Skip to the record
Beware of cheap imitations.

Council archive · source document

RFI - Appendix D- Stormwater Management Plan · MCU22/0140

of 26

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                              ingeniir


 STORMWATER
 MANAGEMENT
 PLAN
215101-SMP-01

Proposed Duplexes
7 Ruby Street
Cooroy 4563
Lot 616 on C56014




Ingeniir Pty Ltd
NOVEMBER 22
Authored by: Daniel Kenna
for and on behalf of Ingeniir Pty Ltd.




                                                 Ingeniir Pty Ltd | 215101-SMP-01
                   ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                            Page 1 | 14
Full text of the other 25 pages

Page 2

                                                                                                              ingeniir



 DOCUMENT INFORMATION
 Document Reference      Date                   Author                     Reviewed                          Review Date
 215101-SMP-01           26/04/2022             Daniel Kenna               Daniel Kenna                      02/08/2022
 215101-SMP-01           03/11/2022             Daniel Kenna               Daniel Kenna                      03/11/2022


© Ingeniir Pty Ltd (2022) All Rights Reserved. Copyright in the whole and every part of this document belongs
to Ingeniir Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in part in any
manner or form or in or on any media to any person without the prior written consent of Ingeniir Pty Ltd.


 DOCUMENT DETAILS & CERTIFICATION
 Report Title                Stormwater Management Plan
 Document Reference          215101-SMP-01
 Street Address              7 Ruby Street, Cooroy
 Legal Description           Lot 616 on C56014
 Prepared for                Robyn Kildey
 Revision                    02
 Date                        03/11/2022
 Prepared By                 Daniel Kenna
 For and on behalf of        Ingeniir Pty Ltd
 Certified By                Daniel Kenna
 Qualifications              RPEQ 15522
 For and on behalf of        Ingeniir Pty Ltd
 Signed
 Date                        03/11/2022




                                                Ingeniir Pty Ltd | 215101-SMP-01
                  ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                           Page 2 | 14

Page 3

                                                                                                           ingeniir

EXECUTIVE SUMMARY

Ingeniir Pty Ltd (Ingeniir) have been engaged by Robyn Kildey to produce this Stormwater Management Plan
(SMP) in support of the Material Change of Use application for the Proposed Duplexes at 7 Ruby Street
Cooroy 4563, Lot 616 on C56014.

This report is comprised of stormwater quantity and quality assessments. The quantity assessment is
undertaken to confirm a ‘non-worsening’ discharge of peak flow from the developed site. The quality
assessment is undertaken to determine the required stormwater treatment measures to be implemented on
site to comply with Local and State Authority requirements.

Stormwater Quantity Calculations consider storm events up to and including the 1% AEP storm event. The
purpose is to ensure that the existing infrastructure and/or downstream properties are not adversely
affected by the proposed development.

The stormwater quantity assessment determined that a measurable increase to the impervious area will
occur due to the proposed development which would result in an increase to peak discharge rates if no flow
mitigation were implemented. On-site detention measures are proposed for this development to mitigate
stormwater flows for the development.

Currently no quality stormwater management measures are in place for the existing subject site. As the
proposed development area is less than 2500m2; best-management practice for stormwater treatment
measures are to be implemented on site in accordance with current Industry Best Practice, WSUD Engineering
Guidelines and State and Local Stormwater Quality Objectives.

All relevant standards and guidelines are addressed in this Stormwater Management Plan including;
criteria from the Queensland Urban Stormwater Quality Planning Guidelines (2010), Queensland Urban
Drainage Manual (QUDM) and the Australian Rainfall and Runoff Guidelines.




                                              Ingeniir Pty Ltd | 215101-SMP-01
                ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                         Page 3 | 14

Page 4

                                                                                                           ingeniir

1.    INTRODUCTION

Ingeniir Pty Ltd (Ingeniir) have been engaged by Robyn Kildey to produce this Stormwater Management Plan
in relation to the Proposed Duplexes Development at 7 Ruby Street Cooroy 4563, Lot 616 on C56014.

There are no existing approvals over the allotment.


2.    EXISTING SITE CONDITIONS
The site is legally described as Lot 616 on C56014, with an allotment area of 1012m2. The site is located within
the Noosa Shire Council local government area.




                                                                     SITE




                                                  Plate 1: Site Locality



The site currently has an existing residential dwelling, sheds and driveway on site. The site elevation ranges
from approximately 107m in the rear right (North-East) to 169.4m at the front left (South-West) of the
allotment. Currently the roof water of the residence discharges to the kerb on Ruby Street and surface flows
generally discharge to the neighbouring property on the West. The shed at the rear and a rear portion of the
allotment currently drain to Opal Lane.

The lawful points of discharge for the site is the Ruby Street and Opal Lane Road Reserves.




                                              Ingeniir Pty Ltd | 215101-SMP-01
                ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                         Page 4 | 14

Page 5

                                                                                                             ingeniir

3.        DESIGN OBJECTIVES
The objective of this report is to demonstrate that the project can comply with the Noosa Shire Council’s
codes and policies in relation to stormwater management through the implementation of the following
objectives;

      •   Maintain stormwater quality in accordance with local and state policies
      •   Manage and Mitigate quantities of peak stormwater discharge
      •   Adopt Water Sensitive Urban Design (WSUD) principles throughout
      •   Stormwater Harvesting and re-use for landscaping and alternative uses
      •   Provide immunity and resilience from flooding

This report outlines the design requirements to achieve the above objectives in a site-specific context.


4.        STORMWATER STRATEGY
The site is situated between Opal Lane on the North and Ruby Street on the South. There is stormwater
infrastructure in Ruby Street across the frontage of the site with a field inlet approximately central to the
frontage; and it is proposed to discharge the Southern portion of the development into this field inlet.

Field inlet pits are proposed to the western boundary to assist in the redirection of flows between the
buildings. Currently the entire site (with the exception of the existing dwelling’s roof water) drain to the
Western boundary; the development proposes to redirect these flows to the road reserves on both frontages
of the site which will significantly improve and provide a benefit to the neighbours on the western side.

It is achievable to maintain acceptable flows to both Ruby Street and Opal Lane through the implementation
of on-site detention.

Above ground tanks will be utilised for the Northern portion of the site (Opal Lane Units) for detention and
retention purposes to maintain a small footprint and maximise deep planted landscaping available for the
development and provide gravity irrigation to landscaping on the site.

The Southern Portion of the site (Ruby Street Units) will utilise an underground rainwater tank for
stormwater mitigation located under the driveway that is proposed to discharge into the field inlet in front of
the site.


5.        STORMWATER QUALITY
5.1       Construction Phase

The State Planning Policy (DILGP, 2017) Appendix 2 – Stormwater management design objectives
Table A: Construction phase – stormwater management design objectives outlines construction phase
requirements for stormwater quality.

The following manuals (as a minimum) should be read and implemented by any contractor proceeding with
the development construction;

      •   State Planning Policy Appendix 2 Table A – available here

                                                Ingeniir Pty Ltd | 215101-SMP-01
                  ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                           Page 5 | 14

Page 6

                                                                                                               ingeniir

      •     IECA Principles of Construction Site ESC – available here
      •     Water by Design ESC Factsheet Suite – available here

Detailed Erosion and Sediment Control design and plans should be documented by a suitably experienced
professional in conjunction with any application, or prior to commencing with the Operational Works
associated with the proposed development on site.


5.2         Operational Phase

The site has an allotment area of 1012m2 and as such does not trigger local or state requirements for
operational treatment objectives for stormwater quality.

