9.3 Appendix C - Site Specific Tree Protection Table
When to      Proposed task                      Trees Id     Tree Protection Measure                           To be Certified
perform task
Prior to     Install Tree Protection            All trees    Tree Protection Fencing is to exclude trees       Project Arborist – level 5
works        Fencing as per the Tree            assessed     from the project where possible. Either           Consulting Arborist to
             Management Plan.                   and road     situated at the extent of existing                supervise works and provide a
                                                verge        infrastructure or to calculated TPZ.              Certification Report on
                                                trees.                                                         completion of works


               Stem protection                  1, 2         Stem protection is to protect the tree from
                                                             accidental contact from machinery or
                                                             vehicular movement.
During       Demolition and removal of          1, 2, 3      Supervision required to assist civil team to      Project Arborist – level 5
construction existing infrastructure, cut /                  work safely through the root zone of trees.       Consulting Arborist to
             fill or excavation works for                    Tree root management may be required by           supervise works and provide a
             infrastructure reinstatement                    the Project Arborist. E.g. root pruning           Certification Report on
             required as part of the                                                                           completion of works
             project within the TPZ /
             SRZ of trees to be retained.
Completion Conduct final Certification          All trees Final Certification that Tree Protection             Project Arborist – level 5
of works     Assessment of retained             assessed measures have been implemented through                Consulting Arborist to provide
             trees                              and road all stages of construction                            a Final Certification Report.
                                                verge
                                                trees.




                         Tree Report: (AIA-27 Bayview NH-120226)                        Report Number:      (001)
                         Prepared by (Sam Carr – Specialist Arbor Services Pty Ltd)                   Page 18 of 26

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Attachment 3 - Arborcultural Impact Assessment Report.pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.