) Arg‘there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a fot)
No C1 Yes - Complete Table B(a)
Table B(a) TS 77 List of approval references _. _., |, .2Date approved”. “:] Date approval lapses (if known)

1.

 

 

 

 

 

 

 

 

 

 

2. Whatis the dollar value of this operational work? (ie. the fotal value including GST, materials and labour)

 

 

 

te oe PM f x

 

  

  
 

 

Configmation of lodgement| Method of lodgemerit

 

 

Plafig, and Specifications if applicable, showing the nature and location of thé proposéd works (etuding the
extent of any cut.end fil!" 7 ieee ao - Confirmed

 

 

 

 

OFFICE USE ONLY

 

fe ars.
Date received

 

 

 

 

 

ike

 

Advice for completing Part E

 

General advice

Part A must also be completed for all IDAS development applications, .
The applicant Is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

 

 

| A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur,

 

Page 1

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1193 - Operational Works - Access, Car Parking [As Published].pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.