The above ground rainwater retention tanks will provide opportunity for nutrient retention on-site and it is
proposed that the tanks will be used for landscape irrigation and other external uses. In context of the scale
of the development the re-use of rainwater on site is considered an acceptable outcome.


6.        STORMWATER QUANTITY
The development is proposed to incorporate stormwater detention to mitigate the increase in peak discharge
from the site.

The Bureau of Meteorology 2016 IFD service has been used for all analysis in this report.

A Rational Method estimation of the stormwater discharge has been used to estimate the pre-developed
runoff performance of the site. The detention analysis has been proportioned to match or improve on the
pre-developed flows as determined by the Rational Method. A summary of the Rational Method discharge
estimations are presented in Table 1.


 DISCHARGE ESTIMATES ( m 3 / s)
                                    Pre-Developed Flow Rates                                         Developed Flow Rates
      AEP          Rational Method                    WBNM                         Difference           Rational Method
 63.20%                  0.02                         0.021                        0.001 (105%)                0.022
 39.35%                  0.027                        0.029                        0.002 (107%)                0.029
 18.14%                  0.038                        0.039                        0.001 (103%)                0.04
     10%                 0.046                        0.049                        0.003 (107%)                0.048
      5%                 0.054                         0.06                        0.006 (111%)                0.058
      2%                 0.07                         0.067                        -0.003 (96%)                0.074
      1%                 0.08                         0.074                        -0.006 (93%)                0.085
                                      Table 1: Rational Method discharge estimation for the site

A WBNM 2017 (v001) hydrology model has been used to determine the detention volume required to
maintain or improve on the current flow characteristics of the site. Temporal patterns from ARR2016 have
been used in the analysis, along with reference parameters from the ARR Data Hub.




                                                  Ingeniir Pty Ltd | 215101-SMP-01
                    ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                             Page 6 | 14

Page 7

                                                                                                                ingeniir

The WBNM pre-developed model was calibrated to achieve an acceptable alignment with the existing site
Rational Method estimates for whole of site discharge.

As the development site is only 1012m2 there is not a practical way to produce better alignment than that
achieved in this analysis as;
    • Increasing initial losses further would result in the 1% AEP storm estimates becoming unconservative,
    • Adjusting the Lag Parameter primarily affects the timing of the peak, so only serves to reduce
        discharge rates by extending the critical duration, and has limited effect on smaller catchments.

On larger catchments Lag Parameter adjustments can bring the frequent events into good agreement with
the Rational Method.

As the appreciable magnitude of the difference in discharge between the Rational Method and WBNM
estimates peak at 6L/s it is considered that the calibration undertaken is acceptable. The calibration between
the WBNM and Rational Method existing flow estimations are presented in Table 1.

The adopted parameters for the WBNM analysis are presented in Table 2.


 WBNM ANALYSIS PARAMETERS
      Parameter                     Value                                       Source / Justification
                                                     ARRDH Suggested 36mm Initial Loss, However this was deemed
      Initial Loss                  15mm             excessive, and the loss rate was calibrated to get a close alignment
                                                     with the rational method
   Imp. Initial Loss                 1mm             Adopted as per industry practice
   Continuing Loss                2.6mm/hr           ARRDH, this has been adopted as it is deemed acceptable
                                                     This has been decreased from the recommended value of 1.7 in the
                                                     WBNM documentation as part of the calibration, and deemed to give
   Lag Parameter                      1.6
                                                     a great fit if the shorter duration events are compared to the rational
                                                     method.
                                                 Table 2: WBNM analysis parameters

6.1     Detention Analysis

The WBNM parameters in Table 2 have been used with the proposed development areas to obtain an
estimation of how the site will perform with peak flow mitigation measures implemented.

For this analysis it has been adopted that 100% of the roof areas is to be connected to the detention and
retention tanks, with the eaves gutters and connecting pipework sized for a 1% AEP storm event.


6.2     Detention Sizing and Details

The required detention volume that was determined to maintain or improve the pre-development discharge
rates for the site was 6,000L. This is proposed to be comprised of two 3000L slimline tanks (half-half split for
detention/retention – 1,500L detention/retention per tank) connected to the Units discharging to Opal Lane,
and one 3,000L tank for the Units discharging to Ruby Street with properties as listed in Table 3 and Table 4
respectively.




                                                   Ingeniir Pty Ltd | 215101-SMP-01
                     ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                              Page 7 | 14

Page 8

                                                                                                              ingeniir


                                OPAL LANE UNITS DETENTION TANK PROPERTIES
                             Roof/Impervious Area Connected                         100%
                             Eaves Gutter Size                                     1% AEP
                             Number of Tanks                                           2
                             Total Detention Capacity                              3,000L
                             Total Retention/Re-use Capacity                       3,000L
                             Height                                               2020mm
                             Length                                               2600mm
                             Width                                                820mm
                                                                            QTank's 3,000 Litre
                             Example Product
                                                                         Slimline Poly Water Tank
                                        Table 3: Opal Lane Units Detention tank properties



                               RUBY STREET UNITS DETENTION TANK PROPERTIES
                             Roof/Impervious Area Connected                         100%
                             Eaves Gutter Size                                     1% AEP
                             Number of Tanks                                           1
                             Total Detention Capacity                              3,000L
                             Height                                                900mm
                             Length                                               2500mm
                             Width                                               250mm
                                                                          Duraplas 3000L Lattice
                             Example Product
                                                                           Underground Tank
                                       Table 4: Ruby Street Units Detention tank properties

The outlet configuration of the tanks is proposed to be constructed of an external standpipe, with outlet
orifices drilled into the exterior of the tank with puddle flanges to connect to the standpipe. The outlet
details are presented in Table 5 and Table 6.

                             OPAL LANE UNITS DETENTION TANK OUTLET DETAILS
                          Feature                              Size                        Height from base
                  Top of Tank Overflow               As per manufacturer                         2020mm
                  Top Outlet                            90mm diameter                       1900mm
                                                                                            1010mm
                  Low Flow                              35mm diameter                 (retention below this
                                                                                             height)
                                      Table 5: Opal Lane Units Detention tank outlet details



                             RUBY STREET UNITS DETENTION TANK OUTLET DETAILS
                          Feature                              Size                        Height from base
                  Top of Tank Overflow               As per manufacturer                         1000mm
                  Top Outlet                            90mm diameter                            800mm
                  Low Flow                              30mm diameter                             0mm
                                      Table 6: Ruby Street Units Detention tank outlet details



                                              Ingeniir Pty Ltd | 215101-SMP-01
                ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                         Page 8 | 14

Page 9

                                                                                                                  ingeniir


6.3     Detention Results

The Opal Lane Units detention tanks are proposed to discharge to Opal Lane via two 100mm diameter kerb
adapters; with total peak discharge rates to Opal Lane estimated at 37L/s for a 1% AEP 10 min critical storm
which is an increase on the current discharge to Opal Lane of 21L/s, with the increase attributed to the
redirection of surface flows currently discharging across the western boundary.

As there is no piped infrastructure within Opal Lane it is impractical to detain the surface flows, and the
redirection of flows into a Council controlled discharge point is considered an improvement on the current
drainage scenario and is considered a preferable outcome. All flows (pre-developed and developed) enter the
same existing stormwater infrastructure to the west of the site, as the total site discharge is maintained there
can be no worsening to the performance of the existing infrastructure.

