Original source · versioned page text
2015-12-14 General Committee Agenda Attachment 1 to Item 3 Noosa Shire Economic Plan
The original of this document is very large (12.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnCouncil may take on a variety of roles in the Change will be measured across the following
implementation of projects that result from this timeline:
Local Economic Plan. These may include facilitation,
• Statistics reflect movement at year 3
information sharing and partnership activities.
• Trend is demonstrated at year 5
Progress on the Local Economic Plan and priority
• Systemic change achieved at year 7
actions will be reviewed and reported to council and
the community annually. The Action Plan with be 3. Economic performance will be considered
amended and updated to reflect the outcomes of the alongside Council’s broader sustainability
annual review process. Implementation Plans with measures that will be developed to accompany
then be developed to achieve these actions. Council’s Sustainability Principles. These
measures will be an integral to assessing the
A three tiered measuring process will be used to success of the Local Economic Plan.
determine to what extent the desired economic
outcomes are being achieved.
1. Projects included in the annual Implementation
Plan will be monitored in regard to process and
success.
2. Key data will be gathered on an annual basis to
track and monitor the state of the local economy
and to inform the review of this Plan. This will
include but not be limited to:
Measures Target
Growth in gross regional product Above the Queensland average
Growth in gross regional product compared to population growth GRP growth exceeds population growth
Growth in gross regional product in each of the defined priority
Year-on-year increase
industry sectors
Unemployment rate compared to state average Lower than state average
Average income growth Higher than the state average
Councils Economic Tool Box
• Direct links to other levels of Governments
• Procurement
• Planning scheme and compliance
• Infrastructure hard and soft
• Economic programs and internal resources
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.