RFI - Attachment 3 - Arborcultural Impact Assessment Report · 132003.221108.3
3.3 Tree Protection Plan and Recommendations
Tree Species NRZ SRZ Protection Measures
ID (m) (m)
1 Ficus 7.32 2.71 Erect NRZ fencing to the existing hard standing
benjamina surfaces – excluding the tree from the work site.
Weeping Fig Project arborist super vision required for any
demolition/excavation works within NRZ.
Stem protection recommended.
2 Eucalyptus 9 3.04 Erect NRZ fencing to the existing hard standing
microcorys surfaces – excluding the tree from the work site.
Tallowwood Project arborist super vision required for any
demolition/excavation works within NRZ.
Stem protection recommended.
3 Ficus 9.36 2.98 Erect NRZ fencing to the existing hard standing
benjamina surfaces – excluding the tree from the work site.
Weeping Fig Project arborist super vision required for any
demolition/excavation works within NRZ.
4 Elaeocarpus 6 2.47 Erect NRZ fencing to the existing hard standing
obovatus surfaces – excluding the tree from the work site.
Hard
Quandong
5 Buckinghamia 2.28 1.79 Erect NRZ fencing to the existing hard standing
celsissima surfaces – excluding the tree from the work site.
Ivory Curl
Tree
6 Cupaniopsis 3.6 2 Erect NRZ fencing to the existing hard standing
anacardioides surfaces – excluding the tree from the work site.
Tuckeroo
Roadside trees situated to the east and west of the property and trees opposite the property should
be protected by temporary fencing. The fencing is to be installed to the edge of existing
tarmac/concrete to mitigate accidental vehicle encroachment and storage of materials.
3.3.1 General Tree Protection Measures
The following protection measures and low impact methodologies have been provided to ensure the
subject tree is not impacted during excavations.
Appoint a Project Arborist (PA)
The PA should hold an AQF5 in Arboriculture and have at least 5 years’ consultancy experience.
The role of the PA is to provide guidance and clarification on the tree protection methods outlined
in this report. Additionally, the PA is to be available to provide feedback and ongoing assessments
of the tree and its protection measures throughout and following the development of the site, when
necessary.
Tree Protection Zone (TPZ/NRZ) fencing
A temporary TPZ fence is to be installed to protect as much of the calculated TPZ as practical. The
TPZ fence should meet the following criteria:
- The fence should be installed as soon as practical.
- The fence can be comprised of safety mesh or similar.
- No materials should be stored within the fenced off area.
- The fence should not be removed until the development has concluded.
Tree Report: (AIA-27 Bayview NH-120226) Report Number: (001)
Prepared by (Sam Carr – Specialist Arbor Services Pty Ltd) Page 7 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 3 - Arborcultural Impact Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.