The Ruby Street Units detention tank is proposed to discharge to the field inlet in Ruby Street via a 150mm
diameter pipe; with total peak discharge rates to Ruby Street estimated at 37L/s for a 1% AEP 10 min critical
storm which is an improvement on the current discharge to Ruby Street of 59L/s.

                                 WBNM WHOLE OF SITE DETENTION SUMMARY
                                  Pre-Development     Post-Development
                    AEP                          Duration                         Duration          Performance
                                 Q (m3/s)                         Q (m3/s)
                                                  (min)                            (min)
                   63.20%            0.021                15          0.013                15             62%
                   39.35%            0.029                15          0.027                15             93%
                   18.14%            0.039                15          0.039                15            100%
                    10%              0.049                10          0.046                15             94%
                     5%               0.06                10          0.052                15             87%
                     2%              0.067                10          0.064                10             96%
                     1%              0.074                10          0.074                10            100%
                             Table 7: Comparison of pre and post development site discharge rates

As demonstrated in Table 7, the proposed detention system successfully mitigates stormwater discharge for
the proposed development to pre-development discharge rates.

The proposed development improves on existing stormwater discharge arrangement by redirecting surface
flows currently discharging across the western boundary into Council controlled infrastructure.

As the proposed development maintains current peak discharge rates, it is not considered to affect the
existing capacity of the downstream infrastructure.


7.    FLOODING
The site is in an elevated position locally and regionally and is not known to have any flood risk. A review of
the Noosa Shire Council’s Intramaps Interactive Mapping (accessed 23/04/2022) indicates that the site is not
affected by any known flood studies. Refer Plate 2 for an excerpt of the mapping system.




                                              Ingeniir Pty Ltd | 215101-SMP-01
                ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                         Page 9 | 14

Page 10

                                                                                                                           ingeniir




                  Plate 2: Noosa Shire Council Flood Inundation Extents in the vicinity of the site (highlighted in red)



8.    CONCLUSION
The proposed development has been analysed to provide design requirements to meet local and state
authority guidelines for stormwater quality and quantity outcomes.

The development proposes to use on site water retention for landscape irrigation to satisfy alternative water
quality requirements.

The proposed detention system successfully mitigates stormwater discharge for the proposed development
to pre-development discharge rates; whilst improving existing stormwater discharge arrangement by
redirecting surface flows currently discharging across the western boundary into Council controlled
infrastructure.

As the proposed development maintains current peak discharge rates, it is not considered to affect the
existing capacity of the downstream infrastructure by improving or maintaining whole of site stormwater
discharge rates for all events up to and including the 1% AEP.

If you wish to discuss this report and analysis further, please contact Daniel Kenna.




Daniel Kenna
Beng CPEng MIEAust RPEQ 15522 NER 3133685 EC 66121
for and on behalf of Ingeniir Pty Ltd

                                               Ingeniir Pty Ltd | 215101-SMP-01
                 ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                          Page 10 | 14

Page 11

                                                                                                            ingeniir

9.    LIMITATIONS
This report has been written based on Ingeniir’s understanding of the required scope at the time of writing;
and is written for the purposes of Robyn Kildey and not to be used for any other purpose.

To the extent permitted by law, Ingeniir expressly disclaims and excludes liability for any loss, damage, cost or
expenses suffered by any third party relating to or resulting from the use of, or reliance on, any information
contained in this report. Ingeniir does not admit that any action, liability or claim exist or be available to any
third-party, and disclaims any liability resulting from the inaccuracy of third-party information supplied to
Ingeniir for use in this report.




                                               Ingeniir Pty Ltd | 215101-SMP-01
                 ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                          Page 11 | 14

Page 12

                                                                                                   ingeniir


Appendix 1 | BoM IFD Data




                                      Ingeniir Pty Ltd | 215101-SMP-01
        ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                 Page 12 | 14

Page 13

Copyright Commonwealth of Australia 2016 Bureau of Meteorology (ABN 92 637 533 532)

All Design Rainfall Depth (mm)
Issued:     22-Apr-22
Location Label:
Requested coordinate:
            Latitude     -26.4193 Longitude 152.914
Nearest gridLatitude
             cell:     26.4125 (S)Longitude 152.9125 (E)

                     Exceedances
                               Annual
                                 per Year
                                       Exceedance
                                          (EY)     Probability (AEP)
Duration Duration in 12EY
                     min       6EY        4EY        3EY         2EY           63.20%    50% 0.5EY        20% 0.2EY        10%      5%     2%     1% 1 in 200 1 in 500 1 in 1000 1 in 2000
1 min            1        1.22        1.4        1.7       1.91        2.21       2.74     3.1     3.44   4.17      4.26   4.88   5.56   6.42   7.07        7.91     9.17     10.2      11.2
2 min            2        2.15       2.44      2.93        3.29          3.8      4.69   5.29      5.87     7.2     7.34   8.52   9.83   11.6     13        14.7     17.3     19.4      21.6
3 min            3        2.98        3.4      4.12        4.63        5.36       6.61   7.46      8.28   10.1      10.3     12   13.8   16.2     18        20.3     23.8     26.6      29.6
4 min            4        3.72       4.26      5.19        5.85        6.78       8.38   9.46      10.5   12.8      13.1   15.1   17.3   20.2   22.4        25.2     29.4     32.7      36.3
5 min            5        4.37       5.03      6.15        6.95        8.08       9.99   11.3      12.5   15.2      15.6   17.9   20.4   23.8   26.3        29.5     34.3     38.1      42.1
10 min          10         6.8       7.91      9.82        11.2           13      16.2   18.3      20.3   24.6      25.1   28.7   32.6   37.5   41.2        45.9     53.1     58.8      64.7
15 min          15        8.46       9.88      12.3        14.1        16.5       20.6   23.2      25.8   31.2      31.8   36.4   41.2   47.4     52          58     67.1     74.3      81.8
20 min          20        9.72       11.4      14.2        16.2        19.1       23.9      27       30   36.3        37   42.3   48.1   55.4   60.8        67.9     78.6     87.1        96
25 min          25        10.7       12.6      15.7           18       21.2       26.7   30.1      33.4   40.5      41.3   47.3   53.8   62.1   68.3        76.3     88.5     98.2       108
30 min          30        11.6       13.6         17       19.5           23        29   32.7      36.3   44.1      44.9   51.5   58.7     68   74.9        83.8     97.3      108       119
45 min          45        13.6       15.9         20       22.9        27.1       34.5   38.9      43.2   52.7      53.8   61.9   70.9   82.6   91.5         103      119      133       147
1 hour          60        15.1       17.6      22.2        25.5        30.3       38.7   43.8      48.6   59.5      60.7   70.2   80.7   94.5    105         118      137      153       169
1.5 hour        90        17.3       20.3      25.6        29.5        35.1       45.4   51.4      57.1   70.5      71.9   83.7   96.7    114    128         143      167      186       205
2 hour         120        19.1       22.3      28.2        32.6           39      50.7   57.6      63.9   79.6      81.2   94.8    110    131    147         164      191      212       235
3 hour         180        21.8       25.6      32.4        37.6        45.2       59.3   67.7      75.1   94.6      96.5    113    132    158    178         199      231      256       283
4.5 hour       270          25       29.4      37.4        43.4        52.5       69.5   79.8      88.6    113       115    136    160    192    217         242      280      310       341
6 hour         360        27.6       32.5      41.4        48.2        58.4       77.9   89.9      99.7    128       131    156    183    221    251         278      321      355       390
9 hour         540        31.7       37.4      47.9        55.9        68.1       91.5    106       118    154       157    188    222    269    306         339      391      431       473
12 hour        720          35       41.3      53.1        62.1        75.8        102    119       133    175       178    214    254    309    353         391      450      497       545
18 hour       1080        40.1       47.4      61.1        71.7        87.8        119    140       155    208       212    256    306    374    428         476      550      609       669
24 hour       1440          44       52.1      67.2        78.9        96.9        132    156       173    233       237    289    346    425    489         547      634      703       776
30 hour       1800        47.1       55.8      72.1        84.8         104        142    168       186    253       258    315    379    468    539         614      721      807       898
36 hour       2160        49.7       58.9      76.2        89.6         110        151    178       198    269       275    337    407    503    582         670      791      891       998
48 hour       2880        53.7       63.7      82.5        97.1         120        164    194       215    295       301    370    450    560    651         755      900    1020      1150
72 hour       4320        58.9       70.1      91.2         108         133        182    216       239    329       336    416    508    638    746         866    1040     1180      1340
96 hour       5760          62       74.2         97        115         142        195    230       256    352       359    445    546    688    807         935    1120     1280      1450
120 hour      7200          64         77       101         120         149        206    242       269    369       376    467    573    723    848         981    1180     1340      1530
144 hour      8640        65.2         79       105         125         155        215    252       280    383       391    484    594    747    875       1010     1220     1390      1570
168 hour    10080           66       80.7       108         129         161        223    262       290    395       403    498    610    765    894       1040     1240     1420      1610


