Skip to the record
Every meeting, every word.

Council archive · source document

Town Planning Assessment Report · MCU25/0020

of 41

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                           INFRASTRUCTURE

 Infrastructure Agreement applicable?                  Not applicable

 Existing lawful use for residential Development:      Vacant land (prior dwelling house)

 Total lawful residential development on the site      1x4 bedroom dwelling house
 upon completion of the proposed development:

 Existing impervious area (m²). Non-residential        Not applicable
 development only

 Total impervious area (m²) on the site upon           Not applicable
 completion of the proposed development.
 Non-residential development only.

 Existing Non-residential GFA                          Not applicable

 Total GFA – Non-residential upon completion of        Not applicable
 the proposed development

 Services available/​                                  Water (Y)​
 connections to the property                           Sewerage (Y)​
                                                       Electricity (Y)​
                                                       Telecommunications (Y)


5.0 STATE PLANNING PROVISIONS

5.1 State Planning Interests

The Planning Act 2016 provides the framework and process of planning instruments and processes for
development applications. The following planning instruments have been considered in this application
and are discussed in further detail below in the State Planning Policy (SPP), South East Queensland
(SEQ) Regional Plan, State referral requirements, State development assessment provisions (SDAP), and
Schedules 10 and 11 of the Planning Regulation.

5.2 State Planning Policy (SPP)

Part E of the State Planning Policy provides a comprehensive review of the state interests, the related
policies and assessment benchmarks under five broad themes. Section 2.1 of the Noosa Plan 2020
confirms it integrates all State Planning Policies of the State Planning Policy into the Planning Scheme
with the exception of Natural Hazards, Risk and Resilience - coastal hazards - in part. Refer attached civil
engineer response and flood search certificate in relation to coastal hazard compliance.

5.3 Regional Plan

Section 2.2 of the Planning Scheme confirms it appropriately advances the SEQ Regional Plan. No further
assessment is required.




                                                                                                          8

Used in these records

About this file

File size
8.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Town Planning Assessment Report.pdf · 8.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.