9. LIMITATIONS
This report has been written based on Ingeniir’s understanding of the required scope at the time of writing;
and is written for the purposes of Robyn Kildey and not to be used for any other purpose.
To the extent permitted by law, Ingeniir expressly disclaims and excludes liability for any loss, damage, cost or
expenses suffered by any third party relating to or resulting from the use of, or reliance on, any information
contained in this report. Ingeniir does not admit that any action, liability or claim exist or be available to any
third-party, and disclaims any liability resulting from the inaccuracy of third-party information supplied to
Ingeniir for use in this report.
Ingeniir Pty Ltd | 215101-SMP-01
ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
Page 11 | 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix D- Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.