[OCR of page images]
Copyright Commonwealth of Australia 2016 Bureau of Meteorology (ABN 92 637 533 532)

All Design Rainfall Depth (mm)

Issued: 22-Apr-22

Location Label:

Requested Latitude -26.4193 Longitude 152.914
Nearest gr Latitude 26.4125 (S Longitude 152.9125 (E)

Exceedanc Annual Exceedance Probability (AEP)

Duration Duration ir 12EY 6EY 4EY 3EY 2EY 63.20%
1 min 1 1.22 14 17 1.91 2.21 2.74
2 min 2 2.15 2.44 2.93 3.29 3.8 4.69
3 min 3 2.98 3.4 4.12 4.63 5.36 6.61
4min 4 3.72 4.26 5.19 5.85 6.78 8.38
5 min 5 4.37 5.03 6.15 6.95 8.08 9.99
10 min 10 6.8 7.91 9.82 11.2 13 16.2
15 min 15 8.46 9.88 12.3 14.1 16.5 20.6
20 min 20 9.72 11.4 14.2 16.2 19.1 23.9
25 min 25 10.7 12.6 15.7 18 21.2 26.7
30 min 30 11.6 13.6 17 19.5 23 29
45 min 45 13.6 15.9 20 22.9 27.1 34.5
1 hour 60 15.1 17.6 22.2 25.5 30.3 38.7
1.5 hour 90 17.3 20.3 25.6 29.5 35.1 45.4
2 hour 120 19.1 22.3 28.2 32.6 39 50.7
3 hour 180 218 25.6 32.4 37.6 45.2 59.3
4.5 hour 270 25 29.4 37.4 43.4 52.5 69.5
6 hour 360 27.6 32.5 41.4 48.2 58.4 77.9
9 hour 540 31.7 37.4 47.9 55.9 68.1 91.5
12 hour 720 35 41.3 53.1 62.1 75.8 102
18 hour 1080 40.1 47.4 61.1 717 87.8 119
24 hour 1440 44 52.1 67.2 78.9 96.9 132
30 hour 1800 471 55.8 72.1 84.8 104 142
36 hour 2160 49.7 58.9 76.2 89.6 110 151
48 hour 2880 53.7 63.7 82.5 97.1 120 164
72 hour 4320 58.9 70.1 91.2 108 133 182
96 hour 5760 62 74.2 97 115 142 195
120 hour 7200 64 77 101 120 149 206
144 hour 8640 65.2 79 105 125 155 215
168 hour 10080 66 80.7 108 129 161 223

50% O.5EY
3.1
5.29
7.46
9.46
11.3
18.3
23.2
27
30.1
32.7
38.9
43.8
51.4
57.6
67.7
79.8
89.9
106
119
140
156
168
178
194
216
230
242
252
262

3.44
5.87
8.28
10.5
12.5
20.3
25.8
30
33.4
36.3
43.2
48.6
57.1
63.9
75.1
88.6
99.7
118
133
155
173
186
198
215
239
256
269
280
290

20% 0.2EY
417
7.2
10.1
12.8
15.2
24.6
31.2
36.3
40.5
44.1
52.7
59.5
70.5
79.6
94.6
113
128
154
175
208
233
253
269
295
329
352
369
383
395

4.26
7.34
10.3
13.1
15.6
25.1
31.8
37
41.3
44.9
53.8
60.7
71.9
81.2
96.5
115
131
157
178
212
237
258
275
301
336
359
376
391
403

10%
4.88
8.52
12
15.1
17.9
28.7
36.4
42.3
47.3
$1.5
61.9
70.2
83.7
94.8
113
136
156
188
214
256
289
315
337
370
416
445
467
484
498

5%
5.56
9.83
13.8
17.3
20.4
32.6
41.2
48.1
53.8
58.7
70.9
80.7
96.7

110
132
160
183
222
254
306
346
379
407
450
508
546
573
594
610

2%
6.42
11.6
16.2
20.2
23.8
37.5
474
55.4
62.1

68
82.6
94.5

114
131
158
192
221
269
309
374
425
468
503
560
638
688
723
747
765

1% 1in 200
7.07 7.91
13 14.7
18 20.3
22.4 25.2
26.3 29.5
41.2 45.9
52 58
60.8 67.9
68.3 76.3
74.9 83.8
91.5 103
105 118
128 143
147 164
178 199
217 242
251 278
306 339
353 391
428 476
489 547
539 614
582 670
651 755
746 866
807 935
848 981
875 1010
894 1040

1in 500
9.17
17.3
23.8
29.4
34.3
53.1
67.1
78.6
88.5
97.3

119
137
167
191
231
280
321
391
450
550
634
721
791
900
1040
1120
1180
1220
1240

1in 1000 1in2000

10.2
19.4
26.6
32.7
38.1
58.8
74.3
87.1
98.2
108
133
153
186
212
256
310
355
431
497
609
703
807

1020
1180
1280
1340
1390
1420

11.2
21.6
29.6
36.3
42.1
64.7
81.8
96
108
119
147
169
205
235
283
341
390
473
545
669
776
898
998
1150
1340
1450
1530
1570
1610

Page 14

                                                                                                   ingeniir


Appendix 2 | Rational Method and WBNM Calculations &
Summaries




                                      Ingeniir Pty Ltd | 215101-SMP-01
        ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                 Page 13 | 14

Page 15

Rational Method Calculations

    Project        215101

   Address         7 Ruby Street                                                               By           DK


            Pre - Development                                                                       Post - Development
               Catchment Details                                                                        Catchment Details
     Area             0.1012           ha                                                     Area             0.1012          ha
       fi              0.27                                                                     fi              0.49
     C10           0.75355731                                                                 C10            0.7986166
      I10              70.2          mm/hr                                                     I10              70.2         mm/hr

              Standard Inlet Time                                                                     Standard Inlet Time
     Time               5             mins                                                    Time                4           mins

    Overland Sheet Flow (Friend's Eqn)                                                       Overland Sheet Flow (Friend's Eqn)
    Length                         m                                                         Length                         m
     Slope                         %                                                          Slope                         %

  Surface 'n'                                                                              Surface 'n'

     Time               0             mins                                                    Time                0           mins

           Pipe Flow Travel Time                                                                    Pipe Flow Travel Time
Flow Distance                          m                                                 Flow Distance                         m
Fall of Channel                        m                                                 Fall of Channel                       m
      Time                            mins                                                     Time                           mins

                   Kerb Flow                                                                                Kerb Flow
    Length                             m                                                     Length                            m
     Slope                             %                                                      Slope                            %
     Time              0.0            mins                                                    Time                0.0         mins

    Channel Flow (Figure 4.8 QUDM, or                                                        Channel Flow (Figure 4.8 QUDM, or
          Manning's Equation)                                                                      Manning's Equation)
Flow Distance                          m                                                 Flow Distance                         m
Fall of Channel                        m                                                 Fall of Channel                       m
      Time                            mins                                                     Time                           mins


 Adopted Time of                                                                          Adopted Time of
  Concentration
                        5             mins                                                 Concentration
                                                                                                                  5           mins



      Pre-Development Peak Discharges                                                         Post-Development Peak Discharges
                                                            Design Storm   Frequency
   Area (ha)            Cy          Iy (mm/h)   Qy (m3/s)      (AEP)       Factor (Fy)
                                                                                            Area (ha)             Cy        Iy (mm/h)   Qy (m3/s)

    0.1012         0.60284585         120        0.02        63.20%          0.80            0.1012         0.63889328        120        0.022
    0.1012         0.64052372         150        0.027       39.35%          0.85            0.1012         0.67882411        150        0.029
    0.1012         0.71587945         187        0.038       18.14%          0.95            0.1012         0.75868577        187        0.04
    0.1012         0.75355731         215        0.046        10%            1.00            0.1012          0.7986166        215        0.048
    0.1012         0.79123518         245        0.054         5%            1.05            0.1012         0.83854743        245        0.058
    0.1012         0.86659091         286        0.07          2%            1.15            0.1012         0.91840909        286        0.074
    0.1012         0.90426877         316        0.08          1%            1.20            0.1012         0.95833992        316        0.085

                                                            Discharge Comparison
                      AEP           63.20%       39.35%     18.14%            10%              5%                 2%          1%
                   Difference        0.002        0.002      0.002            0.002           0.004              0.004       0.005
                   Percentage       10.0%         7.4%       5.3%             4.3%            7.4%               5.7%        6.3%

Page 16

         WBNM WHOLE OF SITE DETENTION SUMMARY
          Pre-Development      Post-Development
 AEP                                                                  Performance
         Q (m 3/s)    Duration (min)    Q (m 3/s)    Duration (min)
63.20%        0.021              15          0.013              15           62%
39.35%        0.029              15          0.027              15           93%
18.14%        0.039              15          0.039              15          100%
 10%          0.049              10          0.046              15           94%
 5%            0.06              10          0.052              15           87%
 2%           0.067              10          0.064              10           96%
 1%           0.074              10          0.074              10          100%

           RATIONAL METHOD - WBNM CALIBRATION
         Pre-Development RM            Pre-Development WBNM
 AEP          3
                                                                      Difference
         Q (m /s)     Duration (min)    Q (m 3/s)    Duration (min)
63.20%         0.02                5         0.021              15          105%
39.35%        0.027                5         0.029              15          107%
18.14%        0.038                5         0.039              15          103%
 10%          0.046                5         0.049              10          107%
 5%           0.054                5          0.06              10          111%
 2%            0.07                5         0.067              10           96%
 1%            0.08                5         0.074              10           93%

           RATIONAL METHOD - WBNM COMPARSION
         Pre-Development RM            Post-Development WBNM
 AEP          3
                                                                      Difference
         Q (m /s)     Duration (min)    Q (m 3/s)    Duration (min)
63.20%         0.02                5         0.013              15           65%
39.35%        0.027                5         0.027              15          100%
18.14%        0.038                5         0.039              15          103%
 10%          0.046                5         0.046              15          100%
 5%           0.054                5         0.052              15           96%
 2%            0.07                5         0.064              10           91%
 1%            0.08                5         0.074              10           93%


[OCR of page images]
WBNM WHOLE OF SITE DETENTION SUMMARY

ie Pre-Development Post-Development
Q (m?/s) Duration (min) Q (m?/s) Duration (min)
63.20% 0.021 15 0.013 15
39.35% 0.029 15 0.027 15
18.14% 0.039 15 0.039 15
10% 0.049 10 0.046 15
5% 0.06 10 0.052 15
2% 0.067 10 0.064 10
1% 0.074 10 0.074 10
RATIONAL METHOD - WBNM CALIBRATION

er Pre-Development RM Pre-Development WBNM
Q (m?/s) Duration (min) Q (m?/s) Duration (min)
63.20% 0.02 5 0.021 15
39.35% 0.027 5 0.029 15
18.14% 0.038 5 0.039 15
10% 0.046 5 0.049 10
5% 0.054 5 0.06 10
2% 0.07 5 0.067 10
1% 0.08 5 0.074 10

RATIONAL METHOD - WBNM COMPARSION

ie Pre-Development RM Post-Development WBNM
Q (m?/s) Duration (min) Q (m?/s) Duration (min)
63.20% 0.02 5 0.013 15
39.35% 0.027 5 0.027 15
18.14% 0.038 5 0.039 15
10% 0.046 5 0.046 15
5% 0.054 5 0.052 15
2% 0.07 5 0.064 10
1% 0.08 5 0.074 10

Performance

62%
93%
100%
94%
87%
96%
100%

Difference

105%
107%
103%
107%
111%

96%

93%

Difference

65%
100%
103%
100%

96%

91%

93%

Page 17

                      C            1.6 IL                15 CLR              2.6
                      WBN Model     215101_220423024323_WBNM
                      1% AEP
           Duration            1    2          3          4          5       10        15    20   25   30   45
           Flow                0    0       0.041      0.055      0.051    0.062     0.09     0    0    0    0
                                                                           0.074    0.081     0    0    0    0
                                                                           0.062    0.057     0    0    0    0
                                                                            0.08    0.054     0    0    0    0
EXISTING




                                                                           0.078     0.07     0    0    0    0
                                                                           0.079    0.066     0    0    0    0
                                                                           0.075    0.058     0    0    0    0
                                                                           0.068    0.095     0    0    0    0
                                                                           0.096    0.074     0    0    0    0
                                                                           0.059    0.059     0    0    0    0
           AVERAGE             0    0      0.041      0.055       0.051   0.0733   0.0704     0    0    0    0
           CLOSEST             0    0      0.041      0.055       0.051    0.074      0.07    0    0    0    0
           MAX                                                             0.074

                      WBN Model     215101_220423024323_WBNM
                      1% AEP
           Duration            1    2          3          4          5       10        15    20   25   30   45
           Flow                0    0       0.021       0.03      0.027    0.071    0.074     0    0    0    0
                                                                           0.074    0.063     0    0    0    0
                                                                           0.071    0.067     0    0    0    0
                                                                           0.076    0.062     0    0    0    0
ULTIMATE




                                                                           0.075    0.069     0    0    0    0
                                                                           0.076     0.06     0    0    0    0
                                                                           0.075    0.061     0    0    0    0
                                                                           0.072    0.091     0    0    0    0
                                                                           0.079    0.063     0    0    0    0
                                                                            0.07    0.062     0    0    0    0
           AVERAGE             0    0      0.021       0.03       0.027   0.0739   0.0672     0    0    0    0
           CLOSEST             0    0      0.021       0.03       0.027    0.074    0.067     0    0    0    0
           MAX                                                             0.074


[OCR of page images]
EXISTING

ULTIMATE

Cc

WBN Model

1% AEP
Duration 1
Flow
AVERAGE 0
CLOSEST 0
MAX

WBN Model

1% AEP
Duration 1
Flow
AVERAGE 0
CLOSEST 0

MAX

1.6 IL 15 CLR
215101_220423024323_WBNM

2 3 4 5)
0 0.041 0.055 0.051
0 0.041 0.055 0.051
0 0.041 0.055 0.051

215101_220423024323_WBNM

2 3 4 5)
0 0.021 0.03 0.027
0 0.021 0.03 0.027
0 0.021 0.03 0.027

2.6

10
0.062
0.074
0.062

0.08
0.078
0.079
0.075
0.068
0.096
0.059

0.0733
0.074
0.074

10
0.071
0.074
0.071
0.076
0.075
0.076
0.075
0.072
0.079

0.07
0.0739
0.074
0.074

15
0.09
0.081
0.057
0.054
0.07
0.066
0.058
0.095
0.074
0.059
0.0704
0.07

15
0.074
0.063
0.067
0.062
0.069

0.06
0.061
0.091
0.063
0.062

0.0672
0.067

N
oO

SCO0o OOO OO Aaa ao

N
oO

CO 0C0O0O0O OO Oa Aaa oO

N
u

SCO0o OOO OO Aaa ao

N
u

CO 0C0O0O0O OO Oa Aaa oO

w
oO

[90000 0000000

w
oO

99000 0000 CA 0 0

aS
un

S900 00 000 0000

aS
un

[99000 0000 CA 0 0

Page 18

                      2% AEP
           Duration            1   2      3       4       5       10        15    20   25   30   45
           Flow                0   0    0.03   0.046   0.041    0.056    0.079     0    0    0    0
                                                                0.067     0.07     0    0    0    0
                                                                0.057    0.052     0    0    0    0
                                                                0.073    0.049     0    0    0    0
EXISTING




                                                                0.071    0.064     0    0    0    0
                                                                0.072     0.06     0    0    0    0
                                                                0.069    0.053     0    0    0    0
                                                                0.062    0.086     0    0    0    0
                                                                0.084    0.067     0    0    0    0
                                                                0.053    0.053     0    0    0    0
           AVERAGE             0   0    0.03   0.046   0.041   0.0664   0.0633     0    0    0    0
           CLOSEST             0   0    0.03   0.046   0.041    0.067    0.064     0    0    0    0
           MAX                                                  0.067



                      2% AEP
           Duration            1   2      3       4       5       10        15    20   25   30   45
           Flow                0   0   0.015   0.025   0.021    0.061    0.062     0    0    0    0
                                                                0.064    0.059     0    0    0    0
                                                                0.061    0.058     0    0    0    0
                                                                0.066    0.054     0    0    0    0
ULTIMATE




                                                                0.065    0.065     0    0    0    0
                                                                0.066    0.057     0    0    0    0
                                                                0.065    0.053     0    0    0    0
                                                                0.063    0.085     0    0    0    0
                                                                0.067     0.06     0    0    0    0
                                                                 0.06    0.054     0    0    0    0
           AVERAGE             0   0   0.015   0.025   0.021   0.0638   0.0607     0    0    0    0
           CLOSEST             0   0   0.015   0.025   0.021    0.064      0.06    0    0    0    0
           MAX                                                  0.064


[OCR of page images]
EXISTING

ULTIMATE

2% AEP

Duration 1 2 3
Flow 0 0 0.03
AVERAGE 0 0 0.03
CLOSEST 0 0 0.03
MAX
2% AEP

Duration 1 2 3
Flow 0 0.015
AVERAGE 0 0 0.015
CLOSEST 0 0 0.015

MAX

0.046 0.041 0.056
0.067
0.057
0.073
0.071
0.072
0.069
0.062
0.084
0.053
0.046 0.041 0.0664
0.046 0.041 0.067
0.067

4 5 10
0.025 0.021 0.061
0.064

0.061

0.066

0.065

0.066

0.065

0.063

0.067

0.06

0.025 0.021 0.0638
0.025 0.021 0.064
0.064

15
0.079
0.07
0.052
0.049
0.064
0.06
0.053
0.086
0.067
0.053
0.0633
0.064

15
0.062
0.059
0.058
0.054
0.065
0.057
0.053
0.085

0.06
0.054
0.0607
0.06

N
oO

[90000 0000000

N
oO

CO 0C0O0O0O OO Oa Aaa oO

N
u

[90000 0000000

N
u

CO 0C0O0O0O OO Oa Aaa oO

w
oO

[90000 0000000

w
oO

99000 0000 CA 0 0

aS
un

[900000000000

aS
un

[990000000 0G 0 0

Page 19

                      5% AEP
           Duration            1   2      3       4       5        10       15    20   25   30   45
           Flow                0   0   0.021   0.033   0.027    0.055     0.043    0    0    0    0
                                                                0.057     0.047    0    0    0    0
                                                                0.051     0.051    0    0    0    0
                                                                0.046     0.051    0    0    0    0
EXISTING




                                                                0.064     0.052    0    0    0    0
                                                                 0.06     0.047    0    0    0    0
                                                                0.066     0.057    0    0    0    0
                                                                0.064     0.054    0    0    0    0
                                                                0.057     0.072    0    0    0    0
                                                                0.068     0.068    0    0    0    0
           AVERAGE             0   0   0.021   0.033   0.027   0.0588    0.0542    0    0    0    0
           CLOSEST             0   0   0.021   0.033   0.027      0.06    0.054    0    0    0    0
           MAX                                                    0.06



                      5% AEP
           Duration            1   2      3       4       5        10       15    20   25   30   45
           Flow                0   0    0.01   0.018   0.014    0.051     0.044    0    0    0    0
                                                                0.051     0.047    0    0    0    0
                                                                0.049     0.041    0    0    0    0
                                                                0.048     0.056    0    0    0    0
ULTIMATE




                                                                0.052     0.052    0    0    0    0
                                                                0.052     0.044    0    0    0    0
                                                                0.051     0.048    0    0    0    0
                                                                0.053     0.049    0    0    0    0
                                                                0.051     0.071    0    0    0    0
                                                                 0.05      0.07    0    0    0    0
           AVERAGE             0   0    0.01   0.018   0.014   0.0508    0.0522    0    0    0    0
           CLOSEST             0   0    0.01   0.018   0.014    0.051     0.052    0    0    0    0
           MAX                                                            0.052


[OCR of page images]
EXISTING

ULTIMATE

5% AEP
Duration
Flow

AVERAGE
CLOSEST
MAX

5% AEP
Duration
Flow

AVERAGE
CLOSEST
MAX

oo

0.021 0.033 0.027 0.055
0.057

0.051

0.046

0.064

0.06

0.066

0.064

0.057

0.068

0.021 0.033 0.027 0.0588
0.021 0.033 0.027 0.06
0.06

3 4 5 10
0.01 0.018 0.014 0.051
0.051

0.049

0.048

0.052

0.052

0.051

0.053

0.051

0.05

0.01 0.018 0.014 0.0508
0.01 0.018 0.014 0.051

15
0.043
0.047
0.051
0.051
0.052
0.047
0.057
0.054
0.072
0.068

0.0542
0.054

15
0.044
0.047
0.041
0.056
0.052
0.044
0.048
0.049
0.071

0.07
0.0522
0.052
0.052

N
oO

SCO0o OOO OOO Oa ao

N
oO

99000 0000 CA 0 0

N
u

SCO0o OOO OOO Oa ao

N
u

99000 0000 CA 0 0

w
oO

[90000 0000000

w
oO

99000 0000 CA 0 0

aS
un

[900000000000

aS
un

[990000000 0G 0 0

Page 20

                      10% AEP
           Duration             1   2      3       4       5       10       15    20   25   30   45
           Flow                 0   0   0.018   0.024   0.018    0.049    0.038    0    0    0    0
                                                                  0.05    0.041    0    0    0    0
                                                                 0.045    0.045    0    0    0    0
                                                                  0.04    0.042    0    0    0    0
EXISTING




                                                                 0.052    0.046    0    0    0    0
                                                                  0.05    0.041    0    0    0    0
                                                                 0.053    0.047    0    0    0    0
                                                                 0.051    0.043    0    0    0    0
                                                                  0.05    0.064    0    0    0    0
                                                                 0.055     0.06    0    0    0    0
           AVERAGE              0   0   0.018   0.024   0.018   0.0495   0.0467    0    0    0    0
           CLOSEST              0   0   0.018   0.024   0.018    0.049    0.047    0    0    0    0
           MAX                                                   0.049



                      10% AEP
           Duration             1   2      3       4       5       10       15    20   25   30   45
           Flow                 0   0   0.009   0.012   0.008     0.04    0.035    0    0    0    0
                                                                  0.04    0.037    0    0    0    0
                                                                 0.039    0.039    0    0    0    0
                                                                 0.038    0.052    0    0    0    0
ULTIMATE




                                                                 0.039    0.049    0    0    0    0
                                                                  0.04    0.041    0    0    0    0
                                                                 0.038    0.036    0    0    0    0
                                                                 0.039    0.046    0    0    0    0
                                                                  0.04    0.059    0    0    0    0
                                                                 0.037    0.058    0    0    0    0
           AVERAGE              0   0   0.009   0.012   0.008    0.039   0.0452    0    0    0    0
           CLOSEST              0   0   0.009   0.012   0.008    0.039    0.046    0    0    0    0
           MAX                                                            0.046


[OCR of page images]
EXISTING

ULTIMATE

10% AEP

Duration 1 2 3
Flow 0 0 0.018
AVERAGE 0 0 0.018
CLOSEST 0 0 0.018
MAX
10% AEP

Duration 1 2 3
Flow 0 0.009
AVERAGE 0 0 0.009
CLOSEST 0 0 0.009

MAX

4 5)
0.024 0.018
0.024 0.018
0.024 0.018

4 5)
0.012 0.008
0.012 0.008
0.012 0.008

10
0.049
0.05
0.045
0.04
0.052
0.05
0.053
0.051
0.05
0.055
0.0495
0.049
0.049

10
0.04
0.04

0.039
0.038
0.039
0.04
0.038
0.039
0.04
0.037
0.039
0.039

15
0.038
0.041
0.045
0.042
0.046
0.041
0.047
0.043
0.064

0.06
0.0467
0.047

15
0.035
0.037
0.039
0.052
0.049
0.041
0.036
0.046
0.059
0.058

0.0452
0.046
0.046

N
oO

SCO0o OOO CGO Aaa ao

N
oO

CO 00 OOOO Oa Aaa oO

N
u

SCO0o OOO CGO Aaa ao

N
u

SC O0O0OO OOOO OO

w
oO

[90000 0000000

w
oO

COCO OOOO Oa Aaa oO

aS
un

[900000000000

aS
un

[990000000 0G 0 0

Page 21

                      18.14% AEP
           Duration          1     2      3       4       5       10       15    20   25   30   45
           Flow              0     0   0.016   0.015   0.015    0.038    0.036    0    0    0    0
                                                                0.037    0.031    0    0    0    0
                                                                0.037    0.033    0    0    0    0
                                                                0.042    0.034    0    0    0    0
EXISTING




                                                                0.039    0.033    0    0    0    0
                                                                 0.04    0.036    0    0    0    0
                                                                0.037    0.039    0    0    0    0
                                                                0.041    0.042    0    0    0    0
                                                                0.036    0.051    0    0    0    0
                                                                0.038    0.057    0    0    0    0
           AVERAGE           0     0   0.016   0.015   0.015   0.0385   0.0392    0    0    0    0
           CLOSEST           0     0   0.016   0.015   0.015    0.038    0.039    0    0    0    0
           MAX                                                           0.039



                      18.14% AEP
           Duration          1     2      3       4       5       10       15    20   25   30   45
           Flow              0     0   0.007   0.007   0.007    0.028    0.028    0    0    0    0
                                                                0.029    0.029    0    0    0    0
                                                                0.029    0.034    0    0    0    0
                                                                0.025    0.037    0    0    0    0
ULTIMATE




                                                                0.027    0.039    0    0    0    0
                                                                0.027    0.041    0    0    0    0
                                                                0.028    0.042    0    0    0    0
                                                                0.026    0.043    0    0    0    0
                                                                0.029    0.046    0    0    0    0
                                                                0.028    0.048    0    0    0    0
           AVERAGE           0     0   0.007   0.007   0.007   0.0276   0.0387    0    0    0    0
           CLOSEST           0     0   0.007   0.007   0.007    0.028    0.039    0    0    0    0
           MAX                                                           0.039


[OCR of page images]
EXISTING

ULTIMATE

18.14% AEP

Duration 1 2
Flow 0 0
AVERAGE 0 0
CLOSEST 0 0
MAX

18.14% AEP

Duration 1 2
Flow 0 0
AVERAGE 0 0
CLOSEST 0 0

MAX

0.016 0.015 0.015 0.038
0.037

0.037

0.042

0.039

0.04

0.037

0.041

0.036

0.038

0.016 0.015 0.015 0.0385
0.016 0.015 0.015 0.038

3 4 5 10
0.007 0.007 0.007 0.028
0.029

0.029

0.025

0.027

0.027

0.028

0.026

0.029

0.028

0.007 0.007 0.007 0.0276
0.007 0.007 0.007 0.028

15
0.036
0.031
0.033
0.034
0.033
0.036
0.039
0.042
0.051
0.057

0.0392
0.039
0.039

15
0.028
0.029
0.034
0.037
0.039
0.041
0.042
0.043
0.046
0.048

0.0387
0.039
0.039

N
oO

SCO0o OOO OOO Oa ao

N
oO

99000 0000 CA 0 0

N
u

SCO0o OOO OOO Oa ao

N
u

99000 0000 CA 0 0

w
oO

[90000 0000000

w
oO

99000 0000 CA 0 0

aS
un

[900000000000

aS
un

[990000000 0G 0 0

Page 22

                      39.35% AEP
           Duration          1     2      3       4       5       10       15    20   25   30   45
           Flow              0     0   0.012   0.012   0.012    0.023    0.022    0    0    0    0
                                                                0.022    0.025    0    0    0    0
                                                                0.022    0.027    0    0    0    0
                                                                0.026    0.028    0    0    0    0
EXISTING




                                                                0.024    0.026    0    0    0    0
                                                                0.024    0.029    0    0    0    0
                                                                0.022    0.032    0    0    0    0
                                                                0.025    0.034    0    0    0    0
                                                                0.022     0.04    0    0    0    0
                                                                0.023    0.041    0    0    0    0
           AVERAGE           0     0   0.012   0.012   0.012   0.0233   0.0304    0    0    0    0
           CLOSEST           0     0   0.012   0.012   0.012    0.023    0.029    0    0    0    0
           MAX                                                           0.029



                      39.35% AEP
           Duration          1     2      3       4       5       10       15    20   25   30   45
           Flow              0     0   0.006   0.006   0.006    0.014    0.024    0    0    0    0
                                                                0.014    0.025    0    0    0    0
                                                                0.014    0.026    0    0    0    0
                                                                0.015    0.026    0    0    0    0
ULTIMATE




                                                                0.014    0.026    0    0    0    0
                                                                0.014    0.027    0    0    0    0
                                                                0.014    0.028    0    0    0    0
                                                                0.015    0.028    0    0    0    0
                                                                0.013     0.03    0    0    0    0
                                                                0.014    0.029    0    0    0    0
           AVERAGE           0     0   0.006   0.006   0.006   0.0141   0.0269    0    0    0    0
           CLOSEST           0     0   0.006   0.006   0.006    0.014    0.027    0    0    0    0
           MAX                                                           0.027


[OCR of page images]
EXISTING

ULTIMATE

39.35% AEP

Duration 1 2
Flow 0 0
AVERAGE 0 0
CLOSEST 0 0
MAX

39.35% AEP

Duration 1 2
Flow 0 0
AVERAGE 0 0
CLOSEST 0 0

MAX

0.012 0.012 0.012 0.023
0.022
0.022
0.026
0.024
0.024
0.022
0.025
0.022
0.023
0.012 0.012 0.012 0.0233
0.012 0.012 0.012 0.023

3 4 5 10
0.006 0.006 0.006 0.014
0.014

0.014

0.015

0.014

0.014

0.014

0.015

0.013

0.014

0.006 0.006 0.006 0.0141
0.006 0.006 0.006 0.014

15
0.022
0.025
0.027
0.028
0.026
0.029
0.032
0.034

0.04
0.041
0.0304
0.029
0.029

15
0.024
0.025
0.026
0.026
0.026
0.027
0.028
0.028

0.03
0.029
0.0269
0.027
0.027

N
oO

[90000 0000000

N
oO

99000 0000 CA 0 0

N
u

[90000 0000000

N
u

99000 0000 CA 0 0

w
oO

[90000 0000000

w
oO

99000 0000 CA 0 0

aS
un

[900000000000

aS
un

[990000000 0G 0 0

Page 23

                      63.2% AEP
           Duration          1    2      3       4       5        10       15    20   25   30   45
           Flow              0    0   0.009   0.009   0.009    0.009     0.016    0    0    0    0
                                                               0.009      0.02    0    0    0    0
                                                               0.009      0.02    0    0    0    0
                                                               0.012     0.021    0    0    0    0
EXISTING




                                                                0.01      0.02    0    0    0    0
                                                               0.011     0.021    0    0    0    0
                                                               0.009     0.021    0    0    0    0
                                                               0.011     0.022    0    0    0    0
                                                               0.009     0.024    0    0    0    0
                                                                0.01     0.025    0    0    0    0
           AVERAGE           0    0   0.009   0.009   0.009   0.0099     0.021    0    0    0    0
           CLOSEST           0    0   0.009   0.009   0.009      0.01    0.021    0    0    0    0
           MAX                                                           0.021



                      63.2% AEP
           Duration          1    2      3       4       5        10       15    20   25   30   45
           Flow              0    0   0.004   0.004   0.004    0.005     0.012    0    0    0    0
                                                               0.004     0.012    0    0    0    0
                                                               0.004     0.012    0    0    0    0
                                                               0.005     0.013    0    0    0    0
ULTIMATE




                                                               0.005     0.014    0    0    0    0
                                                               0.005     0.014    0    0    0    0
                                                               0.005     0.013    0    0    0    0
                                                               0.005     0.014    0    0    0    0
                                                               0.004     0.014    0    0    0    0
                                                               0.005     0.015    0    0    0    0
           AVERAGE           0    0   0.004   0.004   0.004   0.0047    0.0133    0    0    0    0
           CLOSEST           0    0   0.004   0.004   0.004    0.005     0.013    0    0    0    0
           MAX                                                           0.013


[OCR of page images]
EXISTING

ULTIMATE

63.2% AEP

Duration 1 2 3 4
Flow 0 0 0.009 0.009
AVERAGE 0 0 0.009 0.009
CLOSEST 0 0 0.009 0.009
MAX
63.2% AEP

Duration 1 2 3 4
Flow 0 0 0.004 0.004
AVERAGE 0 0 0.004 0.004
CLOSEST 0 0 0.004 0.004

MAX

0.009 0.009
0.009

0.009

0.012

0.01

0.011

0.009

0.011

0.009

0.01

0.009 0.0099
0.009 0.01

5 10
0.004 0.005
0.004

0.004

0.005

0.005

0.005

0.005

0.005

0.004

0.005

0.004 0.0047
0.004 0.005

15
0.016
0.02
0.02
0.021
0.02
0.021
0.021
0.022
0.024
0.025
0.021
0.021
0.021

15
0.012
0.012
0.012
0.013
0.014
0.014
0.013
0.014
0.014
0.015

0.0133
0.013
0.013

N
oO

CO0o OOO OOOO ao

N
oO

99000 0000 CA 0 0

N
u

CO0o OOO OOOO ao

N
u

99000 0000 CA 0 0

w
oO

[90000 0000000

w
oO

99000 0000 CA 0 0

aS
un

[900000000000

aS
un

[990000000 0G 0 0

Page 24

                                                                                                   ingeniir


Appendix 3 | Example Detention Tank Products




                                      Ingeniir Pty Ltd | 215101-SMP-01
        ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                 Page 14 | 14

Page 25

                         3,000L SLIMLINE TANK
                         FITTING DIAGRAM



                                                                          2,020mm 2,600mm             820mm     125kg    660gal




                                                              Inlet Strainer


             Overflow                                                                                              Overflow




           Outlets                                                                                                      Outlets




     PLEASE INDICATE YOUR FITTING REQUIREMENTS:
     Pre-drill:                                    POSITION
                                                   Please indicate where you would like to position
               Yes                                 the Cleanable Highflow Overflow.
                                                                                                              LEFT OR RIGHT
               No                                  Left or Right
                        Cleanable
                        Highflow Overflow




               Yes
                                                   POSITION
                        Water                       Please indicate where you would like to position the      LEFT OR RIGHT
               No       Marked                      Ball Valve. Located at base of tank at both ends.
                        Ball Valve
OPTIONAL




               Yes
                                                   POSITION
                                                   Please indicate where you would like to position
                                                                                                              LEFT OR RIGHT
               No
                        Lockable                   the Tap Fitting. Located approx knee height.
                        Tap Fitting




                                            Email to [email protected] or fax: 3881 0209.

Page 26

            *




*




    *
                Do not scale drawing. Use written dimensions only




                Issue      Date           Amendment                       App'd


                  ARDILL PAYNE
                  & PARTNERS

                  79 Tamar Street
                  P.O. Box 20                 Telephone:       02 6686 3280
                  BALLINA NSW 2478            Facsimile:       02 6686 7920
                  A.B.N. 113 861 522 12        e-mail: [email protected]

                Client:




        *       Project:




                Title:




                Scale                         Datum



                Design                        Date



                Drawn                         Dwg Filename



                Checked                      Approved



                Job No.                       Dwg No.                   Issue

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Appendix D- Stormwater Management Plan.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.